Full-Time

Process Engineer

Bilingual in Mandarin Preferred

Posted on 12/13/2025

Canadian Solar

Canadian Solar

51-200 employees

Designs, manufactures, and sells solar modules

No salary listed

Louisville, KY, USA

In Person

Category
Process Engineering
Requirements
  • Bachelor’s degree in engineering with major in chemical, material science, microelectronics, or any related field
  • Preferred with at least 1-2 years experiences in solar cell industry or process engineering function. Positions/levels are commensurate of skills and experiences. Fresh graduates are qualified for entry level positions.
  • Excellent communication and interpersonal skills, with the ability to build and maintain strong relationships with team members, other departments, vendors, and other stakeholders.
  • Responsible, able to complete tasks independently and on-time, fast learner, with technical and problem solving skill
  • Working knowledge in process engineering, production and quality systems
  • Commitment to safety and quality standards in all aspects of equipment engineering and maintenance.
  • Able to work overtime, off-shift or extended hours to realize 24/7 production requirement, support scheduled / unscheduled process and equipment recovery inside production line or any other situation deemed necessary by the supervisor
Responsibilities
  • Optimize and improve solar cell conversion efficiency, yield, reliability and cost associated with the process and implement related projects according to the process KPI and timelines.
  • Identify causes, resolve and prevent production line and customer issues by using problem solving methods and best industry practices. Drive for continuous improvement in the process, procedures, materials and equipment. Write and present detailed reports in a timely manner to communicate projects and issues in the production line.
  • Lead, manage and train process technicians in carrying daily routine tasks. Ensure continuous skill improvement of the technicians by doing regular trainings and assessment
  • Qualify, stabilize, improve technology and/or product transfer, new processes, materials and equipment to support production and quality requirements. Review and improve process CpK
  • Coordinate and work with internal cross functional team and overseas affiliates to benchmark and implement cell efficiency improvement and cost reduction projects
  • Create, maintain, improve and continuously update relevant documentation such as SOP, FMEA, Control Plans, OCAP, maintenance procedures and others as required by the company’s quality policy.
  • Support other company KPIs such as safety, output, yield, quality, product delivery, company certifications, 5S and other related initiatives as provided by the management
  • Complete trainings to improve technical and leadership skills. Write training materials, conduct trainings and maintains training records of the technicians. Remain current in the industry technology trends.
  • Other activities and tasks assigned by supervisors

Canadian Solar manufactures solar photovoltaic modules and manages large-scale solar energy projects for residential, commercial, and utility customers. These products work by converting sunlight into electricity using high-efficiency cell designs, while the company provides the necessary kits and maintenance services to keep these systems running. It distinguishes itself through a massive portfolio of over 1,500 patents and a top "bankability" rating, which signals to investors that its technology is a reliable financial bet compared to other manufacturers. The company's goal is to improve the performance of renewable energy by developing more efficient solar hardware and providing end-to-end support for power plant development.

Company Size

51-200

Company Stage

N/A

Total Funding

N/A

Headquarters

Cambridge, Canada

Founded

2001

Simplify Jobs

Simplify's Take

What believers are saying

  • Mesquite Texas plant operational since 2024 with 5 GW capacity.
  • Delivered 15.7 GWp solar projects since 2010 worldwide.
  • Battery storage shipments reached 18 GWh with 15 GWh capacity.

What critics are saying

  • Chinese rivals JinkoSolar and LONGi hold 60% market share eroding margins.
  • U.S. tariffs raise Mesquite costs using Asian inputs in 2026.
  • Recurrent Energy pipeline faces 3-5 year U.S. permitting delays.

What makes Canadian Solar unique

  • Canadian Solar shipped 174 GW modules using N-type TOPCon cells.
  • Operates 20+ facilities across Asia and Americas with 51.8 GW capacity.
  • Recurrent Energy holds 24 GWp solar and 83 GWh storage pipeline.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

Flexible Work Hours

Paid Vacation

INACTIVE