Full-Time

Wind Turbine Technician

Power

Deadline 8/28/26
Iberdrola Group

Iberdrola Group

10,001+ employees

Global utility generating renewable energy

No salary listed

Company Does Not Provide H1B Sponsorship

San Diego, United States

In Person

On-site in Sarita, Texas; occasional travel to other sites (approx. 10-15%).

Certification

Category
General Maintenance & Repair (2)
,
Required Skills
Quality Assurance (QA)
Oscilloscope

Get referred to Iberdrola Group

See people who can refer or advise you

Requirements
  • One year college or technical school certificate; or 12 months of related experience or wind industry training; or equivalent combination of education and experience; High School Diploma or GED.
  • Familiarity with maintenance and electronic testing equipment. (i.e. voltage testers, amp clamps, oscilloscopes, megohmmeters, infrared testers, hydraulic torque equipment, alignment and various hand and power tools).
  • Advanced computer skills utilizing word processing, spreadsheets, email, facility control, management and reporting systems, including the use of computerized diagnostic, and troubleshooting tools.
  • Ability to climb towers up to 100 meters daily to perform maintenance in the nacelle and hub.
  • Ability to frequently lift items weighing up to 60 pounds and occasionally lift items up to 100 pounds.
  • Ability to work with electrical wires and differentiate between color coded wires.
  • Ability to interpret and follow a variety of instructions furnished in written, oral, diagram, or schedule form.
  • Ability to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists.
  • Knowledge of heavy equipment required for facility maintenance with a working knowledge of crane and rigging requirements.
  • Demonstrated teamwork, initiative and positive attitude.
  • Valid driver's license and acceptable driving record.
  • Weight must not exceed 285lbs excluding equipment/gear worn when performing job related tasks.
Responsibilities
  • Operate and maintain wind turbine equipment along with associated infrastructure including substation, collection, and transmission systems.
  • Read schematics and proficiently troubleshoot complicated mechanical, electrical, and hydraulic problems with variable pitch, variable speed control systems and components.
  • Perform mechanical and electrical component repair or replacement of parts to correct malfunctions following all manufacturers' requirements.
  • Comply with all project environmental health and safety programs.
  • Perform preventive maintenance in accordance with OEM maintenance manuals.
  • Adhere to effective internal controls.
  • Perform data collection and prepare reports to meet wind plant reporting requirements.
  • Perform various retrofits and design modifications.
  • Perform various QA/QC functions, compile and submit supporting documents of items found. If applicable, support Construction in the Mechanical and Commissioning walk-downs.
Desired Qualifications
  • Experience in power plant operations and maintenance.
  • Experience in wind and solar plant construction, operation, and maintenance; including, specific experience in wind turbine and solar power converters and inverters.
  • Experience in high voltage switching.
  • Related experiences gained in fields that require a strong electrical and mechanical aptitude.
  • Qualified candidates living in or near the greater local area.

Iberdrola is a Spanish electric utility that develops and delivers electricity from renewable sources such as wind, solar, hydro, and hydrogen. It generates, transmits, distributes, and sells power and also offers energy services like smart grids and efficiency solutions for homes and businesses. Its products work by producing clean electricity and delivering it through its networks while providing tools to improve energy use and grid performance. The company aims to accelerate the shift to a low-carbon economy by expanding renewables, modernizing grids, and investing in sustainable technologies across Europe, the US, Brazil, Mexico, and Australia.

Company Size

10,001+

Company Stage

IPO

Headquarters

Bilbao, Spain

Founded

2008

Get referred to Iberdrola Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • June 2026 green bond demand exceeded €4.5 billion, signaling elite credit-market access.
  • Iberdrola completed Neoenergia squeeze-out by mid-May 2026, simplifying governance and cash extraction.
  • July 2026 EIB-backed Italy buildout adds 400 MW of wind and solar capacity.

What critics are saying

  • Spain's CNMC opened blackout probes in April 2026, threatening fines and operating constraints.
  • Iberdrola's Redeia lawsuits deepen reputational damage and distract executives through 2026.
  • A severe grid-incident finding could freeze permits, tighten oversight, and undermine the decarbonization story.

What makes Iberdrola Group unique

  • Iberdrola mixes regulated grids with renewables, reducing merchant-power volatility across continents.
  • Its 2026 financing strategy keeps capital cheap: €1.5 billion green bonds, €600 million hybrid.
  • Full control of Neoenergia gives Iberdrola Brazil's largest distribution platform and 40 million customers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Paid Vacation

401(k) Company Match

Health Insurance

Dental Insurance

Life Insurance

Company News

Europe Says
Jul 24th, 2026
Project Finance Brief: Iberdrola Receives $160 Million for Wind and Solar Projects - Spain

Iberdrola, a Spanish multinational electric utility, received a €150 million (~$160 million) green loan agreement from the European Investment Bank to develop

PR Newswire
Jun 29th, 2026
Iberdrola picks ICEYE's SAR satellites to protect grid from extreme weather

Iberdrola has selected ICEYE to strengthen its electricity grid against extreme weather events using synthetic aperture radar satellite technology and near real-time data. The solution will help anticipate risks including floods, fires and strong winds, assess damage quickly and minimise impact on electricity supply. The initiative won a New-Tech Challenge within Iberdrola's PERSEO innovation programme, receiving over 40 proposals from ten countries. The 12-month pilot will launch in Spain, with ICEYE's Flood Solutions Suite providing forecasting, rapid impact assessment and flood insights. The deployment also includes wind damage assessment solutions for Iberdrola's assets in the United States and Australia. ICEYE's SAR technology can capture high-resolution imagery through smoke and storm clouds, enabling continuous monitoring in all weather conditions day or night.

World-Energy
Apr 2nd, 2026
Iberdrola Signs a Loan of 150 Million Euros With the Eib for Solar and Wind Energy in Italy - World-Energy

The loan will be used to build 400 MW of a portfolio of wind and photovoltaic projects in various locations in Italy. These will be Iberdrola’s first renewable plants in ItalyThe projects will make a significant contribution to Italy’s security of ene

Diari ARA
Apr 1st, 2026
Wallbox restructures $191.5M debt with Spanish banks as Catalan government takes stake

Wallbox, the Barcelona-based electric vehicle charging systems company, has closed a debt restructuring agreement worth €169.5 million with creditors representing over 83% of its financial debt. The deal includes a capital increase that will bring the Generalitat of Catalonia in as a shareholder. The agreement, pending judicial approval and scheduled for signing on 8 April, restructures existing debt into a €57.6 million framework loan and a €69.1 million bullet instrument, both maturing in December 2030. A working capital agreement of approximately €42.8 million was also reached. The restructuring includes a €10.65 million capital increase, with strategic shareholders contributing €5.65 million and the Generalitat adding €5 million. Participating banks will provide €12.5 million in new financing. CEO Enric Asunción said the agreement strengthens Wallbox's financial position.

Iberdrola
Mar 26th, 2026
ScottishPower secures £600m National Wealth Fund green financing for strategic UK subsea power link Eastern Green Link 4

ScottishPower, through its parent company Iberdrola, has secured £600 million in financing from the National Wealth Fund to support the development of the Eastern Green Link 4 project, a strategic electricity interconnector that will strengthen the UK's energy security and self-sufficiency, while helping to meet its