Full-Time

Senior Nuclear Project Manager

Engineered Solutions

Deadline 8/6/26
GE Vernova

GE Vernova

1,001-5,000 employees

Global energy provider: power, wind, electrification

Compensation Overview

$114.1k - $190.2k/yr

+ Discretionary annual bonus + Relocation assistance

Wilmington, NC, USA

In Person

Relocation assistance provided; on-site in Wilmington, NC.

Bachelor's, Associate's

Category
Business & Strategy (1)
Required Skills
Risk Management
Data Analysis

Get referred to GE Vernova

See people who can refer or advise you

Requirements
  • Bachelor’s degree from an accredited university or college and minimum five (5) years of experience in Project Management OR associate’s degree (advanced degree) in the nuclear industry will be considered, such as Senior Reactor Operator, with five (5) years of project management experience
  • Minimum three (3) years managing medium- to large-scale projects in heavily regulated industries such as oil & gas, energy, aerospace, and medical device.
  • PMP Certification (or ability to obtain within 6 months)
  • Ability and willingness to travel up to 15% domestically and internationally to GE Vernova and customer locations.
  • This role requires access to U.S. export-controlled information. If applicable, final offers will be contingent on ability to obtain authorization for access to U.S. export-controlled information from the U.S. Government.
Responsibilities
  • Perform all aspects of project management for assigned projects, including scope, schedule, budget, risk, quality, and resource management. Projects may include design engineering, licensing, equipment procurement, and development of new product offerings.
  • Provide leadership and strategic oversight for project teams, ensuring projects are delivered within schedule and cost constraints.
  • Develop and maintain detailed project plans, milestones, and timelines.
  • Identify, assess, and manage project risks and issues, implementing mitigation strategies as necessary.
  • Ensure compliance with industry regulations, safety standards, and business policies.
  • Monitor project performance, track key performance indicators (KPIs), and report progress to stakeholders.
  • Negotiate contract terms and manage change orders as needed to address project scope changes or non-standard events.
  • Mentor and guide junior project managers, sharing expertise and best practices.
  • Develop specialized knowledge in nuclear energy and stay updated on the latest technical developments in the field.
  • Use technical expertise for data analysis to support project decisions and recommendations.
Desired Qualifications
  • Demonstrated experience in the nuclear industry, with a solid understanding of nuclear project requirements
  • Extensive experience in the nuclear power industry.
  • Proven track record in managing complex projects with a focus on instrumentation and controls.
  • Strong problem-solving skills, with the ability to make sound decisions in complex situations.
  • Excellent interpersonal and communication skills, with the ability to influence and build consensus among diverse stakeholders.

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders jumped 88% to $24.2 billion, led by Power and Electrification.
  • Data center orders exceeded $5 billion in first-half 2026, more than all 2025.
  • Management raised 2026 guidance and expects at least 125 GW gas backlog by year-end.

What critics are saying

  • Wind orders fell 40% in Q2 2026, and GE Vernova expects roughly $400 million losses.
  • Massachusetts courts blocked GE Vernova from exiting Vineyard Wind over unpaid $300 million claims.
  • Tariff uncertainty and permitting delays still throttle U.S. onshore wind orders through 2026.

What makes GE Vernova unique

  • GE Vernova sells the grid and turbine hardware that runs 25%-30% of global electricity.
  • Its 116 GW gas backlog and H-Class turbines lock customers into decade-long service contracts.
  • GridOS, HVDC, and Prolec-backed electrification make it harder for utilities to multi-source suppliers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Aug 18th, 2026
SHINE joins GE Vernova ARPA-E project to modernise nuclear fuel recycling accountability with AI

SHINE is joining a GE Vernova-led project funded by the Department of Energy's Advanced Research Projects Agency-Energy to develop modernised nuclear material tracking systems for fuel recycling facilities. The project aims to use artificial intelligence to optimise spent nuclear fuel tracking and measurement. As a subcontractor, SHINE is developing improved sensor deployment and AI-powered material-tracking systems for nuclear fuel recycling facilities. The technology, called Monochromatic Assays Yielding Enhanced Reliability (MAYER), is designed to track and measure nuclear material in real time, feeding information into a virtual digital twin. The system aims to replace current methods involving redundant instrumentation, manual sampling, and periodic shutdowns for inventory checks. SHINE's participation supports its broader goal of building a commercial nuclear fuel recycling facility in a lower-security regulatory category.

Yahoo Finance
Aug 17th, 2026
GE Vernova's wind orders plunge 40% as AI-driven gas turbine boom masks segment's struggles

GE Vernova reported strong second-quarter results with revenue rising 22% year-over-year to $11.1 billion, surpassing analyst estimates by $330 million. Total orders surged 88% organically to $24.2 billion, driven by AI-related demand for gas turbines and grid equipment. However, the company's Wind segment saw organic orders plunge 40%. The decline stems from quality-control issues, including turbine failures at major projects, alongside inflation and supply chain problems that compressed margins on fixed-price contracts. The segment now represents just 5% of total orders, down from 13% in 2025. GE Vernova's Wind business posted a negative 19% adjusted EBITDA margin in the first half of 2026. Despite this, investors remain unfazed as the Power and Electrification segments deliver strong margins of 17.6% and 18.2% respectively, easily offsetting Wind's losses.

Form Energy
Aug 12th, 2026
Form Energy Secures $750M in Series G Financing to Scale Iron-Air Battery Manufacturing and Accelerate Commercial Deployments

Weirton, WV – August 12, 2026 – Form Energy, Inc., an American technology company developing and commercializing a new class of cost-effective, multi-day energy storage systems, announced today a $750 million Series G financing round led by T. Rowe Price, which also led the company’s prior Series F round. This round brings Form Energy’s total […]

Yahoo Finance
Aug 7th, 2026
GE Vernova holds $176B backlog yet stock dips 5% as wind losses and spending increases spook investors

GE Vernova, General Electric's former energy division spun off in 2024, reported a $176.3 billion backlog in Q2 2026, up 37% year-over-year. The company's growth has been driven by expanding cloud, AI, and data centre markets requiring increased power infrastructure. Total orders surged 89% in the first half of 2026, with Power and Electrification segments rising 99% and 131% respectively. GE Vernova expects full-year revenue growth of 19% to 22%. Despite strong performance, shares declined 5% over the past month whilst the S&P 500 gained 3%. The pullback followed Q2 results where adjusted EBITDA and earnings per share missed Wall Street expectations due to increased capacity spending and additional losses in the Wind division.

Yahoo Finance
Aug 6th, 2026
GE Vernova books $176B backlog with 134% gas order growth as Eaton rides 65% data center surge

GE Vernova and Eaton released second-quarter 2026 results highlighting surging demand from AI infrastructure buildout. Vernova reported $5.50 billion in Power segment revenue with gas equipment orders up 134% organically. The company booked $2.7 billion in data centre orders during the quarter alone and expects to reach at least 125 gigawatts of gas equipment under contract by year-end. Total backlog stands at $176 billion. Eaton posted revenue of $8.531 billion, up 21.39%, with adjusted earnings per share of $3.15. Data centre revenue grew roughly 65% in both its Electrical Americas and Electrical Global divisions. The Boyd Thermal liquid-cooling business, acquired for $9.55 billion in March, generated $432 million in second-quarter revenue. Vernova guided free cash flow to $11.5 billion to $12.5 billion, whilst Eaton raised its full-year earnings guidance to $13.40 to $13.60 per share.