Full-Time

Manager Cost Control

Oncorr

Posted on 7/17/2025

Metrolinx

Metrolinx

5,001-10,000 employees

Runs regional transit and fare system

No salary listed

Canada

In Person

Category
Finance & Banking (2)
,
Required Skills
Financial analysis
Risk Management
Requirements
  • Completion of a degree in Business Administration, Construction Management, Engineering, Accounting or a related discipline – or a combination of education, training and experience deemed equivalent.
  • Demonstrated progressive experience leading cost management processes in large, complex multi-billion dollar, and multi-project construction and infrastructure environments. Exposure to different delivery models including Alliance, Progressive Design Build and Construction Management at Risk.
  • A recognized accounting designation (CPA/CA/CMA/CGA), Certification from Association for the Advancement of Cost Engineering (AACE), Project Management Professional (PMP) Certification or Certified Cost Professional (CCP) is/are considered an asset.
  • Knowledge of Human Resources legislation (e.g. Employment Standards Act, Occupational Health & Safety Act, etc.) to manage and direct employees and contractors, including experience in the application of collective agreement provisions.
  • Knowledge and experience in accounting, financial analysis, controllership, risk management and reporting principles and practices in large, complex multi-billion dollar and multi-project construction and infrastructure environment.
  • Influencing skills to convince senior management, colleagues, clients and vendors of the need to adhere to financial/cost control processes.
  • Analytical and problem-solving skills to conduct complex and comprehensive financial analysis, assessment and evaluation of financial reporting activities and to identify potentially contentious issues that expose the Metrolinx to risk and recommend appropriate options.
  • Governance and accountability, quality management systems and risk mitigation strategies to use a risk assessment lens to identify and address risks, issues and accounting implications for the project baseline.
  • Proficiency in MS Office (Word, Excel, PowerPoint, Outlook) and other financial software tools and applications to document and illustrate financial standing and recommendations.
  • Experience with project management and cost management systems (e.g Ecosys, Unifier, Primavera P6) is an asset.
  • Interpersonal and oral/written/presentation skills to represent the Capital Finance Division in dealing with all financial payment and invoice inquiries, to resolve problems; to manage relationships with vendors; to identify and make necessary changes to financial controls, policies and procedures.
Responsibilities
  • Monitors and report on costs against approved budgets, schedules, and contractual deliverables within and across large and mission critical projects. Monitors the statistical and trends analysis of contracts and payout of contracts. Analyze variances, identify risks, and recommend mitigation strategies to senior leadership and project stakeholders.
  • Lead and develop a high-performing team of Project Financial Control Officers and Cost Controllers, fostering a culture of accountability, financial discipline, and continuous learning.
  • Leads continuous cost reporting with accurate and timely information of budget, commitments, forecast, trends, variances, progress, performance, risk and opportunity, contingency, and cashflow. Conducts ongoing analysis of project risks during execution, working closely with Program Management Office Leads to optimize contingency strategies.
  • Develops, implements and maintains project cost control systems, operational procedures and reporting systems to control the flow of funds for capital projects in accordance with Metrolinx financial policies and procedures.
  • Provides advice to Project Control Directors and other stakeholders across the business in all matters related to cost control systems and procedures to achieve on-time and on-budget goals.
  • Builds collaborative relationships with senior organizational leadership and gains trust with stakeholders (e.g. customers, other business units) to foster good relations, gain support, develop resources, drive results, realize project outcomes, manage conflicts, and represent the needs of customers, stakeholders, operations, and maintenance.
  • Leads the development and presentation of materials to a variety of internal and external audiences to engage staff/stakeholders and promote further awareness and buy-in of Metrolinx objectives and the Metrolinx five-year strategy.
  • Creates a working environment that is aligned with the organization’s desire to be a “best company to work for”, ensuring that people resources possess the required skills, are properly aligned, and are provided with the resources to do the job.
Desired Qualifications
  • A recognized accounting designation (CPA/CA/CMA/CGA), Certification from Association for the Advancement of Cost Engineering (AACE), Project Management Professional (PMP) Certification or Certified Cost Professional (CCP) is/are considered an asset.
  • Experience with project management and cost management systems (e.g Ecosys, Unifier, Primavera P6) is an asset.
  • Proficiency in MS Office (Word, Excel, PowerPoint, Outlook) and other financial software tools and applications to document and illustrate financial standing and recommendations.

Metrolinx is a government agency in Ontario that plans, finances, and coordinates transportation across the region. It runs GO Transit, UP Express, and the PRESTO fare system, and steers major investments to improve how people travel. How it works: it manages regional transit services and the fare network, partners with municipalities and other agencies, and directs infrastructure projects to create a connected travel system. How it differs from competitors: it is a public sector, multi‑modal regional operator and planner focused on coordinating services and fares across communities, rather than a single private operator. Its goal is to connect communities and make travel faster, easier, and more convenient through large investments and integrated networks.

Company Size

5,001-10,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Toronto, Canada

Founded

2007

Simplify Jobs

Simplify's Take

What believers are saying

  • Hamilton LRT procurement advances with $42 million spent October-December 2025.
  • Province commits $1.6 billion to Hamilton LRT's $3.2 billion budget.
  • Body cameras deploy spring 2026 to boost safety on GO and UP Express.

What critics are saying

  • Phil Verster's departure delays Hamilton LRT by 3-6 months.
  • One Fare program causes ongoing revenue leakage from fare evasion.
  • Body cameras trigger privacy lawsuits within 6-12 months.

What makes Metrolinx unique

  • Metrolinx operates GO Transit, UP Express, and PRESTO as Ontario's key transit agency.
  • Launched One Fare program in February 2024 for seamless inter-agency payments.
  • Awarded Acciona consortium Line 5 Eglinton westward extension contract.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Hybrid Work Options

Company News

Toronto Star
Mar 27th, 2026
Body cameras, dash cams coming to GO trains and UP Express, says Metrolinx.

Body cameras, dash cams coming to GO trains and UP Express, says Metrolinx. Metrolinx said the staff-worn body cameras and vehicle cameras, to start this spring, will "enhance safety and security for both customers and employees." Staff and their vehicles along the GO Transit and UP Express networks will be equipped with cameras starting this spring. Metrolinx announced the move is a bid to "to enhance safety and security for both customers and employees." The transit agency said its Customer Protection Officers, Revenue Protection Officers and Station Safety Ambassadors would have body-worn cameras," to record audio and video during interactions." The device would only be turned on during "specific interactions," Metrolinx said in a news release. That includes safety incidents, investigations or in incidents where customers fail to show valid proof of payment. ARTICLE CONTINUES BELOW "Officers are trained to let customers know when recording begins," Metrolinx said. "A flashing red light and audible beep means the camera is active." Dash cameras will be installed in Customer Protection Officers' vehicles to capture the same incidents as on the body cameras, "providing a more complete and consistent record of events." Cameras for safety, accountability, Metrolinx says. Metrolinx said the goal of their body and dash cameras are to "help promote fairness." "Cameras encourage accountability for everyone involved, promote fair behaviour during interactions, provide clearer evidence when incidents need to be reviewed, and support greater transparency across the system," the agency behind GO Transit and UP Express said. They cited research on body-worn camera programs that suggest cameras reduce violent confrontations with staff. Metrolinx also claimed the camera program has "strong safeguards" in place to protect privacy. "All footage is stored securely, with strict access controls so only authorized personnel can review it," Metrolinx said. An exact date for the programs rollout was not provided. Daniyah Yaqoob is a staff reporter with the Toronto Star. She can be reached at [email protected].

Varsity Publications Inc.
Mar 23rd, 2026
UTSU 2025-2026 in review.

UTSU 2025-2026 in review. Looking back at UTSU under President Melani Veveçka's tenure As the newly elected President Marie Kinderman prepares to assume the office for the 2026-2027 term, The Varsity discussed the union's accomplishments with the current president, Melani Veveçka. During the 2025-2026 term, University of Toronto Students' Union (UTSU) launched a second round of its partnership with Metrolinx, and implemented the Respect, Educate, Empower Survivors (REES) project at U of T in collaboration with the Sexual Violence Prevention Centre. The union also continued consultations on bidet initiatives. $100,000 for student aid funding In response to a question about the achievements of UTSU this year, Veveçka wrote in an email to The Varsity that it was difficult to pinpoint a single defining achievement, instead emphasizing the breadth of initiatives undertaken. However, if she had to choose one, "it would be the emergency referendum for student aid funding... I worked closely with the members of my team who were available and with our Board of Directors to draft, promote, and pass a referendum that now will generate an additional $100,000 in funding for student aid at a minimal cost to students through the membership fee." She added that this funding would help ensure support systems remain in place as new Ontario Student Assistance Program (OSAP) policies take effect after her term. "I would not suggest that any student union can resolve every concern within a single term [...] I believe the UTSU had a positive and measurable impact on students' experience this year," Veveçka wrote. Initiatives in progress Veveçka acknowledged that some initiatives remain incomplete, including the creation of an affordable, "grab-and-go" healthy food option in the Student Commons. While the project has not been finalized, she said the UTSU has been in discussions with Regenesis, completed initial scoping, and identified a viable model for grab-and-go. Veveçka expressed confidence in Kinderman, who "shares this same goal and brings strong experience through their own work with Regenesis," to bring the project to completion. Another ongoing initiative is the flexible Credit/No Credit policy. Veveçka explained that UTSU collaborated with the Scarborough Campus Students' Union (SCSU) and the University of Toronto Mississauga Students' Union (UTMSU) to draft a proposal, which is now being prepared for presentation to university administration and registrars. "The foundation is there, and I trust it will be carried through." Veveçka wrote. Reflecting on the scope of the union's role, Veveçka noted that certain decisions - such as tuition costs - are made at provincial and institutional levels. "The UTSU can advocate on those issues, and we do," she wrote. Addressing criticisms Regarding student groups' disappointment with a perceived lack of public statements from the UTSU on international conflicts, Veveçka emphasized the union's approach of connecting students with appropriate resources. "Throughout this term, students have approached the UTSU for support in relation to a range of concerns, including those about international events. In every case, we have worked to ensure those students were connected with the appropriate resources available to them, including mental health services, financial assistance, and relevant institutional support," she wrote. In response to questions about whether internal tensions within UTSU affected its operation, Veveçka denied the existence of any turmoil, "[We are] a professional body, and every individual who serves on this executive does so with an understanding that the role carries obligations of conduct that are not discretionary." Last words before leaving the office According to Vevecka, the UTSU's role "is to represent student interests within the existing decision-making structures, not to substitute for them. This is a meaningful distinction, and I think it's important for students to understand it as an accurate description of where the UTSU's authority begins and ends." Veveçka expressed gratitude for the collaborative environment her team built to accomplish the union's achievements beyond the outcomes themselves. "I owe a great deal of thanks to a great deal of people. To my executive team, to the permanent staff at the UTSU, to the student clubs and groups who trusted us enough to bring us their concerns and their ideas (and who held us accountable). And, of course, to the student body, for trusting me with this responsibility and giving me the opportunity in the first place." 0 Comments View all comments No comments to display.

CityNews Kitchener
Nov 26th, 2025
Weekend service disruptions on Kitchener GO line

Weekend service disruptions on Kitchener GO line. Some service disruptions will affect travel on the Kitchener GO line this weekend. Metrolinx, the provincial operator, is conducting track work ahead of a further expansion of the Kitchener line. It comes one week after the new times for trains between the region and Toronto launched. On Friday, Nov. 27, the 11:34 p.m. train leaving Toronto's Union Station will not be running. Riders to the region will have to take an earlier train home. Then on Saturday and Sunday, no trains will be running between the Bramalea GO Station and Union in either direction. The Kitchener line will end at Bramalea. GO buses will take riders from Bramalea to the 407 GO station, where they can connect to the TTC. There are a few other disruptions around the GTA. It's a good idea to check routes carefully. Metrolinx says service will return to normal on Monday.

Bradford Today
Nov 12th, 2025
Town ponders future transit yard for woodlot near Dissette Street

Town ponders future transit yard for woodlot near Dissette Street. Opportunity to 'save some money' while municipality prepares to expand and make permanent its on-demand transit pilot 'the right thing to do,' says Bradford mayor 1 / 2 Argo X1 electric fully-accessible buses are seen during the launch event for Bradford's on-demand transit pilot at the town's community hub on April 7, 2025. Michael Owen/BradfordToday Advertisement An unassuming woodlot may go largely unnoticed by most, but it could become key to the future of transit in Bradford West Gwillimbury. Based on a report from deputy chief administrative officer Mahesh Ramdeo, committee of the whole recommended Nov. 4 that council authorize using a town-owned property on Dissette Street as a transit yard. That's expected to help with town's future plans to expand and make permanent its on-demand transit pilot. Mayor James Leduc described the idea as "the right thing to do." "Whoever our service provider is... it's going to be a cost for us to pay for their yard," he said. "This is a good opportunity for us to save some money, based on this piece of property you can't do much more with." The town currently has a request for proposals out to potential transit operators, who will likely require a local place to park buses when not in use. As that cost is likely to be passed onto the town as part of the contract, Ramdeo explained it's in the town's best interest to make some property available. Roughly 6,070 square metres, that property (with no street address) lies north of the Bradford GO Transit station and south of Dominion Farms Produce, and as a result of limitations from the rail lines has few permitted uses. However, a vehicle parking area is one of them, according to the report. Ward 5 Coun. Ferragine suggested the town should use the property to build a generic parking lot that could be used by GO train riders for now, and then convert it into a transit yard once needed. Building on that idea, Ward 4 Coun. Joseph Giordano suggested investigating the possibility of using the property for both purposes. However, Ward 2 Coun. Jonathan Scott noted the property - which is about 330 metres from the station - isn't ideal for commuter parking. Ward 3 Coun. Ben Verkaik also noted that Metrolinx previously acquired two other neighbouring properties (which used to house a car wash and auto shop) and that so far only one of them has been used to expand the station parking lot. Currently, the town-owned property is mostly wooded and Ramdeo suggested that if the future transit provider chooses to lease it, the town will pay to have it cleared and filled using the 2026 transit budget. From there, it will be up to the provider to make any other upgrades necessary. The same property was previously considered as the site for a battery electric storage system, but Alectra later determined it wasn't feasible in that location. We welcome your feedback and encourage you to share your thoughts. We ask that you be respectful of others and their points of view, refrain from personal attacks and stay on topic. To learn about our commenting policies and how we moderate, please read our Community Guidelines. If you would like to apply to become a Verified Commenter, please fill out this form.

Railway Technology
Sep 2nd, 2025
Acciona-led consortium lands light rail expansion contract in Canada

A consortium led by Acciona has secured a contract from Metrolinx for the design and construction of the westward extension of Line 5 Eglinton in Ontario, Canada.

INACTIVE