Full-Time

Senior Field Systems Implementation Manager

Posted on 12/13/2025

Deadline 12/26/25
Ferrovial

Ferrovial

10,001+ employees

Global operator of sustainable transportation infrastructure

No salary listed

Dallas, TX, USA

In Person

Roadway site visits required, including some night work.

Category
Engineering Management (2)
,
Requirements
  • Bachelor’s degree in IT, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering or a related field. A degree may be substituted by experience above the stated requirements
  • 10-15+years of relevant prior ITS, technology implementation or management experience
  • Deep understanding of toll system architecture, data flows, and performance metrics
  • Experience with vendor management, contract negotiation, and regulatory compliance
  • Strong knowledge of IT network communications and systems
  • Experience in Maintenance Management Systems
  • Proficiency in Microsoft Excel, Word and PowerPoint and other PC based programs
Responsibilities
  • Manage the Field Systems Implementation team consisting of Managers and technicians and specialists, to help them grow and achieve the companies’ strategic objectives.
  • Identify team needs for upcoming pipeline of new Field systems projects. Prepare annual budgets, manage to the approved budget, and report on variances
  • Ensure the accurate reporting for Inventory and tracking of all RMA equipment is managed and accounted for correctly
  • Lead the Field System Implementation personnel to focus on on-time and on-budget delivery, analyzing system performance, acting on results of the analysis, reporting on system effectiveness, recommending system changes, presenting findings, and documenting all changes
  • Instill asafety-minded environment for all personnel by delivering a continual focus on the importance of health and safety and by ensuring all required training is completed.
  • Prepare and present weekly and periodic reports relating to the implementation of new Field Systems
  • Perform a cost-benefit analysis of alternatives for the implementation of the Field Systems taking into account their potential future O&M costs. Lead the full lifecycle of toll gantry installations—from design review and procurement through physical deployment and commissioning
  • Develop and implement operational strategies to improve toll revenue accuracy, system uptime, and customer satisfaction
  • Oversee upgrades and transitions to new technologies, including any tolling assets such as gantry-mounted sensors, and back-office integrations
  • Lead incident response planning and execution for tolling-related disruptions, including root cause analysis and corrective actions
  • Lead and approve the procurement of outsourced services not provided by the field technicians, in accordance with Company policies.
  • Create, review and approve all procedures with any involvement from the Field Systems Implementation team.
  • Manage contractors in the design, development, and implementation of all roadside systems within the milestone dates defined in the project schedule.
  • Responsible for identifying, tracking, and escalating system/project progress, status, and risks. Presents recommended technical solutions toCompany Management.
  • Review existing technical and legal project framework and participate as an active stakeholder in the development and approval of Concepts of Operations (ConOps) for any new field systems.
  • Planning: For each approved implementation project, prepare and schedule all activities with special attention to budget and critical paths and report on progress against milestones, whether with internal or external resources.
  • Conduct procurement in alignment with LBJ/NTE/35 policies, from scope definition, RFP award, contracting (in coordination with legal team) and implementation with different contractors for the design, and deployment of Roadside Systems (both Toll Collection and Intelligent Transportation Systems) for the NTE, LBJ and NTE 35W projects on time and on budget.
  • Review, evaluate and approve all documentation (including requirements, functional designs, use cases and test plans, etc.) to ensure compliance to all requirements and identify operational shortcomings and contractual non-compliance items.
  • Review, evaluate and approve all test cases and test results to ensure compliance with all operational, technical, performance and CDA requirements;participating in Factory Testing, Integration Testing, User Acceptance Testing, Performance Testing and any other defined testing.
  • Coordinate all needed Change Requests (CRs) with contractors and follow the process from their approval to its execution/ implementation
  • Whether with internal resources or third party vendors, ensure that all implementations are conducted safely and in accordance with all applicable regulations and internal safety procedures. Monitor works and contractors as required to ensure safe operations and stop any unsafe activities.
  • Review, provide feedback and coordinate with all the roadside design and implementation teams, in order to make sure that all software and hardware affected by roadside modifications support the operations and CDA and internal procedures.
  • Coordinate resolution of impacts to existing field systems infrastructure as a result of ongoing construction.
  • Evaluate and coordinate insurance claims arising from third party damages to field system infrastructure.
  • O&M phase: Coordinate with all contractors for a proper design and execution to ensure continuous operations (against possible disruptions) for the Company.
  • Coordinate and collaborate with the companies’ COO, CIO, Traffic Management Center and the ITS Operations Maintenance Managers to integrate the back-end tolling systems with roadside components, ensuring their logical, functional and technical alignment
  • Participate in field-systems-related meetings as needed with TxDOT, contractors and other developers.
  • Performs other job-related duties as assigned
Desired Qualifications
  • Hands-on implementation of telecommunications or other technological systems highly preferred
  • Experience with project management coordination of teams or field crews in a technology environment preferred
  • Understanding of recent developments and current trends related to tolling and congestion pricing

Ferrovial provides infrastructure development, construction, and asset management across transportation and related sectors worldwide. It executes projects from design and building to long-term operation of concessions such as toll roads and airports, frequently through public-private partnerships. Revenue comes from construction contracts and the ongoing income from operating these assets. Its focus on sustainability and a diversified mix of services and geographies help it deliver long-term infrastructure that serves public needs.

Company Size

10,001+

Company Stage

IPO

Headquarters

Madrid, Spain

Founded

1952

Simplify Jobs

Simplify's Take

What believers are saying

  • $7.5B US IIJA funds EV charging through 2026 for highway assets.
  • Airports pursue net-zero by 2030-2050, driving Ferrovial upgrades.
  • Congestion pricing expands toll revenues from 407 ETR and I-77.

What critics are saying

  • US 2026 budget cuts slash 407 ETR and LBJ revenues.
  • Vinci SA undercuts Ferrovial on I-77 extensions with lower costs.
  • UK Labour 2026 rules halve Heathrow stake value post-2022 sale.

What makes Ferrovial unique

  • Ferrovial's integrated model finances, designs, builds, and operates infrastructure end-to-end.
  • Operates key North American highways like 407 ETR, I-66, and I-77.
  • Leads DJSI World in sustainable construction and engineering practices.

Help us improve and share your feedback! Did you find this helpful?

Benefits

401(k) Company Match

Professional Development Budget

Company News

BNN Bloomberg
Mar 13th, 2025
AtkinsRéalis sells stake in 407 highway, rounding off turn to pure-play engineering

AtkinsRéalis Group Inc. reported its fourth-quarter profit fell compared with a year ago as it announced the sale of its remaining stake in Highway 407 ETR toll.

Market Research Telecast
Dec 29th, 2021
Cintra (Ferrovial) closes the purchase of 24.86% of India IRB Infrastructure Developers for 369 million - Market Research Telecast

Cintra, subsidiary of highways of Ferrovial, announced on Wednesday that it has closed the purchase of a stake in a 24,86% in IRB Infrastructure Developers…

INACTIVE