Full-Time

Materials & Processes Electrical Engineer

Deadline 8/6/26
The Boeing Company

The Boeing Company

10,001+ employees

Global aerospace leader: aircraft, defense, space

Compensation Overview

$85k - $115k/yr

No H1B Sponsorship

Oklahoma City, OK, USA

In Person

On-site role in Oklahoma City, Oklahoma; 1st shift; relocation offered based on eligibility.

US Citizenship Required

Category
Electrical Engineering (1)

Get referred to The Boeing Company

See people who can refer or advise you

Requirements
  • Bachelor, Master or Doctorate of Science degree from an accredited course of study, in engineering, computer science, mathematics, or physics. ABET is the preferred, although not required, accreditation standard.
  • 2+ years of work-related experience with a Bachelor’s, or work-related experience with a Masters
  • 1+ years of engineering experience in Aerospace industry
  • The ability to obtain a U.S. Security Clearance for which the U.S. Government requires U.S. Citizenship
  • The ability to obtain program access, for which the U.S. Government requires U.S. Citizenship only
  • Export Control Requirement: This position must meet U.S. export control compliance requirements. To meet U.S. export control compliance requirements, a “U.S. Person” as defined by 22 C.F.R. §120.62 is required.
Responsibilities
  • Provide input into the control of EE PM&P used in the design, fabrication and production of electrical/electronic boxes, assemblies and interconnect systems.
  • Provide support to the designers in the specification and process development of materials and processes needed to build printed wiring boards, printed wiring assemblies, and LRUs.
  • Support the development and implementation of top-level program M&P control plans/schedules and review and approve plans from subcontractors and suppliers.
  • Select EE PM&P and review part/material usage within engineering documents and drawings and evaluate against contractual requirements.
  • Support the reduction of hazardous materials while maintaining product reliability.
  • Work with manufacturing shops on processes and compliance of production to meet the program M&P requirements, answering questions and revising drawing notes as needed.
  • Reviews subcontractor documentation for M&P requirement compliance and works with suppliers as needed.
  • Develops and executes the Parts, Material and Processes management plan with general supervision as required by contract and Boeing procedures for the purpose of promoting standardization, reducing cost and to assure consistent application of technology.
  • Identifies verification methods to obtain objective evidence for customers.
  • Validates and documents that Parts, Materials and Processes meet the intended applications with guidance from subject matter experts.
Desired Qualifications
  • 1+ years of experience in Materials and Processes engineering in Aerospace industry
  • 1+ years of experience associated with the development, selection, and/or revision of parts, materials, and processes specifications used to make electronics and/or support of interconnect systems
  • 1+ years of experience working with suppliers of electronics
  • Must demonstrate a high level of proficiency in use of Microsoft Word, Microsoft Excel, and Microsoft Access.
  • Prior program work experience with aircraft

Boeing designs, builds, and sells airplanes, defense systems, and space vehicles for commercial, government, and space customers. Its products include commercial airliners like the 737, 747, 767, 777, and 787 families, as well as military aircraft (F-15, F/A-18, AH-64 Apache) and space programs (including contributions to the International Space Station and the Artemis program). Boeing’s offerings work by turning engineering designs into physical aircraft and spacecraft, supported by services such as maintenance, upgrades, and cybersecurity or autonomous systems to help customers operate more safely and efficiently. The company differentiates itself with a global manufacturing and service footprint, long-standing customer relationships, and a broad portfolio that spans civil aviation, defense, and space. Its goal is to help customers move people, goods, and ideas safely and reliably, while advancing aerospace technology and maintaining a robust international presence.

Company Size

10,001+

Company Stage

IPO

Headquarters

Arlington, Virginia

Founded

1916

Get referred to The Boeing Company

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Landing Gear Exchange program cuts airline fleet maintenance costs.
  • $3.5 billion Air Force E-7 Wedgetail contract boosts defense revenue.
  • 777X certification flight tests launched in early 2026.

What critics are saying

  • FAA caps 737 MAX at 38/month until 2027 over door plug failures.
  • Airbus A321neo erodes 20-30% Boeing commercial revenue.
  • Whistleblowers expose falsified 787 data, triggering engineer exodus.

What makes The Boeing Company unique

  • Boeing's ecoDemonstrator program tests hybrid-electric propulsion on 737 testbed.
  • 777X achieves 10% better fuel efficiency with advanced composite wings.
  • Starliner enables NASA human spaceflight redundancy beyond SpaceX.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Life Insurance

Disability Insurance

Health Savings Account/Flexible Spending Account

401(k) Retirement Plan

Growth & Insights and Company News

Headcount

6 month growth

-3%

1 year growth

-3%

2 year growth

-3%
Walden Robotics
Jul 15th, 2026
Walden Robotics | Walden Robotics Launches with $300 Million to Put General-Purpose Robots to Work Today

Seed round co-led by Toyota and Deviation Capital values the full-stack Physical AI company at $1.1 billion, with participation from NVIDIA, Boeing, AE Ventures, Samsung Ventures, and other industry leaders.

Business Wire
Apr 14th, 2026
Boeing to factory-install SES multi-orbit connectivity on 737 and 787 aircraft

SES has reached a milestone with Boeing to offer its multi-orbit antenna as a line-fit connectivity solution on Boeing commercial aircraft. Boeing will install SES' in-cabin hardware network during factory production, starting with the 737 followed by the 787. The collaboration allows airlines to receive new aircraft with onboard network and connectivity service ready immediately after delivery. Boeing will install the complete in-cabin network and coordinate external equipment installation. SES' electronically steered array antenna system operates across both low-Earth orbit and geostationary satellite constellations, enabling global coverage and low-latency performance. The company has completed 500 installations and has 1,000 commitments in the pipeline for its multi-orbit system.

Yahoo Finance
Apr 6th, 2026
Defense contractors and oil companies profit from US-Iran war as gas prices surge past $4

As the US-Israel war with Iran enters its fifth week, American defence contractors and oil companies are reaping substantial profits whilst consumers face surging petrol prices approaching $4 per gallon. Defence stocks have surged, with Lockheed Martin jumping 25% this year after winning a contract to triple missile seeker production. Oil companies including ExxonMobil, Shell and Chevron have seen share prices rise over 20% as US crude nearly doubled from $65 to over $110 per barrel following Iran's blockade of the Strait of Hormuz. US oil producers could gain an additional $63 billion in profit, according to Rystad Energy. The situation mirrors 2022's Russia-Ukraine crisis, when global oil companies made $916 billion whilst American consumers faced record $5 per gallon petrol prices and 9% inflation.

PR Newswire
Apr 2nd, 2026
Boeing core stage powers NASA's Artemis II crew around the moon

Boeing's core stage for NASA's Space Launch System successfully powered the Artemis II mission, lifting off at 6:35pm ET on 1 April 2026. The rocket carried NASA astronauts Reid Wiseman, Victor Glover, Christina Koch and Canadian Space Agency astronaut Jeremy Hansen on a 10-day lunar journey aboard the Orion spacecraft Integrity. The 212-foot core stage, manufactured at NASA's Michoud Assembly Facility in New Orleans, features liquid oxygen and hydrogen tanks and four RS-25 engines producing 2.2 million pounds of thrust. Eight and a half minutes into flight, the core stage completed its mission and separated from the upper stage. Boeing is currently preparing core stages for Artemis III to V missions at Michoud and Kennedy Space Center, using components from suppliers across 38 states.

Yahoo Finance
Mar 30th, 2026
Boeing secures Vietnam orders as shares trade 38% below analyst targets despite $89.5B backlog

Boeing has secured new aircraft orders from Sun PhuQuoc Airways and Vietnam Airlines, highlighting a growing backlog amid questions about margins and cash generation. The company's shares have declined 16.4% year-to-date and 16.3% over 30 days, though one-year total shareholder return stands at 11.7%. Trading at $190.52 against an average analyst price target of $271.21, Boeing shows an estimated intrinsic discount of 37.9%. Analysts project revenue growth of approximately 13.6% annually, with sales climbing from around $80 billion in 2024 towards $110 billion by 2027, driven by increased production rates for the 737 MAX and 787, plus 777X introduction. The key risks include persistent manufacturing issues and potential order deferrals if demand weakens, threatening Boeing's $89.5 billion revenue pipeline.