Full-Time

Airside Geometric & Grading Engineer

AECOM

AECOM

10,001+ employees

Global infrastructure consulting and program management

No salary listed

Gurugram, Haryana, India

In Person

In-person Day 1 onboarding at an AECOM office is required.

Bachelor's

Category
Architecture & Civil Engineering (1)
Required Skills
AutoCAD
Excel/Numbers/Sheets

Get referred to AECOM

See people who can refer or advise you

Requirements
  • Bachelor's Degree in Civil Engineering from a recognized university or institution.
  • 2–3 years of relevant experience in civil infrastructure design.
  • Good understanding of civil engineering fundamentals and geometric design principles.
  • Strong Civil 3D modelling and drawing production skills.
  • Ability to interpret survey data and develop practical grading solutions.
  • Ability to perform independent design checks.
  • Ability to work in a multidisciplinary design environment.
  • Willingness to learn airport-specific design standards and practices.
  • Ability to manage assigned deliverables within agreed timelines.
  • Proficiency in AutoCAD, Civil 3D, and Microsoft Excel.
Responsibilities
  • Undertake horizontal and vertical geometric design of airport airside infrastructure in accordance with applicable International Civil Aviation Organization, Federal Aviation Administration, Directorate General of Civil Aviation, and project-specific requirements.
  • Develop grading and level designs for runways and runway strips, taxiways and taxiway intersections, rapid exit taxiways, aprons and aircraft stands, holding bays and link taxiways, service roads, and other airside infrastructure.
  • Prepare and review longitudinal profiles, cross-sections, grading plans, and setting-out drawings.
  • Develop grading solutions considering aircraft operational requirements, longitudinal and transverse slopes, sight-distance requirements, pavement drainage, existing ground conditions, and tie-ins with existing airside facilities.
  • Prepare earthwork quantities and cut-and-fill calculations and assist in optimizing grading to minimize earthworks.
  • Develop and maintain Civil 3D surfaces, alignments, profiles, corridors, and grading models.
  • Coordinate airside grading with stormwater drainage, pavement, utilities, airfield ground lighting, navigational aids, and other infrastructure.
  • Review topographical survey data and identify discrepancies, constraints, and interface issues affecting the design.
  • Assist in preparing detailed design drawings, good-for-construction drawings, design reports, technical specifications, and bills of quantities.
  • Carry out design checks against applicable airport geometric design standards.
  • Support senior engineers in airport master planning, feasibility studies, and detailed engineering design.
  • Participate in interdisciplinary coordination and resolve design interfaces with other engineering disciplines.
  • Assist in responding to technical queries from clients, contractors, and site teams.
  • Review drawings and models prepared by junior team members or computer-aided design technicians when required.
Desired Qualifications
  • Experience in airport or airside infrastructure design is preferred.
  • Strong experience in highway geometric design and Civil 3D, with an interest in transitioning to airport engineering, may also be considered.
  • Good analytical and problem-solving capability.
  • Attention to detail.
  • Good communication and coordination skills.

AECOM is a global infrastructure consulting firm that provides a wide range of services, including architecture, design, construction management, engineering, environmental services, and program management, to government agencies, private companies, and non-profits. Its work centers on managing and delivering large-scale infrastructure projects, from planning and design to construction and operation, with fees tied to the project type and scope. Unlike firms with a narrower focus, AECOM offers end-to-end support across transportation, buildings, cities, and overall infrastructure, combining technical expertise with project oversight and sustainability considerations. The company aims to improve the world by enhancing natural and social systems, promoting equity and inclusion, and driving responsible, lasting outcomes for communities.

Company Size

10,001+

Company Stage

IPO

Headquarters

Dallas, Texas

Founded

1990

Get referred to AECOM

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • August 2026 backlog rose 13% despite the project charge, proving demand remains strong.
  • Hong Kong headquarters investment supports Northern Metropolis and SKYTOPIA work across Asia.
  • South Africa's July 2026 graduate program deepens talent pipelines and lowers future hiring friction.

What critics are saying

  • August 10, 2026 revealed a $337 million project charge and 98% cash-flow collapse.
  • Multiple securities investigations since June 2026 target AECOM's disclosures and management credibility.
  • Delayed construction claims and Middle East headwinds threaten another margin reset through fiscal 2027.

What makes AECOM unique

  • AECOM spans advisory, design, engineering, construction management, and program management worldwide.
  • July 30, 2026 Hong Kong headquarters strengthens Asia delivery and client proximity.
  • Record $27.8 billion backlog and 1.6 book-to-burn show winning power.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Flexible Work Hours

Hybrid Work Options

Professional Development Budget

Growth & Insights and Company News

Headcount

6 month growth

3%

1 year growth

3%

2 year growth

3%
Yahoo Finance
Aug 17th, 2026
AECOM misses revenue and EPS estimates by over 16% on legacy project troubles

AECOM reported disappointing second quarter results, missing revenue estimates by 16.7% with $3.59 billion versus expected $4.31 billion, and posting an adjusted loss per share of $0.50 against analyst expectations of $1.46 profit. The infrastructure firm attributed the shortfall to delays and cost overruns on a legacy construction management project, affected by subcontractor productivity issues. Management lowered full-year adjusted earnings guidance to $4.05 per share at the midpoint, down 32.5%. CEO Troy Rudd said the troubled projects should complete by mid-2027, whilst CFO Gaurav Kapoor noted claims remain around $600 million. Operating margin fell to negative 2.1% from 7% year-on-year. The company reported backlog of $27.82 billion, up 13.1% year-on-year, and indicated business development efforts are yielding immediate returns with healthy win rates.

Yahoo Finance
Aug 17th, 2026
AECOM misses Q2 revenue by 16.7% with $3.59B sales, posts -$0.50 EPS loss on project delays

AECOM reported disappointing Q2 CY2026 results, missing revenue expectations with $3.59 billion in sales, a 14.2% year-on-year decline. The infrastructure consulting firm posted a non-GAAP loss of $0.50 per share, significantly below analyst estimates of $1.46 profit per share. Management attributed the shortfall to delays and cost overruns on a legacy construction management project, citing subcontractor productivity issues. CEO Troy Rudd noted that slower new project starts and Middle East headwinds also weighed on performance. The company lowered its full-year adjusted earnings guidance to $4.05 per share at midpoint, down 32.5%. However, backlog grew 13.1% year-on-year to $27.82 billion. CFO Gaurav Kapoor warned of continued cash burn through the first half of fiscal 2027 as the company works through project challenges.

Associated Press
Aug 12th, 2026
AECOM faces securities fraud investigation after $337M project loss and 98% cash flow drop

Law firm Glancy Prongay Wolke & Rotter LLP has launched a securities fraud investigation into AECOM on behalf of investors. The investigation follows a sharp decline in the company's stock price after disappointing financial results. AECOM announced its second quarter fiscal 2026 results on 11 May, revealing operating cash flow had dropped 98% year over year to $4 million. The company attributed the poor performance to longer-than-anticipated claim resolution on projects bid in 2019 and 2020. AECOM's stock fell 12% following the announcement. On 10 August, the company reported third quarter results showing revenue declined 14% year over year, including a $337 million pre-tax loss from a delayed Construction Management project. Shares dropped a further 8.39%.

Financial Modeling Prep
Aug 12th, 2026
Aecom (NYSE: ACM) stock analysis: price target vs. Legal challenges.

Aecom (NYSE: ACM) stock analysis: price target vs. Legal challenges. Aug 12, 2026 Market News FMPAecom (NYSE: ACM) stock analysis: price target vs. Legal challenges. * UBS analyst sets a positive price target for Aecom (NYSE: ACM) stock, indicating potential upside. * The company faces a securities fraud investigation following its Q2 fiscal 2026 results. * Aecom reported a substantial quarterly loss per share, significantly missing analyst estimates due to a large pre-tax charge. Aecom (NYSE: ACM) is a global infrastructure consulting firm that designs, builds, finances, and operates infrastructure assets for governments, businesses, and organizations. A UBS analyst sets a new stock price target of $85.00 for Aecom. At the time of the report, the Aecom stock was trading at $62.75, which represents a potential increase of about 35.47%. This positive outlook contrasts with recent company challenges. As highlighted by Business Wire, The Law Offices of Frank R. Cruz announces a securities fraud investigation into Aecom. The investigation follows the company's second-quarter fiscal 2026 results and concerns possible violations of federal securities laws. Shareholders who lost money are encouraged to contact the firm. Financially, the company faces headwinds. Aecom reported a quarterly loss of $0.50 per share, missing the Zacks Consensus Estimate of $1.49 per share. This results in a negative earnings surprise of -133.56%, which means the company's actual earnings were significantly lower than what financial analysts had predicted for the quarter. A key reason for the poor results is a pre-tax charge of $337 million. This charge is mainly due to delays on a large Construction Management project. The company now expects this project to be completed near the end of the second quarter of fiscal 2027, later than the original first-quarter projection. The stock's performance reflects these issues. Shares of Aecom are trading at $62.84, a decrease of 6.28% for the day. The stock also set a new 52-week low of $62.55, which is far from its yearly high of $135.52. The company currently has a market capitalization of approximately $8.08 billion. Market news and analyst rating coverage Alex Lavoie covers market-moving news and analyst activity for the FMP blog, summarizing price-target changes, upgrades and downgrades, earnings results, and company developments. The focus is on turning timely market events into concise, data-backed updates that help readers stay current on the companies they follow. Financial data for every need. Real-time quotes and 30+ years of historical data, including prices, fundamentals, and insider transactions - all accessible via API. Stock Screener 2017-2026 (C) FMP

Yahoo Finance
Aug 10th, 2026
Aecom reports $86.7M Q3 loss, misses analyst expectations with 50-cent per share deficit

Aecom Technology Corp reported a fiscal third-quarter loss of $86.7 million, or 67 cents per share, after posting a profit in the same period last year. Adjusted losses came to 50 cents per share, missing Wall Street's average estimate of $1.49 per share earnings. The Dallas-based technical and management support services provider posted revenue of $3.59 billion, with adjusted revenue of $1.61 billion. The company expects full-year earnings between $3.95 and $4.15 per share. Aecom shares have declined 23% since the start of the year. Shares traded at $73.30 on Monday, down 38% over the past 12 months.