Full-Time

Webber – Commissioning Engineer

Waterworks

Confirmed live in the last 24 hours

Ferrovial

Ferrovial

10,001+ employees

No salary listed

Junior

New Braunfels, TX, USA

Category
Water Resources Engineering
Architecture & Civil Engineering
Required Skills
Word/Pages/Docs
Excel/Numbers/Sheets
Requirements
  • Bachelor's Degree in Mechanical Engineering highly preferred
  • Bachelor's Degree in Construction Management or Civil Engineering or something similar will also be considered
  • 1-2 years’ experience in construction, commissioning projects preferred
  • Moderate to high level of proficiency operating Primavera 3 and 6
  • Moderate to high level of proficiency operating MS Excel, MS Outlook, MS Word, and MS PowerPoint
  • Be able to communicate in English via verbal and written communications
  • A demonstrated ability to multitask, be a self-starter, and have a passion for construction and a job well done
  • Significant and demonstrated experience in commissioning, construction, electrical and mechanical activities in the field
  • Ability to apply concepts of basic algebra and geometry and utilize Construction Math concepts
  • Valid driver license for occasional, required travel
  • Ability to define problems, collect data, establish facts, and draw valid conclusions
  • Ability to interpret an extensive variety of technical instructions in mathematical or diagram form and deal with abstract and concrete variables
  • Moderate physical activity performing somewhat strenuous daily activities of a primarily administrative nature
  • Ability to physically maneuver by foot minor obstacles at construction projects
  • Manual dexterity sufficient to reach/handle items and work with the fingers.
Responsibilities
  • Collaborate with Project team in Project Plans and Specs Review, Phasing definition, value to maximize efficiency in the field operations
  • Plant Process and Hydraulic profile Review
  • Temporary lines definition
  • Review Water treatment process, mechanical-electrical drawings and Submittals
  • Identify Startup and commissioning documents required by contract
  • Project IPP developing and implantation
  • Assist in ensuring that field tests are performed within project standards and specifications
  • Provide support for project engineers and superintendents as required
  • Vendor pre-startup check list and startup reports management
  • Assist in maintaining all Project Logs
  • Startup remaining works developing and follow up
  • Commissioning plan developing and follow up
  • Disinfection plan developing and follow up
  • Manufacturer schedule and management
  • Equipment performance monitoring
  • Training plan developing and implantation
  • Read and interpret documents such as safety rules, Operating and Maintenance Instructions, Procedure Manuals, Contracts, Subcontracts, and Purchase Orders
  • Other unlisted duties will be assigned.

Company Size

10,001+

Company Stage

IPO

Headquarters

Madrid, Spain

Founded

1952

Simplify Jobs

Simplify's Take

What believers are saying

  • Increased investment in IoT-enabled traffic management systems enhances operational efficiency.
  • Green bonds and sustainable financing offer new funding avenues for eco-friendly projects.
  • AI integration in predictive maintenance reduces downtime and maintenance costs.

What critics are saying

  • Increased competition in India may impact Ferrovial's investment in IRB Infrastructure Developers.
  • Rising global interest rates could increase financing costs for infrastructure projects.
  • Stricter European environmental regulations may lead to higher compliance costs.

What makes Ferrovial unique

  • Ferrovial's Cintra subsidiary acquired a 24.86% stake in IRB Infrastructure Developers.
  • Ferrovial is leveraging public-private partnerships for large infrastructure projects.
  • The company is investing in smart infrastructure technologies for enhanced operational efficiency.

Help us improve and share your feedback! Did you find this helpful?

Benefits

401(k) Company Match

Professional Development Budget

Company News

BNN Bloomberg
Mar 13th, 2025
AtkinsRéalis sells stake in 407 highway, rounding off turn to pure-play engineering

AtkinsRéalis Group Inc. reported its fourth-quarter profit fell compared with a year ago as it announced the sale of its remaining stake in Highway 407 ETR toll.

Market Research Telecast
Dec 29th, 2021
Cintra (Ferrovial) closes the purchase of 24.86% of India IRB Infrastructure Developers for 369 million - Market Research Telecast

Cintra, subsidiary of highways of Ferrovial, announced on Wednesday that it has closed the purchase of a stake in a 24,86% in IRB Infrastructure Developers…