Full-Time

Chemical Operator

Sealants

PPG Industries

PPG Industries

10,001+ employees

Manufactures paints, coatings, and specialty materials

Compensation Overview

$26/hr

No H1B Sponsorship

Mojave, CA, USA

In Person

On-site role in Mojave, California; local candidates preferred.

Category
Operations & Logistics (1)

Get referred to PPG Industries

See people who can refer or advise you

Requirements
  • Able to work in any area of the department.
  • Manually lift to 50 LBS.
  • Flexible to be pulled from one job to the next and then go back to first job as needed.
  • Able to work using a respirator. For men, must be clean shaven to wear PPE (respirator)
  • Able to climb fixed ladders, portable ladders, extension ladders.
  • Able to work overtime as necessary.
  • Able to stand/sit for long periods and frequently use stairs, catwalks, and ladders.
Responsibilities
  • You must perform all job tasks in a safe manner by following all the mandatory safety requirements and guidelines.
  • Ability and willingness to adjust to change and to be assigned to any production area in the department or work on other non-production-related tasks.
  • Work safely and make good judgement in all work situations.
  • Effectively resolve and troubleshoot problems.
  • Work effectively with others to accomplish goals and take ownership.
  • Start up and stop equipment.
  • Take and follow instructions from supervisors. Able to follow documented step-by-step instructions and accurately document completion of each step.
  • Work with equipment following set safety procedure, including working with hazardous chemicals, laboratory, and other devices.
  • Maintains continuity among work teams by documenting and communicating actions, irregularities, and continuing needs.
  • Maintains safe and clean work environment by complying with procedures, rules, and regulations.
  • Perform basic quality and process checks.

PPG Industries makes paints, coatings, and specialty materials for homes, cars, aircraft, and industrial uses. Its products are formulated to protect and beautify surfaces, from architectural coatings to automotive OEM/refinish, industrial, packaging, and marine coatings, as well as specialty materials. The company leverages a long history and a broad, diversified product portfolio to offer scale, technical capabilities, and coordinated color and material solutions, while pursuing sustainability programs. Its goal is to provide durable, high-quality coatings and materials that protect surfaces, enhance appearance, and support customers’ performance and environmental objectives.

Company Size

10,001+

Company Stage

IPO

Headquarters

Pittsburgh, Pennsylvania

Founded

1983

Get referred to PPG Industries

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • PPG’s Q2 2026 aerospace organic growth accelerated with nearly $300 million backlog.
  • PPG QUICKLINE launched August 2026, strengthening U.S. and Canada refinish shop adoption.
  • PPG reaffirmed 2026 EPS guidance and kept dividend growth after Q2 results.

What critics are saying

  • PPG’s Q2 2026 industrial and performance coatings margins fell despite 7% revenue growth.
  • PPG still faces chromium cleanup liability from the New Jersey plant case.
  • Rain Drop Products sued PPG in May 2026, signaling ongoing contract and customer disputes.

What makes PPG Industries unique

  • PPG’s 135-year coatings scale spans aerospace, automotive, architectural, and industrial markets.
  • PPG launched AEROVIEW in July 2026, pairing aerospace coatings with digital visualization.
  • PPG’s Ohio expansion adds waterborne basecoat, primer, and automated quality control.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

Parental Leave

Company News

PCI Magazine
Aug 11th, 2026
PPG breaks ground on $280 million Ohio coatings expansion.

PPG breaks ground on $280 million Ohio coatings expansion. August 11, 2026 PPG has broken ground on a new advanced manufacturing facility at its existing site in Delaware, Ohio, as part of a more than $280 million investment to expand automotive coatings production. The 100,000-square-foot facility will add advanced waterborne basecoat and primer production, clearcoat manufacturing, real-time quality evaluation and automated material movement. PPG said the new processes are designed to reduce waste while improving water and energy efficiency. Looking for a reprint of this article? From high-res PDFs to custom plaques, order your copy today! JOIN TODAY to unlock your recommendations. Already have an account? Sign In

AeroTime
Aug 6th, 2026
Boeing Air Force One delays worsen as report reveals interior design problems.

Boeing Air Force One delays worsen as report reveals interior design problems. 2 hours ago Boeing's long-delayed efforts to field two new Air Force One aircraft faces more setbacks as interior design problems continue to disrupt wiring, structural work and preparations for flight testing, according to a new government report. The Pentagon report released on August 3, 2026, said the design for the VC-25B cabin remains behind schedule because of unresolved technical and certification issues. VC-25B is the official Air Force designation for the two modified Boeing 747-8s that will replace the current presidential aircraft fleet, designated VC-25A. The slow progress is affecting other parts of the modification program and forcing Boeing to redo work as designs change, according to the report, which was prepared as part of the Pentagon's fiscal 2027 budget submission. "The design maturity for the aircraft interior continues to lag due to numerous technical and certification issues," the report said. The work includes a new executive interior, upgraded electrical power, secure communications, military avionics, defensive systems and equipment that will allow the aircraft to operate with less ground support. Problems with the interior date back several years. Boeing lost its original cabin supplier, GDC Technics, after terminating the company's contract in 2021. It later moved the work to another supplier, but the transition slowed the design and certification process. The latest report said delays to the cabin have spread into wiring design and fabrication as well as structural modifications to the two aircraft. This has resulted in "inefficient engineering work" and repeated changes to parts of the airplanes that Boeing had already begun modifying. The Air Force is working toward delivery of the first aircraft in 2028 and the second in 2029. The report warned that the planned test schedule will be difficult to meet if more unexpected work emerges or testing takes longer than expected. Boeing said in July that it still expects to deliver the first VC-25B in 2028. The company recorded another $280 million loss on the program during the second quarter after adding production and certification resources in an effort to protect the schedule. Boeing has also agreed with the Air Force to shift the aircraft from FAA certification to a military certification process. Company officials said the change and the added resources should help reduce risks during certification and flight testing. Repairs are still needed for cracks found in structural stringers on both 747-8s. As of April, 95 repairs or installations remained on the first aircraft and 142 on the second, according to the report. Stringers run along the fuselage and help carry structural loads. The program is also dealing with a shortage of certified 747-8 cockpit windshields. The report said there were no spare commercial 747-8 windshields available. Supplier PPG was working on a replacement design that still needed certification, while also developing a modified version for the VC-25B. Passenger windows are creating another problem. Supplier GKN has struggled to meet strict limits on defects and particles inside the window assemblies. Any further delays could hold up pressurization tests, interior installation and ground and flight testing. The VC-25B program has suffered repeated schedule setbacks and billions of dollars in losses since Boeing accepted a $3.9 billion fixed-price contract in 2018. Earlier Air Force reports had already identified wiring, interior work, worker shortages and slow modification rates as major risks. A 2023 report said Boeing had lost much of the time built into its schedule even before the latest delivery targets were established. The current VC-25As are modified Boeing 747-200s that entered service in 1990. The Air Force plans to keep both aircraft available until the replacements can carry out the full presidential airlift mission. Meanwhile, the Qatari-donated Boeing 747-8, which the Trump administration has used as a temporary Air Force One, is being taken out of service temporarily to undergo additional modifications to improve its security and mission capabilities. "The Air Force remains postured to keep the VC-25A aircraft available and mission ready until the VC-25B can support full mission requirements," the latest report said.

European Coatings
Aug 4th, 2026
New vice president, Industrial Coatings Americas, at PPG.

New vice president, Industrial Coatings Americas, at PPG. PPG has announced that Justin Epler has been appointed vice president, Industrial Coatings (IC) Americas, effective 1 August 2026. Epler will succeed Hendekea Azene, who has decided to leave PPG for an outside opportunity. 4 August 2026 Epler brings deep knowledge of the region and IC business over 15 years, most recently serving as general manager of the IC EMEA region. While in this role, he delivered measurable performance improvements across the region over a three-year tenure, including a stronger focus on commercial excellence and disciplined planning. Prior to leading the IC EMEA region, he served as director of coil and building products in IC Americas for nearly five years. He holds a Bachelor of Science in Marketing and International Business Management from Saint Vincent College.

ABP Club
Aug 3rd, 2026
USA: PPG - launch PPG QUICKLINE waterborne refinish system for bodyshops in U.S. and Canada

USA: PPG - launch PPG QUICKLINE waterborne refinish system for bodyshops in U.S. and Canada 04th August 2026 03rd August 2026 In order to view the full article please login to its members area.

Yahoo Finance
Jul 29th, 2026
PPG Q2 earnings miss estimates at $2.23 per share despite 7% sales growth to $4.5B

PPG Industries reported second-quarter 2026 adjusted earnings of $2.23 per share, up 0.5% year-over-year but missing the consensus estimate of $2.26. Revenues rose 7.2% to $4.5 billion, beating estimates of $4.36 billion. Organic sales increased 4%, driven equally by higher volumes and selling prices. The aerospace division achieved double-digit organic growth with an order backlog near $300 million. Performance Coatings sales increased 7% to $1.62 billion, though EBITDA margin contracted to 22.7% from 25.7% previously. Global Architectural Coatings sales advanced 8% to $1.1 billion, with EBITDA margin expanding to 19.4% from 18.4%. Industrial Coatings sales rose 7% to $1.78 billion, whilst EBITDA margin declined to 15.9% from 16.6%.