Full-Time

Electrical Estimator

Blattner Company

Blattner Company

201-500 employees

Builds infrastructure and renewable energy projects

Compensation Overview

$75.6k - $109.6k/yr

+ 401(k) company match

Avon, MN, USA

In Person

Travel of up to 25% is required.

Bachelor's

Category
Operations & Logistics (1)
Required Skills
Data Analysis

Get referred to Blattner Company

See people who can refer or advise you

Requirements
  • A four-year degree in Construction, Engineering, or a related field, or combinations of related education and experience, is required.
  • At least two years of progressive related experience in the renewable construction industry, including wind, solar, or battery storage, or at least four years of practical crew-based estimating experience in other non-renewable construction industries is required.
  • A valid driver's license is required.
  • Up to 25% travel is required.
Responsibilities
  • Review specifications and drawings to determine the scope of work, estimate contents, and critical project tasks.
  • Recommend the best solution from design options based on cost, engineering, quality, or material availability.
  • Develop project plans and schedules, explain the methods used, and prepare a level-one schedule to determine sequencing, crew size, resources, and productivity.
  • Develop and issue requests for proposals to qualified vendors and subcontractors before the bid review process.
  • Evaluate vendor and subcontractor quotes using comparison metrics to identify commercially and technically responsible bidders.
  • Ensure requests for proposals establish the basis of scope and pricing from suppliers and subcontractors.
  • Calculate quantity takeoffs, material prices, labor costs, equipment costs, and specialty items.
  • Track and research historical data, including purchase orders, subcontracts, and productivity analysis reports, and compile summary reports and bridging documents for future estimates.
  • Investigate and evaluate project materials and services using qualified suppliers and subcontractors based on technical and commercial merits.
  • Compare the technical and commercial aspects of bids to achieve the best value and protect the company against potential claims.
  • Review owner requests for proposals, prepare quantity takeoffs, assist with electrical estimates, and coordinate with engineers of record, utilities, and vendors.
  • Support estimates for collection systems, substations, underground cable systems, utility interconnections, supervisory control and data acquisition systems, protection and control systems, and other electrical infrastructure.
  • Identify project risks, evaluate constructability, and develop value-engineering solutions for utility-scale renewable energy proposals.
Desired Qualifications
  • Experience supporting utility-scale renewable energy or power infrastructure projects.
  • Familiarity with collection systems, substations, utility interconnections, underground cable systems, protection and control systems, supervisory control and data acquisition systems, grounding, and power delivery infrastructure.

Blattner builds critical infrastructure with a focus on renewable energy projects, using an engineering, procurement, and construction (EPC) approach to deliver turnkey solar, wind, and storage facilities for utilities and developers. With over 115 years of construction experience, it handles large-scale installations across the United States, drawing on past work in railroads, highways, dams, and mines. Blattner is the parent of Blattner Energy and D.H. Blattner & Sons and is part of the Quanta Services family, which provides broad resources and capabilities. Its goal is to support America’s energy transition by delivering reliable, large‑scale renewable projects and other essential infrastructure.

Company Size

201-500

Company Stage

N/A

Total Funding

N/A

Headquarters

Avon, Minnesota

Founded

N/A

Get referred to Blattner Company

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Blattner delivered more than 80% of Quanta's 2025 solar capacity.
  • Built Robotics signed a September 8, 2025 three-year Blattner contract across U.S. solar projects.
  • SunZia's 2026 completion should unlock follow-on utility-scale wind and transmission awards.

What critics are saying

  • OSHA opened a June 15, 2026 Byron, New York inspection after a referral.
  • A 2025 Blattner wind-site fatality at NextEra's Oklahoma project underscores severe jobsite risk.
  • Quanta's 2021 acquisition makes Blattner dependent on parent capital allocation and strategy.

What makes Blattner Company unique

  • Blattner built over 450 utility-scale clean energy projects across wind, solar, and storage.
  • SunZia Wind uses Blattner to install 900-plus turbines across an $11 billion megaproject.
  • Blattner and Built Robotics deployed AI robots for solar pile driving, surveying, and trenching.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

401(k) Company Match

Paid Vacation

Education Assistance (Tuition Reimbursement)

Gym Membership

Company News

Blattner Company
Jul 21st, 2026
Quanta leads in solar installation capacity.

Quanta leads in solar installation capacity. Posted on July 21, 2026 | 2 min. read AVON, Minn., July 21, 2026 - Blattner's parent company, Quanta Services, Inc. (NYSE: PWR), earned the top spot on Solar Power World's 2026 Top Solar Contractors list after installing more than 6,000 MW of solar capacity in 2025. The rankings, published annually by Solar Power World, recognize the leading solar contractors across the United States. Quanta's top ranking reflects its growing impact on the U.S. energy market. In 2025, Blattner delivered more than 80% of Quanta's solar capacity, helping reinforce its position as the most experienced EPC contractor in utility-scale renewable energy construction. Blattner appeared on the Top Solar Contractor list independently as No. 1 in 2020, No. 2 in 2021 and 2022, and as part of Quanta when the company was ranked No. 1 in 2023, No. 4 in 2024 and No. 1 in 2025. Quanta's Press Release, "Quanta Services Named 2026 Top U.S. Solar Solutions Provider by Solar Power World" 2026 Solar Power World Story, "2026 Top Solar Contractors List showcases veterans of dominant energy industry" 2026 Solar Power World Top Solar Contractors List

Texas Civil Justice League
May 19th, 2026
Fort Worth Court of Appeals affirms TC summary judgment for contractor in third-party liability case.

Fort Worth Court of Appeals affirms TC summary judgment for contractor in third-party liability case. The Fort Worth Court of Appeals has affirmed a trial court order granting summary judgment to a contractor in a worksite injury case in which the plaintiff alleged that the contractor retained control of the subcontractor's work. Jeremy Haggard v. Blattner Energy, Inc. (No. 02-25-00056; February 26, 2026) arose from a 2019 worksite injury at an Iowa windfarm. Plaintiff worked as a rigger, hooking parts to the crane, signaling instructions to the crane operator, and serving as the crane crew's foreman. While standing on top of a wind tower's old nacelle without fall protection, Plaintiff was knocked off when the crane operator "let this load swing out of control." Plaintiff hit the crane's stowage container on his way to the ground, injuring his abdomen. Plaintiff sued four entities, including Blattner, alleging negligence and gross negligence. After the close of discovery, Blattner filed traditional and no-evidence MSJs asserting no duty. The trial court granted summary judgment. Plaintiff appealed. In an opinion by Justice Kerr, the court of appeals affirmed. NextEra Energy, which owned the windfarm, contracted with Blattner for "repowering" and with GE for equipment supply and restarting the turbines. Blattner's job was to provide engineering, procedure, and construction services, which involved isolating the tower from electricity, removing vintage GE components, setting them on the ground, installing and rewiring new GE components, and inspecting and certifying the completion of the work. NextEra would then inspect and issue a certificate of completion, freeing Blattner to move on to the next tower. GE's job was to disassemble and remove used parts that Blattner placed at each tower's base, of which GE reacquired ownership. Blattner and GE hired subcontractors for the work. GE hired C2 logistics, Plaintiff's employer, to disassemble the old nacelles. Blattner thus neither employed Plaintiff nor had a contract with his employer. Blattner argued that it owed Plaintiff no duty. Plaintiff countered that Blattner retained contractual control of the work, creating a duty. Blattner responded that since it didn't have a contract with Plaintiff's employer, Plaintiff couldn't show that Blattner retained such control. Plaintiff didn't dispute that Blattner had no direct relationship with C2 but instead "focus-ed] on the NextEra-Blattner repowering agreement - an agreement that [Plaintiff] did not file but said NextEra would submit for an in camera inspection based on the contract's alleged confidentiality." Plaintiff failed to produce the agreement in his summary judgment evidence, but managed to produce screenshotted excerpts of it purporting to show Blattner's "complete control" of the worksite, together with a screenshot of Blattner's safety manual (which specified fall protection measures). But because Plaintiff didn't attach the agreement and safety manual themselves to his summary-judgment evidence, the court had before only unauthenticated screenshots. Additionally, the court observed "we are being asked to construe the agreement's paragraphs in isolation, including without having the agreement's defined terms - notably "Labor," "Work," and "employees." Plaintiff thus couldn't show that GE and its subs were covered by the repowering agreement in the first place. He also failed to show that Blattner's safety manual covered anyone else besides its own employees. "Based on the record before us," the court concluded, "it is unclear whether it is even corre t to classify Blattner as theor a general contractor of the entire repowering project; the devil is in the contractual details that [Plaintiff] did not produce." What is odd about this case is that nobody seemed to know whether the trial court actually reviewed the repowering agreement, nor did they request that the trial-court clerk include the unfiled agreement in the appellate record. Faced with that uncertainty, the court "must presume that the missing repowering agreement did not raise any fact issues that would have precluded the trial court's granting Blattner's no-evidence summary-judgment motion." Plaintiff would equally have failed in defeating Blattner's traditional MSJ, since nothing he produced "demonstrate that requisite level of control over the operative details of C2's work." He attempted to argue that he raised a fact issue as actual (as opposed to contractual) control. But that would require evidence that Blattner retained "a right of supervision that the independent contractor [C2] is not entirely free to do the work in its own way." As the court stated, "[f]or a duty to arise through exercising actual control over a job worksite - what is essentially a negligent undertaking - an affirmative course of action is required." But even Plaintiff's testimony acknowledged that he didn't see any Blattner people at the worksite until after he was hurt, when they gave him first aid while awaiting the ambulance. Plaintiff also testified that two weeks prior to the accident, Blattner stopped work on his tower because he was unharnessed. The work resumed when C2 told the Blattner safety rep that a harness could't be used because there was nothing to which to attach it. None of this established actual control. It did establish that Plaintiff's employer "controlled the disassembly work at each tower" without interference from Blattner," which was "free to direct C2 on when and where it worked and to set minimal safety standards without becoming C2's insurer for its negligent acts." And, by the way, the testimony of Plaintiff's "safety expert" about OSHA multi-employer directives concerning who is a "controlling entity" have no effect on Texas common law one way or the other. The trial court thus properly granted summary judgment.

PR Newswire
Jul 25th, 2023
Quanta Services Named 2023 Top Solar Contractor By Solar Power World

Quanta Operating Companies Collaborate to Achieve Solar Industry Top Spot and Historic MilestoneHOUSTON, July 25, 2023 /PRNewswire/ -- Quanta Services, Inc. (NYSE:PWR) announced today that it has been named the top solar infrastructure solutions provider in the United States by Solar Power World. This achievement was made possible by the collaborative work of three Quanta operating companies: Blattner Company, RP Construction Services (RPCS) and The Ryan Company. The combined expertise and efforts of the three companies installed more than two gigawatts of domestic solar generating capacity in 2022 alone – a new milestone of achievement in Top Solar Contractor history.Duke Austin, Quanta Services' President and Chief Executive Officer said, "Being named Top Solar Contractor is an honor and tells part of the bigger story of how we are working to build a brighter and cleaner energy future for the country. To achieve a reduced-carbon economy, we must actively collaborate to drive the shift toward renewable and sustainable energy solutions."Quanta's renewable energy infrastructure solutions powers modern life, and with its more than 200 operating companies, Quanta is building, modernizing and maintaining energy infrastructure across North America and Australia. Powerhouse renewable energy engineering, procurement and construction (EPC) solutions provider, Blattner Company, was acquired by Quanta in 2021 and during its history has constructed more than 25 percent of the utility-scale renewable energy generating capacity in the United States

Factor This
Jul 19th, 2023
The race is on to build solar farms with robots

Meanwhile, Sarcos has signed an agreement with engineering, procurement, and construction firm Blattner Company to develop and refine its own autonomous mobile robotic system for utility-scale solar construction.

Investors Prism
Jun 12th, 2023
Shoals Technologies Signs Master Supply Agreement with Blattner

Shoals Technologies Group (Nasdaq: SHLS ) has signed a Master Supply Agreement with Blattner Company to deliver 10 GW of its award-winning Big Lead Assembly (BLA) and systems solutions over the next two years.