Full-Time

Microgrid Validation Engineer

Intersect

Intersect

201-500 employees

Develops and operates solar energy projects

Compensation Overview

$118.8k - $137.5k/yr

+ Bonus + Equity Grant

Toronto, ON, Canada + 5 more

More locations: San Francisco, CA, USA | Austin, TX, USA | Calgary, AB, Canada | New York, NY, USA | Denver, CO, USA

Hybrid

Within 60 miles of hub locations; occasional in-person visits required.

Bachelor's, Master's

Category
QA & Testing (2)
,
Required Skills
Rust
Software Testing
Simulink
Lua
C/C++

Get referred to Intersect

See people who can refer or advise you

Requirements
  • B.S. or M.S. in Electrical Engineering, Software Engineering, Computer Engineering, or a related field.
  • 2–5+ years of experience in real-time system HIL validation, SIL testing, power system model verification, or related validation disciplines.
  • Experience designing automated test pipelines, verification methodologies, and performance metrics for real-time or embedded systems.
  • Hands-on experience with real-time simulators and validation platforms, including SIL, HIL, or comparable testing environments.
  • Familiarity with simulation and modeling tools such as Simulink, Modelica, or similar platforms.
  • Experience supporting commissioning, troubleshooting, or operational validation of laboratory or utility-scale power systems.
  • Familiarity with industrial control and embedded programming languages such as C++, IEC 61131-3 Structured Text, SEL RTAC logic, CODESYS, Lua, Rust, or C.
  • Experience using modern software development practices, including version control, automated testing, and validation workflows.
  • Understanding of utility interconnection requirements, grid operations, and energy market participation; ERCOT experience is preferred.
  • Ability to collaborate effectively across multidisciplinary engineering teams and external stakeholders.
  • Strong attention to detail and a commitment to safety, quality, and system reliability.
  • A proactive, curious, and solutions-oriented approach that supports continuous learning and improvement.
Responsibilities
  • Build Validation Frameworks and Test Automation: Develop software validation tools and simulation frameworks that exercise control algorithms across a full range of operating conditions, including failure modes, communication delays, and equipment faults.
  • Build Validation Frameworks and Test Automation: Design and maintain automated test execution workflows that improve validation efficiency, repeatability, and reporting.
  • Build Validation Frameworks and Test Automation: Create scalable validation processes that support the continued growth and deployment of microgrid systems.
  • Define Test Cases and Performance Criteria: Partner with controls engineers, power systems engineers, utilities, and external stakeholders to define validation scenarios, test cases, and performance requirements.
  • Define Test Cases and Performance Criteria: Verify controller behavior under both normal operating conditions and abnormal system events.
  • Define Test Cases and Performance Criteria: Establish objective performance metrics and acceptance criteria to evaluate system readiness.
  • Integrate Field Learnings into Validation: Analyze field operating data to improve simulation fidelity and identify previously untested edge cases.
  • Integrate Field Learnings into Validation: Incorporate operational insights into regression test suites to continuously strengthen validation coverage.
  • Integrate Field Learnings into Validation: Support root-cause investigations and validation efforts for system performance issues.
  • Maintain Validation Assets and Traceability: Expand and maintain laboratory validation capabilities, including HIL environments and supporting test infrastructure.
  • Maintain Validation Assets and Traceability: Troubleshoot issues related to test equipment, simulation platforms, and validation workflows.
  • Maintain Validation Assets and Traceability: Maintain organized repositories of validation assets, test artifacts, requirements traceability, and technical documentation.

Intersect Power develops, builds, and operates large-scale solar and other renewable energy projects. It sells the electricity generated through structured, contract-backed offtake agreements to businesses, utilities, and governments, providing stable revenue from the output. The company serves both retail and wholesale energy markets with a remote, distributed team across the U.S. and Canada, focused on reducing carbon emissions and integrating clean electricity into the broader economy. Its goal is to expand scalable clean energy infrastructure to accelerate the shift to renewable power across markets.

Company Size

201-500

Company Stage

Acquired

Total Funding

$3.8B

Headquarters

Beaverton, Oregon

Founded

2016

Get referred to Intersect

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Google's acquisition funds faster buildouts for Intersect's data-center-linked energy parks.
  • Meitner Energy Center broke ground June 2026 with over 1GW dedicated generation.
  • Haskell County's 640MW solar and 1.3GWh storage project advances to operation in 2026.

What critics are saying

  • Google already carved out grid-tied assets into IPX Power in March 2026.
  • Meitner and Roman face Texas permitting, water, and tax-abatement scrutiny in 2026.
  • Intersect depends on Google; any hyperscaler strategy shift collapses the developer's core demand.

What makes Intersect unique

  • Google closed its $4.75 billion Intersect acquisition on March 10, 2026.
  • Intersect pairs 1GW-plus data centers with dedicated wind, solar, storage, and gas.
  • Sheldon Kimber still leads Intersect, preserving specialized renewables development execution.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Unlimited Paid Time Off

Parental Leave

Family Planning Benefits

Fertility Treatment Support

Wellness Program

Mental Health Support

Meal Benefits

Phone/Internet Stipend

Home Office Stipend

Pet Insurance

Remote Work Options

Flexible Work Hours

Company Equity

Growth & Insights and Company News

Headcount

6 month growth

-9%

1 year growth

-2%

2 year growth

-4%
New Project Media
Jul 20th, 2026
ORIGINATION: Google, Intersect launch co-located Meitner, TX data center.

ORIGINATION: Google, Intersect launch co-located Meitner, TX data center. *This story was originally published exclusively for NPM subscribers. New Project Media (NPM) is a leading market intelligence & data platform covering US & European power, renewables & data markets and serving the development, finance, advisory & corporate community. Click here to schedule a demo or learn more. Google and Intersect have started construction of the Meitner Energy Center, a data center and power complex in Gray and Roberts Counties, Texas, built alongside dedicated on-site energy generation, according to a press release. The project co-locates the data center with more than 1 GW of wind, solar and battery storage, with additional on-site gas used for reliability. The co-location model is designed to meet the facility's power demand with dedicated generation and reduce reliance on the regional grid. The facility will use air cooling to limit water consumption. The project follows an earlier Google-Intersect development in Haskell County that pairs a data center with 640 MW of solar and 1.3 GWh of storage.Google acquired Intersect last year in a transaction valued at USD 4.75bn. Trusted by 450+ companies including. New Project Media (NPM) is a leading data, intelligence, and events company providing business development led coverage across the US & European power and data center markets. NPM serves 450+ global development, investment, finance, advisory and corporate customers. Company. Contact info. US Address: New Project Media (NPM) 300 Witherspoon Street, Suite 201 Princeton, NJ 08542 EUR Address: New Project Media (NPM) 217 Strand London, WC2R 1AT United Kingdom IND Address: NPM Research Pvt. Ltd One International Center, 25th Floor Tower 2, Senapati Bapat Marg Prabhadevi, Mumbai, Maharashtra - 400 013 Join e-mail list. Keep up to date with free recent NPM articles, industry podcasts, event updates, and product developments Customer Support: Commercial Inquiries:

Hereford Regional Medical Center
Jul 10th, 2026
Press release: information on upcoming Roman Project meetings.

Press release: information on upcoming Roman Project meetings. July 10, 2026 (Hereford) - The Deaf Smith County Hospital District Board of Directors and leadership encourages the community to attend an upcoming public meeting on the proposed Roman Project, a collaboration of Google, Intersect, and Blattner to construct data centers in Deaf Smith County. The community-wide meeting is scheduled for July 14, 2026, at 5:00 p.m. at the Hereford Civic Center with representatives from Google, Intersect, and Blattner providing information on the proposed data center project. This meeting is the best opportunity for community members to learn more about the project, express their opinions and perspectives, and ask questions about timeline and impact. "The proposed data center project is generating a great deal of community interest and attention, and we want to make sure everyone has the opportunity to have their voice heard in the most appropriate forum," said Candice Smith, RN, MSN, CEO, Deaf Smith County Hospital District. The next meeting of the Deaf Smith County Hospital District Board of Directors will be held Thursday, July 23, 2026, at 5:30 p.m. at the hospital. The board will consider Google's tax abatement proposal as part of the Roman Project. It will not consider other aspects of the data center project, such as water use or environmental impact. As with all meetings of the Deaf Smith County Hospital District Board of Directors, this meeting is open to the public, and the agenda will be made public on the hospital website in advance. Each meeting of the board provides an opportunity for public comment, and any member of the public may attend. The hospital district adheres to all requirements of the Texas Open Meetings Act and the Texas Public Information Act. "As the region's healthcare provider and a major employer, we are engaged in learning about the data center project and exploring its potential economic impact along with everyone in our community," added Smith. "We always welcome respectful public discussion and civic engagement at all our hospital district board meetings and hope to see many of our neighbors at the community-wide open house July 14." By Stephanie Limb Published On: July 10th, 2026

Yahoo Finance
Jun 5th, 2026
Google builds Texas data center with 1GW dedicated energy hub, creates 3,500 construction jobs

Alphabet (GOOG) shares rose nearly 4% on Thursday following Google's announcement of a new Texas data centre and energy hub. The Meitner Energy Center, developed with Intersect Power in Gray and Roberts Counties, will pair a data centre with over one gigawatt of wind, solar and battery storage capacity. The 800-acre facility will support Google services including Search, Gmail, Maps and Cloud, with most electricity coming from dedicated on-site generation. Google said the project will create thousands of construction jobs and use air-cooling technology to minimise water consumption. The announcement follows recent investor activity, including ARK Investment Management purchasing 267,582 Alphabet shares worth $96 million and Alphabet pricing an $84.75 billion equity raise, featuring a $10 billion private placement from Berkshire Hathaway.

pv magazine USA
Apr 13th, 2026
People on the move: ECA Solar, Powin, form energy and more.

People on the move: ECA Solar, Powin, form energy and more. Job moves in solar, storage, cleantech, utilities and energy transition finance. Image: pv magazine / Churchill Living The Solar Energy Industries Association (SEIA) announced the addition of ECA Solar, a leading distributed generation developer, to its board of directors. The board addition comes as several states, including Virginia, Illinois, Massachusetts, New Jersey and Maryland, among others, have advanced legislation to deploy more distributed solar to keep energy prices down for Americans. "We are proud to join forces with the premier association for solar and storage in America," said CEO and Founder Todd Fryatt, ECA Solar. "Last year, cumulative installed solar capacity in the United States reached 279,000 Megawatts, and SEIA is a driving force behind all these energy infrastructure projects. The nation's energy independence and dominance is now directly tied to the United States having thriving storage and solar industries." Americans for a Clean Energy Grid (ACEG), a leading non-profit advocacy coalition focused on transmission expansion, announced that Christina Hayes will conclude her service as Executive Director effective later this month. Under her leadership, ACEG became a pivotal force in federal transmission reform and FERC-level policy; the board has launched a national search for a successor to lead the organization as it enters a critical phase of implementation for regional grid planning and the "Connect the Grid Act." Powin, a global provider in battery energy storage platform solutions, announced the appointment of James Marshall as Senior Vice President of Global Supply Chain. A veteran of the semiconductor and high-tech manufacturing industries, Marshall is tasked with optimizing Powin's international LFP cell procurement and logistics to support the rapid scaling of its Centauri and Stack hardware platforms across North America and Europe. Intersect Power, a developer and owner-operator of utility-scale clean energy projects, announced the appointment of Sarah Devine to its Board of Directors. A expert in international project finance with a background at top-tier law firms, Devine joins the board as Intersect Power accelerates its pivot toward complex hybrid assets, including co-located green hydrogen production and large-scale solar-plus-storage installations. Form Energy, a developer and manufacturer of multi-day iron-air battery systems, announced that Arumugam Manthiram has joined the company as a Technical Fellow and Advisor, effective April 9, 2026. A world-renowned battery chemist and longtime collaborator of Nobel laureate John Goodenough, Manthiram joins the team as the company ramps up production at "Form Factory 1" in West Virginia to provide technical oversight on the long-duration storage chemistry that will stabilize the grid. The #1 trusted provider of fully-furnished apartments nationwide, Churchill Living delivers tailored workforce housing solutions for renewable energy projects with an expansive inventory and award-winning customer service. Job of the week: NABCEP PV Design Specialist WSB - Littleton, MA Forge ahead with WSB. We seek a NABCEP PV Design Specialist who will be responsible for developing comprehensive electrical and mechanical designs for commercial, industrial, and utility-scale solar photovoltaic (PV) systems. This role supports the preconstruction phase by producing accurate, code-compliant designs and documentation. The specialist collaborates closely with electrical engineers and solar analysts to ensure the delivery of efficient, high performing system design, construction phase by producing accurate, code-compliant designs and documentation. Our office is located in Littleton, MA. What You Will Do: * Develop complete PV system designs, including mechanical layouts for mounting structures and detailed electrical system configurations (modules, inverters, wiring, etc.). * Conduct site assessments and evaluate shading, orientation, and racking opportunities to support system layout decisions. * Prepare construction-ready design documentation, including electrical schematics, single-line diagrams, mechanical layouts, and site plans. * Ensure all designs comply with applicable local, state, and federal codes, including the National Electrical Code (NEC). * Utilize modeling and simulation software to optimize design performance and system efficiency. * Support permitting processes by preparing and submitting required design packages and responding to jurisdictional inquiries. * Collaborate with project managers, engineers, and analysts during project development and design refinement. What You Will Bring: * A NABCEP PV Design Specialist (PVDS) Board Certification. * Or a Bachelor's degree in Electrical Engineering, Renewable Energy, Engineering Technology, or related field; or equivalent technical training and experience. * 2+ years of experience designing industrial, or utility-scale solar PV systems. * Familiarity with the pre-construction phases of PV project development, including design, assessment, and permitting. * NABCEP PV Design Specialist (PVDS) Certification required. * Proficiency with AutoCAD (or similar CAD platforms). * Proficiency with power system design and modeling software (e.g., Etap, CYMCAP, WinGIS, PSCAD, PSS/E, CDEGS). * Strong understanding of electrical engineering fundamentals and design tools. * Work is primarily performed in an office environment with standard office equipment. * Occasional travel or field visits may be required to support project needs or stakeholder collaboration. This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected]. The pv magazine editorial team includes specialists in equipment supply, manufacturing, policy, markets, balance of systems, and EPC. Your email address will not be published. Required fields are marked * By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment. Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so. You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled. Further information on data privacy can be found in our Data Protection Policy. pv magazine USA offers daily updates of the latest photovoltaics news. We also offer comprehensive global coverage of the most important solar markets worldwide. Select one or more editions for targeted, up to date information delivered straight to your inbox. * Hold Ctrl or Cmd to select multiple editions. * Read our Data Protection Policy.

Insider Monkey
Jan 8th, 2026
Alphabet (GOOGL) Strengthens Data Center and Renewable Power Push Amid Analyst Price Target Upgrade

Alphabet (GOOGL) strengthens data center and renewable power push amid analyst price target upgrade. Published on january 8, 2026 at 10:09 am by abdul rahman in news. Alphabet Inc. (NASDAQ:GOOGL) is one of the must-buy AI stocks to invest in. On December 22, 2025, Alphabet Inc. (NASDAQ:GOOGL) announced a definitive agreement to acquire Intersect Power, a clean energy developer specializing in data center and energy infrastructure solutions. The deal is valued at $4.75 billion in cash; Alphabet will also assume Intersect's existing debt. This acquisition builds on an existing partnership. In December 2024, Google, along with TPG Rise Climate, led an over $800 million funding round in Intersect. As a result, Google, whose parent company is Alphabet, secured a minority stake in Intersect. The two companies are also collaborating on developing gigawatts of co-located data center capacity with plans for up to $20 billion in renewable power investments by the end of the decade. The transaction includes Intersect's development team, platform, and multiple gigawatts of energy and data center projects. These projects are currently in development or under construction, and many are already tied to Google's needs. One notable ongoing joint project involves a co-located data center and power site under construction in Haskell County, Texas. But excluded from the deal are Intersect's existing operating assets in Texas and all operating and in-development assets in California. In a different update, Wedbush increased its price target on Alphabet shares to $350 from $320, while maintaining an Outperform rating. This adjustment came as part of a broader look at the consumer internet sector following a strong performance in 2025. According to Wedbush, consumer internet companies posted solid gains throughout 2025. The 24 companies Wedbush covers averaged 23% returns, outperforming the NASDAQ's 19% gain. Alphabet Inc. (NASDAQ:GOOGL) is the parent company of Google. The company integrates AI across its core businesses including Google Search, YouTube, and Google Cloud. Its DeepMind subsidiary has pioneered breakthroughs in generative AI and reinforcement learning, while its Gemini AI models power advanced applications in productivity, search, and enterprise solutions. While we acknowledge the potential of Alphabet Inc. (NASDAQ:GOOGL) as an investment, our conviction lies in the belief that some AI stocks hold greater promise for delivering higher returns and have limited downside risk. If you are looking for an AI stock that is more promising than GOOGL and that has 100x upside potential, check out our report about the cheapest AI stock. Disclosure: None. This article is originally published at Insider Monkey.