Full-Time

Excavator Operator

Deadline 8/21/26
The Walsh Group

The Walsh Group

1,001-5,000 employees

Design-build-finance-operate contractor for infrastructure projects

No salary listed

Apache Junction, AZ, USA

In Person

Category
General Maintenance & Repair (1)

Get referred to The Walsh Group

See people who can refer or advise you

Requirements
  • Ability to lift up to 50 pounds and work in adverse weather conditions as required.
  • Ability to comply with all safety policies and procedures.
  • Ability to communicate effectively with coworkers and supervisors to ensure projects are completed properly.
  • Good manual dexterity and ability to stand, bend, kneel, or sit for long periods.
  • Ability to pass a pre-employment drug screening.
Responsibilities
  • Operate an excavator to dig, excavate, and move or transport materials such as dirt, rocks, and other aggregates.
  • Operate equipment according to loading and unloading procedures.
  • Oil, grease, service, and make normal maintenance adjustments to equipment as needed.
  • Perform daily safety and maintenance checks.
  • Complete paperwork and other documentation as needed.
  • Perform other related duties as required.
Desired Qualifications
  • Three to five years of operating experience is preferred.

The Walsh Group provides design, build, finance, operation and activation services for large construction projects across many sectors. It delivers end-to-end project delivery by integrating design, construction, financing and long-term activation to move concepts into active facilities. It operates under Walsh Construction, Archer Western and Walsh Canada, with a 127-year family-led legacy, a broad range of projects, and a large workforce supported by substantial equipment. Its goal is to offer reliable, comprehensive delivery and ongoing activation for complex infrastructure and building programs.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Chicago, Illinois

Founded

1898

Get referred to The Walsh Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • June 2026 Second Avenue Subway Phase II award adds a $1.02 billion backlog anchor.
  • July 2026 Cherry Point award reaches $658.3 million with work extending to 2030.
  • Water awards in Carpinteria, San José, and Las Virgenes keep Walsh diversified and busy.

What critics are saying

  • Hudson Tunnel Package 1C and Second Avenue Subway depend on multiyear public funding and approvals.
  • Large JV wins with Skanska and Traylor dilute Walsh's pricing power and control.
  • Any safety lapse on tunnels, submarines, or airports triggers shutdowns, claims, and reputational damage.

What makes The Walsh Group unique

  • Walsh dominates heavy civil transit, winning Second Avenue Subway Phase II in June 2026.
  • Walsh Federal compounds federal strength with Cape Canaveral and Cherry Point defense megaprojects.
  • Walsh’s water platform expanded in July 2026 with new South Central and Central leadership.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Training Programs

Performance Bonus

Company News

Progressive Railroading
Jun 2nd, 2026
Major contracts awarded for MTA subway, Hudson Tunnel and CHSRA projects.

Major contracts awarded for MTA subway, Hudson Tunnel and CHSRA projects. The Metropolitan Transportation Authority has selected a joint venture (JV) of Skanska, Traylor Bros. Inc. and Walsh Construction to deliver design-build services for the $1 billion Phase II Second Avenue Subway project in New York City, which will extend the MTA New York City Transit's Second Avenue Subway (Q Line) to 125th Street. Phase II project scope includes the design and construction of new subway station structural shells for the future 106th Street Station, new tie-ins to existing tunnels and at- and below-grade structures for station entrances, Skanska officials said in a press release. The JV will also support excavation work, install roadway decking and reconstruct utilities. Phase II design services will be led by consulting firm Mott MacDonald. The Gateway Development Commission (GDC) awarded a $712 million contract to Skanska Creamer Sanzari NJSA joint venture for the Hudson Tunnel Project construction package three, known as the New Jersey Surface Alignment project. The JV will construct about 1.5 miles of infrastructure between the new passenger-rail tunnel under the Hudson River and existing Northeast Corridor tracks in New Jersey, GDC officials said in a press release. The infrastructure will support future tracks, signals and other railroad systems that will be installed as part of a future construction package. The JV will build 4,170 feet of retaining walls, an embankment, 3,150 feet of viaduct, new access roads, drainage structures, equipment platforms, stairs, and bridges over Secaucus Road and existing freight-rail tracks. Additionally, the JV will relocate utilities and an auxiliary signal power substation. The California High-Speed Rail Authority (CHSRA) has selected a consortium of Kiewit, Stacey Witbeck and Herzog to install high-speed rail track, overhead contact systems, train control and communications infrastructure for the 119-mile Central Valley segment of guideway. The Central Valley guideway is currently under civil construction, with over 80 miles completed. The segment will connect to the future Merced and Bakersfield extensions; track and systems installation will begin as soon as civil construction is completed on each segment, CHSRA officials said in a press release. CHSRA's recently completed southern railhead facility in Kern County will serve as the staging and distribution hub for rail, concrete ties, ballast and other key components.

PR Newswire
May 4th, 2026
Traylor/Walsh/Skanska JV wins $1.29B Hudson River tunnel contract

A joint venture comprising Traylor Bros., Walsh Construction and Skanska has been awarded a $1.29 billion contract to deliver the Hudson River Tunnel section of the Gateway Program's Hudson Tunnel Project. The Gateway Development Commission announced the award for Package 1C on 4 May. The contract involves boring two new parallel single-track tunnels, each approximately 7,250 feet long, beneath the Hudson River between Weehawken, New Jersey, and Manhattan's West Side. Work includes tunnel liner installation, nine cross passages connecting the tubes, and ground stabilisation near the Hudson Bergen Light Rail. The new tunnels are part of a broader project to improve Northeast Corridor rail service reliability whilst rehabilitating the existing North River Tunnel, which has operated since 1910 and sustained damage during Superstorm Sandy. Construction is expected to begin in the coming months.

RayHaber
Apr 29th, 2026
Historical excavation begins in Hudson River tunnel.

Historical excavation begins in Hudson River tunnel. The Gateway Development Commission (GDC) has officially inked a staggering $1.3 billion contract for the excavation of a groundbreaking tunnel beneath the Hudson River. This historic project aims to revolutionize regional rail connectivity, promising to shatter previous capacity limitations and streamline transit between New York City and New Jersey. Here's a detailed breakdown of what this entails and how it will reshape transportation infrastructure. Transportation efficiency tools The significance of the Package 1C contract. The awarded contract, known as Package 1C, represents a critical phase in the larger Hudson Tunnel project. Executed by a joint venture forming Traylor Bros. Inc., Walsh Group, and Skanska AB, this phase involves some of the most complex excavation and tunneling work to date in the region. With this contract in place, the project moves from planning to active construction, signaling a major leap forward. The focus of Package 1C is on excavating nearly 4.4 km of twin tunnels, which will provide two dedicated tunnels for passenger trains, drastically reducing congestion and increasing reliability. Innovative tunneling techniques and engineering marvels. This project employs state-of-the-art tunnel boring machines (TBMs), designed specifically for urban infrastructure challenges beneath active city environments. The TBMs will commence work from Weehawken, New Jersey, and extend underneath the river to Manhattan, marking one of the most ambitious tunneling efforts in recent history. * Two tunnel boring machines will operate simultaneously, enhancing efficiency. * The tunneling process is carefully monitored through extensive sensor networks to ensure safety and precision. Engineering challenges such as soil stability, groundwater management, and existing underground utilities require meticulous planning. The project team integrates innovative grouting techniques, real-time geological assessment, and advanced safety protocols to mitigate risks. Discover more Enhanced connectivity services Global logistics trends Transit service improvements Widening the infrastructure horizon: more than just tunnels. While the primary goal is expanding rail capacity, the project also encompasses critical auxiliary tasks: * Construction of nine new crossover points that allow trains to switch tracks seamlessly, increasing operational flexibility. * Reinforcement and expansion of the Willow Avenue Bridge to support increased traffic loads and withstand future demands. * Deep underground ground stabilization works to ensure the integrity of new tunnels and surrounding structures. These upgrades aim to bolster regional connectivity, reduce transit times, and facilitate smoother freight and passenger movement, ultimately boosting economic activity across the region. Impacts and future steps. The successful initiation of Package 1C paves the way for nearly 50% of the entire Hudson Tunnel project to be either under construction or completed. As the work progresses, expect significant benefits: * Increased capacity for Amtrak, NJ Transit, and other regional rail services, leading to less congestion. * Reducing travel times across the Hudson River makes commutes quicker and more reliable. * Job creation and economic stimulation during construction, with thousands of workers involved across various phases. Looking forward, strategic planning includes upcoming contracts for tunnel portals, ventilation systems, and electrification components, all of which are essential for the full operational readiness of the tunnel. Discover more World map posters GPS tracking devices Transportation industry reports Why this project matters: A regional game-changer. The Hudson Tunnel project exemplifies modern infrastructure innovation, addressing long-standing transportation bottlenecks. It integrates advanced engineering, big data, and sustainable construction practices to minimize environmental impact and maximize efficiency. Transportation efficiency tools By investing heavily in underground transit infrastructure, the GDC transforms the region into a model of urban mobility resilience. It positions the New York-New Jersey corridor for future growth, prepares the cities for increased population density, and sets a benchmark for large-scale infrastructure projects worldwide. Discover more Logistics management software Rail transport magazine Sustainable transportation options

DMG Media
Mar 21st, 2026
Push for a Donald Trump visit in September amid logistical nightmare.

Push for a Donald Trump visit in September amid logistical nightmare. 21/03/2026 US Ambassador to Ireland Ed Walsh is pushing for President Donald Trump to turn the sod on the new American embassy in Dublin in September. A visit to the capital by Mr Trump would create a logistical nightmare for the Government, with major road closures and shutdowns required to deal with expected protests. Today's top videos STORY CONTINUES BELOW The US president indicated this week, during Taoiseach Micheál Martin's visit to the Oval Office, that he is 'going to try' to visit Ireland in September. Mr Trump's golf resort in Doonbeg, Co. Clare, will host the Irish Open from September 10-13. Extra.ie understands that the trip is logistically tricky and will be 'very short' if it goes ahead, with Mr Trump flying into Shannon Airport on Air Force One and flying on Marine One to other locations. Mr Trump will have to be in the US for the 25th anniversary of the terrorist attack on the World Trade Centre on September 11. Extra.ie understands that Mr Walsh, a personal friend of the president, is pushing to have Mr Trump come to Dublin to officially break ground on the new embassy in Ballsbridge, Dublin 4. The pair, former golfing buddies, both have construction and real estate backgrounds. Prior to his appointment Mr Walsh was president of the Walsh Construction company, which he founded in 2003 in his home State of New Jersey. Mr Trump has a string of hotels, offices and golf resorts around the world. Mr Walsh has also been a member of the Trump National Golf Club in New Jersey. Since his appointment in June last year, Mr Walsh has placed a portrait of Mr Trump in the lobby of his Deerfield Residence in the Phoenix Park. The pair held a meeting on board Air Force One at Shannon Airport in January while the plane was refuelling on its return journey from the World Economic Forum in Davos. The US embassy will move from its current location at Elgin Road in Ballsbridge to the site of the former Jury's Hotel across the road. In 2024, the US embassy acquired the 4.2-acre site and is reported to be spending €641 million on the purchase, design, build and furnishing of the new embassy. According to the Associated Press, the US State Department's bureau of overseas building operations notified the US Congress that the cost of purchasing the former hotel amounted to €148 million. Formal discussions have not yet taken place about Mr Trump visiting multiple locations. While Mr Trump could visit the capital in an unofficial capacity, protocol would dictate that he meet with President Catherine Connolly at Áras an Uachtaráin. The five main takeaways from Micheál Martin's White House trip Earlier this month, President Connolly referred to the current war in the Middle East, instigated by the US and Israel on Iran, as 'deliberate assaults on international law'. During the Oval Office meeting on Tuesday, Mr Trump indicated that he did not know the Irish president was a woman when a member of the Irish press asked him about her comments. 'He's lucky I exist,' Mr Trump said. The Irish Government would have to decide whether to turn the trip into an official State visit, which would open the possibility for Mr Trump to address the Oireachtas. The White House did not reply to a request for comment about Mr Trump's travel plans last night.

Construction News and Report Group of Companies
Mar 12th, 2026
Walsh Federal breaks ground on $166M naval engineering test facility at Cape Canaveral

Walsh Federal breaks ground on $166M naval engineering test facility at Cape Canaveral. March 11, 2026 Florida Construction News staff writer Walsh Federal joined the U.S. Navy and the Naval Ordnance Test Unit (NOTU) this week to break ground on a $166 million Engineering Test Facility at Cape Canaveral Space Force Station. The 130,000-square-foot facility will support prototyping, development, testing, evaluation, and production of support equipment and flight hardware for the Trident II D5 Life Extension 2, a next-generation submarine-launched ballistic missile system.Naval Facilities Engineering Systems Command (NAVFAC) Southeast awarded a $165.7 million design-build-bid fixed-price-award-fee construction contract to Walsh last November, to modernize and consolidate the command's mission into a single, state-of-the-art facility on a 33.5-acre site. "The Resident Officer in Charge of Construction (ROICC) Space Coast field office was built to deliver this fast-tracked, 26-month construction project to support the Navy's D5 Trident II missile Life Extension program," Lt. Cmdr. Pete Fovargue, ROICC Space Coast said in a news release announcing the contract award. "The importance of the project centers around supporting, updating, and maintaining the weapon systems that will arm the Navy's new Columbia-class nuclear-powered submarines through the year 2084."The new building will include a high-bay, single-story layout with a mezzanine on a reinforced concrete foundation, steel frame superstructure, and reinforced concrete exterior wall panels. It will include large laboratory and test areas, as well as administration, mechanical, electrical, communications, and building services spaces. Several high-bay areas are designed to accommodate overhead bridge cranes, storage racks, and tall vertical test elements. "We have assembled a talented team and are ready to deliver this research and development facility for the first land-based test missile launches," Fovargue said. "We are eager to partner with this contractor to meet the high standards required for this one-of-a-kind engineering test facility." The contract includes two unexercised options that could raise the total value to $168.2 million. The project was competitively procured via the federal contracting website, with Walsh Federal selected using the Best Value Trade-Off Source Selection process from two offers received. Construction work is underway in Brevard County, with completion expected by January 2028. Discover more Cape Canaveral