Full-Time

Project Plant Lead Engineer

GE Vernova

GE Vernova

1,001-5,000 employees

Global energy provider: power, wind, electrification

No salary listed

Pallavaram, Chennai, Tamil Nadu, India + 2 more

More locations: Kolkata, West Bengal, India | Noida, Uttar Pradesh, India

In Person

Relocation assistance is provided. Travel in the region and work in different locations for short or medium periods may be required.

Bachelor's

Category
Electrical Engineering (1)

Get referred to GE Vernova

See people who can refer or advise you

Requirements
  • A bachelor's degree in electrical engineering or a related field from an accredited college or university.
  • At least 12 years of experience in extra-high-voltage/high-voltage air-insulated and gas-insulated substation design.
  • Good understanding of power system components, including transformers, switchgear, and protection systems, and renewable energy integration.
  • Excellent communication skills to explain complex technical concepts to technical and non-technical stakeholders.
  • Strong analytical and problem-solving skills, with the ability to balance technical requirements and business needs.
  • Ability to work collaboratively across teams and with clients.
  • Ability to guide and groom the team and execute projects in line with client and project requirements.
  • Ability to expand the competency domain and take on new learning challenges.
  • Good knowledge of engineering interfaces with civil, mechanical, and secondary engineering.
  • Successful experience managing engineering teams.
  • Strong influencing and relationship-building skills.
  • Knowledge of project execution risks and financial processes.
  • Willingness to work in different locations for short or medium periods and to travel globally within the region.
  • Demonstrated presentation skills and ability to communicate complex messages succinctly.
  • Demonstrated ability to lead in an unstructured environment and deliver results.
  • Demonstrated ownership and accountability, judgment and decision-making, ability to influence and inspire the team, and ability to create a vision and strategy.
  • Global experience and mindset, including high technical, cultural competence, and sensitivity.
Responsibilities
  • Provide technical expertise for the design of electrification solutions for high-voltage direct-current and extra-high-voltage/high-voltage substations.
  • Perform plant engineering, system design, material selection, quantity estimation, and project engineering activities.
  • Prepare basic single-line diagrams, overall plant layout plans and sections, equipment control-room layouts, earthing layouts, DSLP layouts, and trench layouts.
  • Perform earthing design, lightning design, cable sizing, battery sizing, illumination system design, sag-tension calculations, short-circuit-force calculations, and busbar sizing according to Institute of Electrical and Electronics Engineers and International Electrotechnical Commission standards.
  • Select and size project equipment according to Institute of Electrical and Electronics Engineers and International Electrotechnical Commission standards.
  • Ensure proper implementation of the plant engineering process.
  • Convert project contractual documents into plant engineering requirements.
  • Define or control plant engineering planning to ensure on-time project delivery.
  • Release plant engineering deliverables according to project planning and cost requirements without nonconformity.
  • Support plant engineering planning and project cost estimation.
  • Lead plant engineers for assigned projects through functional reporting.
  • Lead optimized substation and building layout design while integrating equipment installation, operation, and maintenance constraints.
  • Interface with other disciplines.
  • Answer technical queries from clients, partners, and suppliers regarding plant engineering.
  • Organize and perform project design and gate reviews related to plant engineering and support other disciplines' reviews when required.
  • Lead change control affecting plant engineering deliverables and activities.
  • Evaluate vendor drawings, guaranteed technical particulars, calculations, and technical specifications.
  • Prepare tender drawings and bill-of-quantities estimates, finalize requests for quotation, evaluate components, and select equipment with the best pricing options.
  • Learn and adopt global developments in renewable technologies.
  • Coordinate with the Global Engineering Centre, regions, and business lines according to project requirements.
Desired Qualifications
  • Experience with high-voltage direct-current or flexible alternating-current-transmission-system integrated project applications.
  • Competency with specialized tools such as CANECO, ETAP, CDGES, or equivalent.
  • Working experience with three-dimensional design tools such as Revit, ACC, and Navisworks.

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders jumped 88% to 24.2 billion, driven by AI data centers.
  • GE Vernova booked over 5 billion of data-center orders in 1H26.
  • Management raised 2026 revenue guidance to 45.5 billion-46.5 billion and free cash flow to 11.5 billion-12.5 billion.

What critics are saying

  • Wind losses widened to 275 million in Q2 2026, crushing margins.
  • Vineyard Wind sued GE Vernova on April 10, 2026 over contract abandonment and blade failures.
  • If offshore wind stays broken, GE Vernova exits a capital sink and loses credibility.

What makes GE Vernova unique

  • GE Vernova’s gas turbines and GridOS span generation, transmission, and distribution.
  • Scott Strazik is stacking 116 GW of gas contracts and 176.3 billion backlog.
  • GridOS for Distribution launched February 3, 2026; Transmission followed June 9.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Aug 7th, 2026
GE Vernova holds $176B backlog yet stock dips 5% as wind losses and spending increases spook investors

GE Vernova, General Electric's former energy division spun off in 2024, reported a $176.3 billion backlog in Q2 2026, up 37% year-over-year. The company's growth has been driven by expanding cloud, AI, and data centre markets requiring increased power infrastructure. Total orders surged 89% in the first half of 2026, with Power and Electrification segments rising 99% and 131% respectively. GE Vernova expects full-year revenue growth of 19% to 22%. Despite strong performance, shares declined 5% over the past month whilst the S&P 500 gained 3%. The pullback followed Q2 results where adjusted EBITDA and earnings per share missed Wall Street expectations due to increased capacity spending and additional losses in the Wind division.

Yahoo Finance
Aug 6th, 2026
GE Vernova books $176B backlog with 134% gas order growth as Eaton rides 65% data center surge

GE Vernova and Eaton released second-quarter 2026 results highlighting surging demand from AI infrastructure buildout. Vernova reported $5.50 billion in Power segment revenue with gas equipment orders up 134% organically. The company booked $2.7 billion in data centre orders during the quarter alone and expects to reach at least 125 gigawatts of gas equipment under contract by year-end. Total backlog stands at $176 billion. Eaton posted revenue of $8.531 billion, up 21.39%, with adjusted earnings per share of $3.15. Data centre revenue grew roughly 65% in both its Electrical Americas and Electrical Global divisions. The Boyd Thermal liquid-cooling business, acquired for $9.55 billion in March, generated $432 million in second-quarter revenue. Vernova guided free cash flow to $11.5 billion to $12.5 billion, whilst Eaton raised its full-year earnings guidance to $13.40 to $13.60 per share.

Yahoo Finance
Jul 28th, 2026
GE Vernova deploys AirJoule water generation system at Frontier Campus research centre

GE Vernova has installed AirJoule Technologies' atmospheric water generation system at its Advanced Research Center Frontier Campus. This marks the first publicly disclosed collaboration between the two companies at this scale. The system provides a live demonstration of technology designed to address water and energy needs for industrial facilities and data centres. GE Vernova is using its Frontier Campus to showcase applied research in power and energy infrastructure. The deployment forms part of broader industry efforts to tackle water use, energy efficiency, and resiliency challenges facing heavy facilities and data centres. The installation gives GE Vernova a reference point when engaging industrial, utility, and data centre customers facing water and grid constraints. The collaboration may support GE Vernova's positioning in power infrastructure projects addressing resource-constrained environments.

Yahoo Finance
Jul 23rd, 2026
GE Vernova raises 2026 guidance as revenue hits $11.1B, orders surge 88%

GE Vernova reported mixed second-quarter 2026 results, missing earnings expectations but beating revenue estimates. The company posted revenues of $11.1 billion, up 22% year over year, driven by equipment growth in its Power and Electrification segments. Orders surged 88% organically to $24.2 billion, whilst backlog grew by $13 billion sequentially. The Power segment saw orders jump 134% organically, with revenues increasing 14% to $5.5 billion. Electrification revenues rose 66% organically to $6.3 billion. GE Vernova raised its 2026 guidance, now expecting revenues of $45.5-$46.5 billion and free cash flow of $11.5-$12.5 billion, up from previous forecasts. Data centre orders have exceeded $5 billion year to date, more than doubling 2025 figures, as the company benefits from growing electricity demand and grid modernisation efforts.

Fortune
Jul 23rd, 2026
GE's $593B comeback: How CEO Larry Culp pulled off history's greatest turnaround

GE CEO Larry Culp has orchestrated what many industry leaders consider the greatest corporate turnaround in modern business history. When he took over in 2018, GE's market capitalisation stood at $96 billion, down over 80% from its 2000 peak, with $150 billion in crushing debt. Today, the three companies Culp created from GE's breakup — GE Aerospace, GE Vernova, and GE HealthCare — have a combined market value of $689 billion. The trio has delivered annualised returns of roughly 30% since Culp's arrival, double the S&P 500's performance. GE Vernova has jumped over 600% whilst GE Aerospace has risen more than 160%. Culp's approach centred on lean manufacturing principles learnt from the Toyota Production System. He decentralised operations, eliminated three-quarters of central staff positions, and fostered a culture encouraging managers to spotlight problems rather than successes.