Full-Time

Team Lead – Civil

Site Design

Posted on 8/16/2025

TKDA

TKDA

201-500 employees

Engineering, architecture, planning, and transportation design

Compensation Overview

$98.5k - $128.9k/yr

Bloomington, MN, USA

Hybrid

3 days in office / 2 days remote per week

Category
Architecture & Civil Engineering (3)
, ,
Required Skills
CAD
Requirements
  • Bachelor’s Degree from an accredited college/university in Civil Engineering.
  • Progressive experience in site design including site layouts, grading, utilities, stormwater management, and site permitting.
  • Registered as a Professional Engineer in the State of Minnesota.
  • Previous experience in coaching, mentoring, and developing less experienced professionals with an emphasis on technical design standards, quality control, and/or project management practices.
  • Minimum of three (3) years of experience managing design projects; strong working knowledge of the project development process including coordination with other disciplines during design and construction.
  • Previous experience in responding to requests for proposals, including preparing civil scope of work and estimating civil fees.
  • Previous experience and ability to prepare studies, technical specifications and construction cost estimates and work with drafters to prepare accurate design drawings.
  • Knowledge associated with working with other disciplines on larger projects: Architecture, Mechanical, Electrical, Structural, etc.
  • Strong working knowledge of MS Office Suite applications (Word, Excel, Outlook, Project, etc.).
  • Strong interpersonal skills and effective verbal and written communication skills; Ability to write specifications and reports and lead and/or participate in discussions during client consultations and project team meetings.
Responsibilities
  • Overseeing the Designers/CAD technicians and Graduate Engineering staff members (7-10 people) who will direct report to this position.
  • Assist the Group Manager in assigning projects to the defined directed reports, scheduling work assignments, and assist in maintaining utilization of those members.
  • Mentoring of direct reports.
  • Mid-year and year end reviews of direct reports along with the Group Manager.
  • Working with the direct reports to establish annual Business Performance Objectives.
  • Assist with the development of design standards, technical specifications, typical details, design calculation tools and software standards for the Civil Group.
  • Approve team time sheets.
  • Provide and lead Quality Assurance/Quality Control reviews for civil projects, including review of plan sets, technical specifications, and design calculations.
  • Serve as the lead civil on multidiscipline projects or the Project Manager of projects.
  • Assist in proposals and project development for civil projects including fee estimating, client presentations and interviews, and site inspections.
  • The preparation of civil plans and design details, specifications, and provide construction administration services.
  • Assume the duties of the Group Manager when they are unavailable including attending Division planning meetings with other managers and scheduling of civil staff.
Desired Qualifications
  • Previous experience in business development with a demonstrated record of tracking and securing new project opportunities.
  • Previous experience and working knowledge of AutoCAD and Civil 3D.
  • Registered Professional Engineer in multiple states.
  • Flexibility to travel overnight to regional offices.

TKDA is an employee-owned engineering, architecture, and planning firm serving the United States. It focuses on four markets—Aviation, Rail, Surface Transportation, and Facilities—offering planning, design, engineering, and construction administration for airports, rail systems, roads, bridges, trails, and buildings. The company differentiates itself through 100% ESOP ownership, in-house multidisciplinary teams, and a nationwide office network, enabling coordinated projects across sectors. Its goal is to deliver comprehensive infrastructure solutions and foster long-term client relationships by aligning employee and client interests through its ownership model.

Company Size

201-500

Company Stage

N/A

Total Funding

N/A

Headquarters

Doerun, Georgia

Founded

1910

Simplify Jobs

Simplify's Take

What believers are saying

  • Grew to 457 employees and $104.1M revenue through service expansion.
  • Microgrid-enabled Porterville facility advances zero-emission fleet by 2040.
  • Emerging markets like data centers and electrification drive nationwide growth.

What critics are saying

  • WSP Global undercuts pricing on US DOT projects, eroding aviation market share.
  • ESOP valuation dissatisfaction causes talent exodus to AECOM within 6-12 months.
  • BIL funding shift to high-speed rail slashes TKDA rail revenue by 30%.

What makes TKDA unique

  • TKDA specializes in aviation, rail, surface transportation, and facilities markets since 1910.
  • 100% employee-owned via ESOP since 1987 fosters client-focused culture.
  • Acquired CNA Consulting Engineers in 2025 for geotechnical expertise.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

401(k) Company Match

Employee Stock Ownership Plan

Paid Time Off

Company News

TKDA
Feb 19th, 2026
TKDA Drives Resilient Design with a Microgrid-Enabled Maintenance Facility

TKDA is proud to partner with the City of Porterville to design a forward-looking maintenance facility that supports the City's transition to a zero-emission fleet. The new 25,000-SF facility is being thoughtfully planned to meet the City's operational needs, including maintenance bays, parking, office areas, and breakrooms, while providing the flexibility to service both traditional and electric vehicles during the City's phased conversion to a zero-emission fleet by 2040. To enhance resilience and support the City's long-term sustainability goals, the facility will be connected to the City's microgrid. A microgrid is a localized energy system capable of generating, storing, and distributing electricity independently or while tied to the main utility grid. Microgrids are increasingly used to improve sustainability, manage energy costs, support electrification, and advance decarbonization initiatives. While microgrids often help manage peak loads, this facility's connection is being driven primarily by the need for operational continuity. During storms, natural disasters, grid failures, or brownouts, the microgrid will provide uninterrupted power by utilizing multiple potential energy sources, such as photovoltaics, battery storage, combined heat and power, or generator systems. This will allow essential operations at the maintenance facility to continue even when the broader grid is under stress, reflecting citywide efforts to strengthen resilience against energy disruptions. TKDA helps cities like Porterville lead the advancement of energy-resilient and sustainable infrastructure. Through innovative facility design and strategic energy integration, Tkda is committed to delivering solutions that support its clients' sustainability, electrification, and long-term operational goals.

TKDA
Feb 9th, 2026
TKDA Projects Earn Two Awards at ACEC/MN Banquet

TKDA projects earn two awards at ACEC/MN banquet. TKDA is proud to announce two aviation projects were recognized at the American Council of Engineering Companies of Minnesota's Engineering Excellence Banquet. This annual banquet recognizes engineering firms and their clients on successful projects that provide value to the community while demonstrating a high level of creativity and innovation. Both awards highlight our commitment to delivering safe and efficient infrastructure that strengthens Minnesota's aviation system. From major commercial hubs to regional airports, we provide resilient aviation planning and design solutions. Runway 12L-30R Reconstruction wins Grand Award. The Runway 12L-30R Reconstruction at the Minneapolis-St. Paul International Airport received a Grand Award. When water did not drain properly and ponded at the intersection of Runways 12L-30R and 4-22, there was a significant aircraft safety concern at the Minneapolis-St. Paul International Airport. To address the poor friction and drainage conditions, we collaborated with the Metropolitan Airports Commission on a full reconstruction of the intersection. Closing Runway 12L-30R doesn't occur often, so the design team completed several maintenance projects during the closure. Overall, the project adopted an aggressive schedule limited to 16 weeks to minimize airport impacts during certain weather conditions, requiring the contractors to work long hours and weekends. Considerable collaboration, precise design, and diligent construction management helped maintain ongoing airport operations and complete this project to foster a safer condition for passengers. Snow Removal Equipment Building wins Honor Award. We also received an Honor Award for our design of the Snow Removal Equipment Building at the Southwest Minnesota Regional Airport in Marshall, Minnesota. After completing a Master Plan for Southwest Minnesota Regional Airport, the City of Marshall identified a location for future terminal area development. The first project was a 7,500-SF snow removal equipment facility to store snow removal and lawn care equipment and raw materials, which is essential to maintaining runways and airport property. TKDA provided comprehensive planning, design, and construction phase services for the facility, featuring three vehicle/equipment bays, office and breakroom spaces, restrooms, mechanical and electrical rooms, and a storage mezzanine to maximize the use of interior space. By collaborating with City officials, the Airport Commission, and the FAA, TKDA prepared a funding plan outlining the funding source proportions and allocations. This facility marks a major investment in safety, efficiency, and growth for the region.

Twin Cities Business
Jul 21st, 2025
TKDA Acquires CNA Consulting Engineers

The move allows Bloomington-based TKDA to offer more services in-house, with hopes of expansion across the United States.

INACTIVE