Full-Time

Lead Engineer DCS/PLC/SCADA Renewables

Multiple Teams

Posted on 7/11/2025

Emerson Electric

Emerson Electric

10,001+ employees

Global industrial automation software and devices.

No salary listed

Noida, Uttar Pradesh, India

In Person

Category
Electrical Engineering (1)
Required Skills
JavaScript
SQL
MATLAB
Requirements
  • Degree in Engineering (Electrical, Electronics, C&I, Power Engineering)
  • Three (3) to Ten (10) years of experience in DCS/PLC programming / Engineering / commissioning
  • Ability to fix DCS/PLC control system
  • Excellent language and communication skills; both verbal and written
  • Ability to write reports & business communication
  • Ability to optimally present information and respond to queries from groups of managers, clients, and customers
  • Ability to collaborate with vendors & sub-contractors
  • Should have good understanding of safety tools and gears, and safety guidelines of working at site
Responsibilities
  • Collection and review of project inputs from the Front Office or from the customer site through e-mail, kick off meeting, site survey.
  • Lead Ovation controls (OVB + OG) and Ovation Green SCADA based Solar/BESS/Hybrid greenfield and retrofit projects, software, hardware engineering and network configuration
  • Working and Guiding team to work on functional diagrams or functional descriptions and doing Tie back simulation testing; modifications of control Logics/SCADA. Configuration on 3rd party protocols, ELC and SLC communication.
  • Preparation and guiding the team on IO list, Datasets and Database.
  • Distributing the engineering work to system integrators, Participation in kick-off meetings (KOM), internal and external meetings of projects; Engagement in customer demos, FATs, integrated FAT’s SATs, and commissioning activities
  • Process testing of Solar/BESS/Hybrid plants, Working knowledge of industrial standards like IEEE, IEC, NEC, and Grid codes
  • Working closely with Ovation Green product team in Denmark/Ukraine and work on Matlab for WTG, PPC (Power Plant Controller), SQL, basic Java script for SCADA.
  • Ovation system setup, redundancy and I/O testing; Analogue and digital device testing and fault finding etc. at site during commissioning.
  • Fault diagnosis of Ovation system, network system, and various communication interfaces like OPC, Modbus, DNP3, serial, IEC 61850, etc during remote/site commissioning.
  • Solar/BESS/Hybrid plant commissioning for commercial operation; ready for 30% Travel to project sites for site assignments, testing and tuning of various electrical control functions, for third-party communication.
Desired Qualifications
  • Proficient in Solar and BESS power plant operations
  • Knowledge of electrical equipment like switchboards, generators, turbines, AVRs, motors, transformers, capacitors, CTs, VTs, feeders, meters, relays.

Emerson provides automation technology for critical industries. It supplies software and intelligent devices that monitor, control, and optimize industrial processes in settings like power plants, chemical facilities, and factories. Its products include sensors, controllers, measurement instruments, and software that work together to automate operations, improve safety, and increase efficiency. Unlike many peers, Emerson has narrowed its focus from a broad conglomerate to a dedicated industrial automation company, combining hardware, software, and services and expanding through targeted acquisitions (such as National Instruments) to deliver end-to-end automation solutions. Its goal is to help modern industries run more reliably and efficiently by providing integrated systems that manage complex processes.

Company Size

10,001+

Company Stage

IPO

Headquarters

St. Louis, Missouri

Founded

1890

Simplify Jobs

Simplify's Take

What believers are saying

  • Software and Systems orders surged 23% in Q1 FY2026, driving high-margin backlog growth.
  • $7.9B backlog with 1.13 book-to-bill ensures 6.2% annual revenue growth through 2028.
  • Free cash flow hit $1.30B in Q1 2026, funding $10B shareholder returns by 2028.

What critics are saying

  • Rockwell Automation captures 15-20% of Emerson's automation share via FactoryTalk in 12-24 months.
  • Schneider Electric undercuts Emerson's 8.9% valve share, causing revenue misses like Q1 2026's $30M.
  • Weak Europe and China demand compresses margins below 17% pretax within 6-12 months.

What makes Emerson Electric unique

  • AspenTech AVA AI platform embeds agentic AI into industrial workflows using first-principles models.
  • $8.2B National Instruments acquisition bolsters test and measurement for semiconductors and aerospace.
  • Seven segments deliver specialized valves, actuators, and software across process and discrete automation.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Remote Work Options

Flexible Work Hours

Paid Vacation

Parental Leave

Company News

Yahoo Finance
Mar 17th, 2026
Emerson Electric lifts 2026 EPS guidance, announces $250M buyback in $10B shareholder return plan

Emerson Electric reported first-quarter results that exceeded earnings expectations, raised its full-year 2026 earnings per share guidance and announced a $250 million share buyback as part of a broader plan to return $10 billion to shareholders by 2028. Despite the positive results, shares fell 5.7%. Management highlighted priorities including electrification, energy security, nearshoring and AI-enhanced software, aiming to align its automation portfolio with long-term infrastructure trends. The company's narrative projects $21.3 billion in revenue and $3.3 billion in earnings by 2028, requiring 6.2% annual revenue growth. However, risks remain around uneven demand in Europe and China, which could offset gains from emerging growth areas. Analysts' fair value estimate of $164.51 suggests a 24% upside from current levels.

Yahoo Finance
Mar 2nd, 2026
Emerson Electric shares rise 25.6% over 52 weeks but trail Industrial sector ETF's 31.7% gain

Emerson Electric, a Saint Louis-based technology and software company valued at $84.7 billion, has seen its shares rise 25.6% over the past 52 weeks, underperforming the State Street Industrial Select Sector SPDR ETF's 31.7% gain during the same period. The stock trades 8.7% below its 52-week high of $165.15, reached on 11 February. Over the past three months, shares surged 14.7%, slightly trailing the industrial sector ETF's 15.9% gain. Emerson's Q4 2025 results beat expectations, with adjusted earnings per share of $1.46 and revenue of $4.4 billion matching estimates. The company projects full-year earnings between $6.40 and $6.55 per share. Analysts maintain a "moderate buy" consensus rating with a mean price target of $168.25, suggesting 11.6% upside potential.

Yahoo Finance
Feb 23rd, 2026
Emerson Electric secures $2B credit facility amid earnings pressure and weaker guidance

Emerson Electric has entered into a new $2 billion 364-day credit facility with a syndicate of major banks, replacing its previous $3 billion arrangement. The facility, which currently has no borrowings, maintains unused liquidity support for commercial paper and general corporate purposes. The move comes as Emerson faces near-term challenges, including weaker EBITDA performance and softer guidance that pressured its share price in February. Revenue met expectations, but earnings guidance fell short amid margin pressure in key automation segments and uneven end markets in bulk chemicals, Europe and China. The company is positioning itself as a software and automation leader focused on digital and AI-driven solutions. Analysts' revenue projections for 2028 range from $21.3 billion to $21.7 billion, reflecting differing views on long-term growth prospects.

TradingView
Feb 13th, 2026
Emerson Electric secures $2B credit facility with JPMorgan Chase, replacing $3B expiring agreement

Emerson Electric has entered into a $2 billion unsecured 364-day credit facility led by JPMorgan Chase, with Bank of America, Citibank and Goldman Sachs participating. The facility supports general corporate purposes, including serving as a liquidity backstop for the company's commercial paper programme, and runs through 9 February 2027. The new agreement replaces Emerson's prior $3 billion 364-day facility dated 11 February 2025, which expired by its terms on 10 February 2026 with no exit fees. There are currently no borrowings outstanding under the new facility, which maintains the company's liquidity and financial flexibility.

Yahoo Finance
Feb 4th, 2026
Emerson Electric Q1 EPS up 6% to $1.46, orders surge 9% on power and semiconductor demand

Emerson Electric reported first-quarter fiscal 2026 results with underlying orders up 9% year-over-year, marking the fourth consecutive quarter of strong order growth. Underlying sales increased 2%, whilst adjusted earnings per share rose 6% to $1.46. CEO Lal Karsanbhai said growth was driven by demand in power, LNG, semiconductors, life sciences, and aerospace and defence. The company's backlog reached $7.9 billion, up 9% year-over-year, with a book-to-bill ratio of 1.13. Software and Systems orders jumped 23%, whilst Test and Measurement orders climbed 20%. Free cash flow reached $602 million with a 14% margin. Management said a software contract renewal timing issue reduced first-quarter sales growth by approximately one percentage point. The company expects full-year free cash flow growth of about 10%.

INACTIVE