Full-Time

Senior Electrical Engineer

Origis Energy

Origis Energy

51-200 employees

Develops solar energy and storage assets

No salary listed

Austin, TX, USA

Hybrid

Hybrid role; 3 days on-site Tue-Thu, 2 days remote Mon/Fri.

Bachelor's, Master's

Category
Electrical Engineering (1)

Get referred to Origis Energy

See people who can refer or advise you

Responsibilities
  • Serve as Origis Energy’s electrical engineering technical authority, with primary ownership of inverter-related standards and specifications and broader oversight of electrical system design criteria.
  • Coordinate with internal engineering teams to develop, maintain, and continuously improve electrical and inverter technical specifications, design standards, and guidelines.
  • Support compliance with applicable reliability and grid requirements, including NERC reliability standards as applicable to inverter-based resources and plant electrical systems.
  • Collaborate with Supply Chain to establish, maintain, and technically qualify Approved Vendor Lists (AVL) for inverters and key electrical equipment.
  • Support technical evaluations of electrical equipment vendors and emerging technologies.
  • Establish and maintain strong working relationships with inverter OEM sales, engineering, service, and warranty teams.
  • Represent Origis Energy in technical discussions with EPCs, OEMs, utilities, consultants, and independent engineers.
  • Act as the primary subject matter expert for inverter technology, power electronics, and inverter-based resource behavior for PV and BESS plants.
  • Provide technical leadership on inverter-based resource capabilities related to reactive power, voltage regulation, frequency response, and grid-support performance in accordance with utility, interconnection, and reliability requirements.
  • Evaluate inverter technologies, control modes, and electrical system configurations for applicability, performance, and risk across the portfolio.
  • Provide technical review and guidance on electrical system designs including single-line diagrams, DC string and collection systems, inverter integration, MV and LV collection systems, grounding, transformers, and overall plant electrical architecture.
  • Support construction teams by advising on inverter installation, commissioning plans, testing procedures, and acceptance criteria.
  • Review commissioning results and support resolution of inverter and electrical system issues during startup.
  • Work closely with Operations, Asset Management, EPCs, and OEMs to troubleshoot and resolve inverter and electrical system issues.
  • Support root-cause analyses for inverter and electrical system failures or underperformance.
  • Collaborate with internal teams to develop and deliver inverter and electrical system training for engineering, construction, and operations personnel.
  • Share lessons learned and best practices across the organization.
Desired Qualifications
  • Bachelor’s degree in electrical engineering or related field (master’s degree preferred).
  • 5+ years of experience in utility-scale solar PV and/or BESS projects, with strong expertise in inverter-based systems.
  • Deep understanding of inverter technology, power electronics, and utility-scale electrical systems.
  • Experience supporting projects across development, engineering, construction, and operations.
  • Familiarity with applicable electrical codes, standards, and utility requirements (e.g., NEC, IEEE, UL).
  • Strong analytical, troubleshooting, and problem-solving skills.
  • Ability to clearly communicate complex technical topics to a wide range of stakeholders.
  • Relevant certifications (e.g., NABCEP, manufacturer-specific) are a plus.
  • Detail-oriented, highly organized.
  • Proactive and strategic thinker.
  • Supplier management.
  • Creativity in problem solving.
  • Ability to multi-task and manage timelines and budgets.
  • Effective collaboration across multiple functional teams.
  • Strong verbal and written communication skills.
  • Continuous improvement mindset.

placeholder

Company Size

51-200

Company Stage

Debt Financing

Total Funding

$5.1B

Headquarters

Miami, Florida

Founded

2008

Get referred to Origis Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • July 2026 Rockhound expansion added 500 MWdc, strengthening Origis's flagship Texas platform.
  • June 2026 financing unlocked over 5GW late-stage projects across a 20GW pipeline.
  • April 2026 RBC tax equity and long PPAs validate bankability for California and Texas assets.

What critics are saying

  • October 2025 SVCE and 3CE sued Origis over a claimed $200 million scheme.
  • N.D. California breach case can freeze California expansion and damage utility relationships by 2027.
  • Texas projects depend on tax equity and debt markets; a 2026 refinancing shock slows builds.

What makes Origis Energy unique

  • July 2026 Rockhound hit nearly 1 GWdc, proving multi-phase execution scale.
  • June 2026 Origis closed a $900 million corporate facility for 5GW late-stage development.
  • Origis sells long-term contracted solar-plus-storage to Meta, Occidental, Pioneer, and utilities.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Paid Vacation

401(k) Retirement Plan

401(k) Company Match

Growth & Insights and Company News

Headcount

6 month growth

22%

1 year growth

22%

2 year growth

22%
List Solar
Jul 31st, 2026
Origis boosts Texas Rockhound Solar to 1 GW.

Origis boosts Texas Rockhound Solar to 1 GW. Jul 31, 2026 12:07 PM ET * Origis Energy launches three more Rockhound Solar phases in Ector County, Texas - adding 500 MWdc. The complex now operates at nearly 1 GWdc, boosting clean energy output. Origis Energy has begun commercial operations for three additional phases of its Rockhound Solar complex in Ector County, Texas, totaling 500 MWdc across the new additions. With the latest phases online, the complex's total operating capacity has risen to nearly 1 GWdc, according to the company. What boosts Rockhound Solar's capacity to nearly 1 GWdc in Ector County? * The commercial start-up of three newly added Rockhound Solar phases in Ector County, each adding generation capacity to the overall site. * Increased solar module deployment across the additions (more panels/arrays installed within the complex footprint). * Expanded power conversion equipment (inverters/transformers) sized to convert the added DC output to usable grid power. * More array strings and land-use area brought into service, effectively enlarging the project's active generating capacity. * Grid interconnection and on-site electrical upgrades enabling the additional blocks of capacity to operate together as part of one integrated complex. * Continued build-out and commissioning that brings each phase from construction through performance verification, allowing full nameplate output to count toward total capacity.

PV Tech
Jul 30th, 2026
Origis Energy inaugurates first half of 2GW Texas solar-plus-storage complex.

Origis Energy inaugurates first half of 2GW Texas solar-plus-storage complex. July 30, 2026 Features, Interviews US solar developer Origis Energy has built the first 1GW of solar PV capacity at its planned massive 2GW Rockhound solar-plus-storage facility in Texas. The company announced the completion of around 500MW of new capacity at the site today, across three project phases. The Rockhound complex in Ector County, Texas, includes the already operational Swift Air Solar projects, which are under long-term power supply contracts with Houston-based petroleum company Occidental (Oxy).

PV Tech
Jun 19th, 2026
Origis raises US$900 million to fund 5GW of project development.

Origis raises US$900 million to fund 5GW of project development. June 19, 2026 Features, Editors' Blog Independent power producer (IPP) Origis Energy has secured a US$900 million corporate financing package, consisting of US$650 million in funded credit facilities and a US$250 million letter of credit facility. According to the firm, the proceeds from the facility will support the advancement of more than 5GW of late-stage projects within its solar and storage development portfolio, while also funding the continued growth of its broader pipeline, which exceeds 20GW. 13 October 2026 San Francisco Bay Area, USA PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is its fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States. 24 November 2026 Warsaw, Poland

Renewables Now Ltd
Jun 4th, 2026
BHI provides $75M as part of $900M facility for Origis Energy's 22 GW renewables pipeline

BHI, the US subsidiary of Israel's Bank Hapoalim, has provided $75 million in financing to renewable energy developer Origis Energy as part of a $900 million syndicated corporate credit facility. BHI served as co-lead arranger for the facility. The financing will support Origis Energy's expansion across the US renewable energy market. Miami-based Origis develops, owns and operates solar and battery energy storage projects, with a development portfolio of 22 GW spanning major US power markets including CAISO, ERCOT, MISO and the Southeast. The company currently has 2.9 GW of capacity operational or under construction, with a development pipeline of 19 GW across 110 projects. Of that total, 6.9 GW is in advanced development stages.

PR Newswire
Apr 8th, 2026
Origis Energy Secures Tax Equity from RBC for California Solar + Storage Project

/PRNewswire/ -- Origis Energy, one of America's leading clean energy platforms, today announced the closing of $118M in tax equity financing from RBC Community...