Full-Time

Superintendent

High Voltage

Hut 8

Hut 8

11-50 employees

Public company operating Bitcoin mining centers

No salary listed

St Francisville, LA, USA

In Person

This is an on-site, project-based role.

Category
Architecture & Civil Engineering (1)

Get referred to Hut 8

See people who can refer or advise you

Requirements
  • At least 7 years of experience supervising high-voltage substation, switchyard, or transmission construction from 69kV to 345kV with a utility contractor, engineering, procurement, and construction organization, or utility construction organization.
  • Hands-on knowledge of substation construction practices, including major equipment setting, bus fabrication, grounding grids, control wiring, and commissioning support.
  • Direct experience coordinating utility outages, switching, clearances, and energization, including work in and around energized facilities under utility rules.
  • Familiarity with relay and protection testing sequences, including NETA and end-to-end testing, and utility acceptance and witness processes.
  • High-voltage safety leadership covering switching and tagging, minimum approach distances, grounding and bonding, arc-flash boundaries, and induced-voltage controls.
  • Experience managing specialty high-voltage subcontractors and NETA testing firms.
  • Ability to maintain documentation to utility-acceptance standards.
  • Ability to serve as the site's high-voltage authority and train adjacent trades on high-voltage hazards.
Responsibilities
  • Lead high-voltage and substation field execution for a new data center build and own day-to-day site operations for this scope.
  • Supervise construction of high-voltage substations and switchyards, including foundations and steel structures, bus work, breakers, power transformers, disconnects, grounding grids, and control enclosures.
  • Manage major equipment receiving and setting, including oil handling and SF6 procedures, and verify installation against utility and issued-for-construction design packages.
  • Coordinate daily with the serving utility on interconnection scope, clearances, switching orders, and planned outages.
  • Schedule and supervise work inside and adjacent to energized facilities under utility safety rules, hold points, and witness requirements.
  • Sequence and support relay testing, primary injection, double/megger testing, and end-to-end protection testing with NETA firms and the Protection and Controls Engineer.
  • Own energization readiness through punch completion, test record assembly, safety walkdowns, utility witness coordination, backfeed, and initial energization.
  • Enforce high-voltage safety requirements, including minimum approach distances, grounding and bonding, switching and tagging, arc-flash boundaries, and induced-voltage controls.
  • Partner with the Health, Safety, and Environment Manager on the energization-phase safety plan.
  • Own the high-voltage three-week look-ahead and manage specialty subcontractors and testing firms against schedule and quality commitments.
  • Provide accurate progress and constraint information to the Planner/Scheduler.
  • Maintain quality-control documentation, torque and termination records, test records, and as-builts to utility-acceptance standards.
  • Support turnover of high-voltage systems to operations with the commissioning, quality control, and quality assurance team.
Desired Qualifications
  • Occupational Safety and Health Administration 30-hour training is preferred.

Hut 8 is a large digital asset mining and data center operator in North America. It runs facilities that house Bitcoin mining hardware and other high-performance computing workloads, including services that self-mine, host third-party mining rigs, and manage infrastructure for clients using its own software. The company’s campuses are in New York, Nebraska, and Texas, and after merging with USBTC it became a publicly traded entity (HUT) on Nasdaq and the Toronto Stock Exchange, with a broader mix of revenue from economical mining, computing workloads, and hosted/managed services. What sets Hut 8 apart is its scale as a publicly listed miner, its diversified business model across self-mining, hosting, and managed infrastructure, and its partnerships with other big players (e.g., Celsius Network, Marathon Digital, Foundry USA). Its goal is to be a leading operator in the digital asset space by focusing on efficient, reliable mining operations and strong ESG practices.

Company Size

11-50

Company Stage

N/A

Total Funding

N/A

Headquarters

Miami, Florida

Founded

2020

Get referred to Hut 8

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 revenue reached $74.9 million, up sharply from $41.3 million.
  • Beacon Point's second 352 MW lease on July 20, 2026 fully commercialized 1 GW.
  • Initial data hall deliveries target Q2 2027 and Q3 2027, extending revenue visibility.

What critics are saying

  • Q2 2026 net loss hit $177.1 million after digital-asset losses and financing costs.
  • Beacon Point and River Bend depend on 2027 construction, exposing Hut 8 to delays.
  • Failed Beacon Point leasing leaves Hut 8 with stranded power and $7.5 billion debt.

What makes Hut 8 unique

  • Hut 8's power-first platform monetizes land, substations, and utility capacity, not just bitcoin.
  • By August 2026, 100% of 949 MW contracted AI capacity is investment-grade backstopped.
  • River Bend and Beacon Point raised $7.5 billion in non-recourse project financing.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

Health Savings Account/Flexible Spending Account

Unlimited Paid Time Off

Flexible Work Hours

Remote Work Options

Paid Vacation

Paid Sick Leave

Paid Holidays

Sabbatical Leave

Hybrid Work Options

Stock Options

Company Equity

401(k) Retirement Plan

Wellness Program

Mental Health Support

Gym Membership

Phone/Internet Stipend

Home Office Stipend

Conference Attendance Budget

Professional Development Budget

Family Planning Benefits

Fertility Treatment Support

Adoption Assistance

Parental Leave

Relocation Assistance

Commuter Benefits

Employee Referral Bonus

Tuition Reimbursement

Professional Certification Support

Mentorship Program

Training Programs

Education allowance

Tuition Reimbursement

Meal Benefits

Pet Insurance

Legal Services

Employee Discounts

Company Social Events

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

0%

2 year growth

0%
Yahoo Finance
Aug 26th, 2026
Hut 8 CFO sells $508K in shares after 240% one-year return

Sean Joseph Glennan, Chief Financial Officer of Hut 8 Corp., sold 6,445 shares at $78.76 per share on 24 August 2026, according to an SEC filing. The sale was worth approximately $508,000. The transaction was executed automatically under a Rule 10b5-1 trading plan to cover tax liabilities from vesting restricted stock units, not a discretionary sale. Despite the sale, Glennan's direct holdings increased from 12,068 to 17,978 shares following the vesting event. The sale occurred as Hut 8's stock achieved a 240% return over the prior year. Shares closed at $79.56 on the transaction date, giving the company a market capitalisation of $9.0 billion. Hut 8 operates as an energy infrastructure platform serving energy-intensive computing operations, including cryptocurrency mining and data centres.

PR Newswire
Aug 4th, 2026
Hut 8 secures $7.5B financing, signs $26.6B in AI data center contracts across 949 MW capacity

Hut 8 reported second quarter 2026 results, highlighting the completion of its first gigawatt-scale AI data centre campus at Beacon Point with a second 352 MW lease signed after quarter-end. The company secured $7.5 billion in investment-grade project financing across two offerings during the quarter. Hut 8 now has 949 MW of contracted IT capacity representing approximately $26.6 billion in expected aggregate base-term contract value and more than $1.75 billion in expected average annual net operating income. Facilities representing 1,330 MW are under construction at River Bend and Beacon Point, with initial data hall deliveries targeted for Q2 2027 and Q3 2027 respectively. The company reported revenue of $74.9 million for the quarter and a net loss of $177.1 million, compared to net income of $137.5 million in the prior-year period.

Intellectia AI
May 22nd, 2026
| Intellectia

Why undefined stock move today? undefined...

PR Newswire
May 6th, 2026
Hut 8 secures $9.8B AI data centre lease, closes $3.25B investment-grade bond offering

Hut 8 has secured $16.8 billion in contracted lease revenue across two hyperscale AI campuses, the company announced in its first quarter 2026 results. The energy infrastructure platform signed a 15-year, 352 MW lease at its Beacon Point AI data centre with a high-investment-grade tenant, representing $9.8 billion in contract value. The company closed a $3.25 billion offering of investment-grade senior secured notes to finance its River Bend AI data centre campus, marking the first single-sponsor data centre project to access the investment-grade construction bond market. Hut 8 also refinanced its Bitcoin-backed credit facility, reducing debt costs from 9% to 7%. First quarter revenue reached $71 million, compared to $21.8 million in the prior year. The company maintains an 8,375 MW development pipeline.

PR Newswire
May 6th, 2026
Hut 8 secures $9.8B AI data centre lease, expanding contracted capacity to 597 MW

Hut 8 has commercialised the first phase of its Beacon Point AI data centre campus in Texas through a 15-year, $9.8 billion lease with a high-investment-grade tenant for 352 MW of IT capacity. The triple-net lease could reach $25.1 billion if all renewal options are exercised. The transaction brings Hut 8's total contracted AI data centre capacity to 597 MW with aggregate base-term contract value of approximately $16.8 billion. The facility will deliver a 352 MW AI factory designed to NVIDIA's DSX reference architecture, with initial data hall delivery expected in Q3 2027. Beacon Point has secured 1,000 MW of utility capacity, with initial energisation expected in Q1 2027. Hut 8 is developing the campus with partners including American Electric Power, Vertiv Holdings, and Jacobs.