Full-Time

Senior Embedded Software Engineer

Eos Energy Storage

Eos Energy Storage

201-500 employees

Manufactures aqueous zinc battery energy storage

No salary listed

Company Does Not Provide H1B Sponsorship

Edison, NJ, USA

In Person

On-site role in Edison, NJ; local travel <10%.

Category
Software Engineering (1)
Required Skills
Oscilloscope
C/C++
Requirements
  • Proficient in C/C++ for embedded systems development.
  • Ability to rapidly prototype software solutions using C/C++ and other relevant programming languages, frameworks, and libraries.
  • Knowledge of embedded systems development, including familiarity with microcontrollers, memories, A/D converters and real-time operating systems (RTOS).
  • Familiarity with communication protocols commonly used in battery systems, such as CAN bus, Modbus, SPI, and I2C.
  • Proficient in debugging tools, oscilloscopes, logic analyzers, and protocol analyzers.
  • Ability to work independently and collaboratively within a cross-functional engineering team.
  • Strong problem-solving skills and the ability to troubleshoot complex software issues in a timely manner.
  • Excellent communication skills, with the ability to clearly document and explain safety-critical design and testing concepts.
  • Bachelor's degree in electrical engineering, computer engineering, or related field required.
  • Minimum of 8 years' experience.
  • Travel: Local Travel less than 10%; Overnight/North America less than 10%.
  • Working Conditions: Office Environment - Must be able to remain in a stationary position 50% of the time and occasionally move about inside the office to access file cabinets, office machinery, etc. Required to have close visual acuity to perform activities such as preparing and analyzing data and figures; transcribing; viewing a computer terminal; extensive reading. May exert up to 25 pounds of force occasionally to lift, carry, push, pull or move objects, including the human body.
  • Factory - The worker may be subject to hazards including proximity to moving mechanical parts, vibration, moving vehicles, electrical current, exposure to temperature changes or chemicals; may be exposed to fumes, airborne particles, odors, dust, mists, and gases; noise level can be loud; required to wear safety equipment.
  • Customer/Partner Locations – Employee may visit customer or partner locations that may be comprised of office, manufacturing floor, laboratory environments and construction sites depending on the location and reason for visit.
Responsibilities
  • Lead a team of engineers to design and develop BMS Firmware: Create and maintain firmware for microcontrollers, primarily focusing on STM32 family devices, using the V-model to ensure structured development and safety compliance with IEC 60730.
  • Implement BMS Communication Protocols: Design and implement communication interfaces such as CAN/CANFD and RS-485 to support real-time data transmission and control specific to zinc-bromide battery systems.
  • Develop BMS Safety Features: Design diagnostics, self-test functions, and fail-safe mechanisms aligned with IEC 60730 Annex H. Implement functions such as overvoltage/undervoltage protection, current balancing, electrolyte monitoring, and fault detection to ensure BMS safety and reliability.
  • Analog-to-Digital Integration for Battery Monitoring: Interface and configure ADCs to accurately measure voltage, current, electrolyte levels, and temperature parameters for zinc-bromide batteries, enabling real-time monitoring and management of State of Charge (SoC) and State of Health (SoH).
  • V-Model Testing for BMS: Apply the V-model approach to verify and validate safety-critical functions at each development phase, ensuring comprehensive compliance, traceability, and reliability of zinc-bromide BMS.
  • Hardware-Software Integration: Collaborate with hardware engineers to ensure proper integration of firmware with BMS hardware components, including sensors, and power electronics, conducting safety validation and performance testing.
  • Documentation and Compliance: Develop detailed technical documentation, including design specifications, test plans, and compliance reports, in line with IEC 60730 Annex H and V-model methodologies.
  • Stay Updated: Keep abreast of the latest advancements in BMS design, microcontroller platforms, safety standards, and communication protocols relevant to energy storage systems.
  • Collaborate with and support other groups in the company in developing user-friendly tools for troubleshooting and commissioning.
  • Participate in future product roadmap development.
  • Ensure a safe work environment by following health and safety guidelines and policies.
  • Lead and conduct root cause failure investigations.
  • Develop robust and efficient software/firmware engineering processes.
  • Work with the engineering team to complete and maintain software documentation of current and new products.
  • Other duties, responsibilities and activities may change or be assigned at any time with or without notice.
Desired Qualifications
  • Familiarity with BMS algorithms for SoC and SoH estimation – knowledge of zinc-bromide batteries is a plus.
  • Knowledge of embedded security principles, including secure bootloaders and encryption for BMS communication.

Eos Energy Storage develops and manufactures aqueous zinc battery energy storage systems for commercial, industrial, utility, and renewable energy customers. The systems store electrical energy in an aqueous zinc chemistry and are designed for 3 to 12 hours of use to support grid resiliency, peak shaving, demand management, and intermittent renewable generation. The products are modular battery packs with simplified components aimed at reducing production costs and risks while delivering reliable storage for microgrids and large-scale projects. Compared with typical lithium-ion approaches, Eos focuses on a different chemistry and a streamlined design to provide cost-effective, safe energy storage for grid applications. The company’s goal is to accelerate the transition to clean energy by enabling reliable, affordable storage that boosts grid reliability and supports renewable integration.

Company Size

201-500

Company Stage

IPO

Headquarters

Edison, New Jersey

Founded

2008

Simplify Jobs

Simplify's Take

What believers are saying

  • Q1 2026 revenue grew 433% to $57M with $645M backlog supporting $300-400M full-year guidance.
  • Frontier Power USA joint venture with Cerberus adds $100M equity and 2 GWh capacity reservation.
  • Driehaus Capital increased stake to 14.27M shares, signaling institutional confidence in long-duration storage thesis.

What critics are saying

  • Securities fraud lawsuits allege production misrepresentation; 2025 revenue missed $150-160M guidance by 24%.
  • June 3 shareholder vote requires 67% approval for $150M pro rata offering; failure blocks Frontier funding.
  • Form Energy's 100-hour iron-air batteries undercut Eos's 8-hour systems in 55% of pipeline opportunity.

What makes Eos Energy Storage unique

  • Zinc-bromine chemistry achieves 6,000 cycles and 100% depth of discharge versus lithium-ion degradation.
  • U.S.-manufactured systems with 8 GWh annual capacity by 2026 serve domestic grid resilience demand.
  • DawnOS architecture enables 4-16+ hour discharge duration, targeting 55% of 107 GWh pipeline opportunity.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Eos Energy Storage who can refer or advise you

Benefits

Health Insurance

Paid Vacation

Flexible Work Hours

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

2%

2 year growth

-1%
Yahoo Finance
Apr 10th, 2026
Eos Energy stock climbs 30% as Q1 revenues forecast to expand 433%

Eos Energy Enterprises climbed 29.63% to $5.95 on Thursday after announcing first-quarter 2026 revenues of $56 million to $57 million, representing a 433% to 443% increase from $10.5 million in the same period last year. The battery energy storage company attributed the growth to record shipments and strong manufacturing performance. The company cited operational improvements in supplier quality control, lean processes and equipment optimisation as drivers of increased throughput and execution. Shipments remained aligned with customer contractual commitments. Eos Energy also completed factory acceptance testing for its second production line during the quarter, with initial production targeted for late second quarter. The new line incorporates efficiency enhancements including single-piece flow configuration and advanced gantry systems. Official results are due next month.

Yahoo Finance
Mar 13th, 2026
Battery storage firm Eos Energy draws $110M investment despite 47% stock decline

Driehaus Capital Management purchased 7.70 million shares of Eos Energy Enterprises in the fourth quarter, worth an estimated $110.72 million based on quarterly average pricing, according to a February 17, 2026 SEC filing. The investment increased Driehaus' total stake to 14.27 million shares. Eos Energy, which manufactures grid-scale battery storage systems, has seen shares rise nearly 50% over the past year to $6.12, outperforming the S&P 500's 19% gain. Revenue reached $114.2 million in 2025, more than seven times the prior year, driven by increased deliveries and manufacturing improvements. The company reported a $701.5 million backlog and $23.6 billion commercial pipeline. However, shares have tumbled 47% since last quarter following softer-than-expected revenue guidance, partially reversing recent gains.

PR Newswire
Mar 10th, 2026
Eos Energy sued for fraud after manufacturing issues cause 39% stock drop

Eos Energy Enterprises faces a securities fraud class action lawsuit after its stock fell 39% on 26 February 2026. The lawsuit, filed in the US District Court for the District of New Jersey, alleges the company misrepresented near-term revenue growth and manufacturing capabilities. Eos Energy, which manufactures zinc-based battery energy storage systems, had guided fiscal year 2025 revenue of $150 million to $160 million whilst touting manufacturing progress. However, the company reported a $970 million net loss and missed guidance due to production inefficiencies, battery line downtime and quality delays. The complaint alleges violations of the Securities Exchange Act. Investors have until 5 May 2026 to apply to lead the case. Law firm Bleichmar Fonti & Auld is representing plaintiffs on a contingency basis.

PR Newswire
Mar 9th, 2026
Law firm investigates Eos Energy after $114.2M revenue misses $150M–160M guidance

A securities class action lawsuit has been filed against Eos Energy Enterprises, Inc. (NASDAQ: EOSE) on behalf of investors who purchased securities between 5 November 2025 and 26 February 2026. Law firm Robbins LLP is investigating allegations that the battery manufacturer misled investors about its business prospects. The complaint alleges Eos Energy failed to disclose production difficulties, including battery line downtime exceeding industry norms and delays in automated bipolar production quality targets. On 26 February 2026, the company reported full-year 2025 revenue of $114.2 million, significantly below its guidance of $150 million to $160 million, alongside a net loss of $969.6 million. Following the announcement, Eos Energy's share price fell 39.4% to $6.74. Shareholders may participate in the class action through Robbins LLP.

Yahoo Finance
Mar 6th, 2026
Stifel cuts Eos Energy price target to $12 from $22, maintains buy rating after Q4 miss

Stifel has lowered its price target on Eos Energy Enterprises (NASDAQ: EOSE) to $12 from $22 whilst maintaining a Buy rating. Separately, Guggenheim downgraded the stock to Neutral from Buy, removing its $20 price target, citing management's struggles with financial forecasting despite operational progress. The adjustments followed Eos Energy's Q4 results on 26th February, which missed expectations. The company reported earnings per share of negative 84 cents versus consensus estimates of negative 24 cents, and revenue of $58 million against the $93.69 million estimate. CEO Joe Mastrangelo described 2025 as "a structural turning point", noting expanded capacity to 2 gigawatt-hours, record quarterly revenue, and over $240 million in Q4 bookings. The company ended the year with a cash position above $600 million.