Full-Time

Engineer – Production

Venture Global LNG

Venture Global LNG

501-1,000 employees

Develops and operates LNG export facilities

No salary listed

Arlington, VA, USA

In Person

Category
Operations & Logistics (1)
Required Skills
Power BI
Python
Data Science
process engineering
SQL
Data Engineering
Data Analysis
Excel/Numbers/Sheets
Requirements
  • Advanced degree (Master’s or PhD) in Chemical, Process or Mechanical Engineering discipline is highly desired; however, candidates possessing a Bachelor’s degree in Chemical, Process or Mechanical Engineering with demonstrable success improving LNG plant operations using data, analytics, or automation are encouraged to apply
  • Minimum 3 years of production or process engineering experience in LNG
  • Demonstrated success improving plant operations using data, analytics, or automation
  • Working knowledge of production systems, control room operations, and key process equipment (e.g., heat exchangers, compressors, refrigeration systems)
  • Familiarity with data and reporting tools such as Excel, Power BI, or SAC; experience with Python or SQL is a plus but not required
  • Strong communication and collaboration skills, with the ability to engage both technical and non-technical teams
  • High level of energy and motivation to excel within the organization
  • Goes above and beyond and takes initiative
Responsibilities
  • Help develop tools that track and improve LNG production performance, including dashboards, automated reports, and alerts
  • Translate operating data into actionable insights that improve plant reliability, availability, and throughput
  • Automate the Analysis of production trends, loss events, and deviation from expected performance; support investigations (e.g., RCAs) and mitigation planning
  • Identify opportunities to automate manual tracking and reporting processes, improving accuracy and timeliness of information
  • Analyze plant data and model outputs to identify optimization opportunities and troubleshoot operational issues
  • Assist in evaluating the impact of process changes, debottlenecking studies and efficiency improvements
  • Collaborate with Data Engineers, Data Scientists, and BI Developers to ensure accurate data flows and fit-for-purpose dashboards
  • Provide insights and technical input to the annual delivery plan, production forecasts, and ongoing performance reviews
  • Share learnings across teams and contribute to standardizing best practices across facilities
  • Travel to all our Louisiana LNG Facilities as needed
Desired Qualifications
  • Experience working alongside BI, data engineering, or IT teams on analytics or digitalization projects
  • Exposure to commissioning or troubleshooting of cryogenic or liquefaction systems
  • Understanding of cloud-based tools such as Azure Data Factory, Databricks, or Data Lakes
  • Comfortable managing multiple priorities and adapting to evolving operational needs

Venture Global LNG develops, owns, and operates large-scale LNG export facilities in North America to liquefy natural gas and ship it globally. It sells LNG under long-term contracts to utilities, energy companies, and industrial users, providing a stable revenue stream. LNG is produced by cooling natural gas to a liquid for easier storage and transport, with shipments routed from Calcasieu Pass, Plaquemines LNG, and Delta LNG. The company differentiates itself through scaled, low-cost production at strategically located terminals, aiming to offer reliable, cleaner energy at lower prices with a focus on efficiency and consistent supply to global customers.

Company Size

501-1,000

Company Stage

Debt Financing

Total Funding

$2.6B

Headquarters

Arlington, Virginia

Founded

2013

Simplify Jobs

Simplify's Take

What believers are saying

  • FERC approved $10B CP2 project May 23, 2025, adding 28 MTPA capacity.
  • Secured 20-year contracts: 0.7 MTPA Excelerate February 28, 1.0 MTPA China Gas February 23.
  • Closed $3B perpetual preferred stock offering for expansion funding.

What critics are saying

  • $6B arbitration claims consume two years cash flow, force asset sales.
  • CP2 faces environmental litigation delaying beyond 2027, stranding $5B capital.
  • Calcasieu Pass equipment failures cut capacity below 16.5 MTPA, sparking disputes.

What makes Venture Global LNG unique

  • Plaquemines LNG achieved historic first LNG production recently.
  • CP2 LNG integrates CCS capturing 500,000 tons CO2 annually.
  • Develops four Louisiana facilities: Calcasieu Pass, Plaquemines, Delta, CP2.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Venture Global LNG who can refer or advise you

Benefits

Health Insurance

Paid Vacation

Flexible Work Hours

Company News

PR Newswire
Dec 14th, 2024
Venture Global's Plaquemines LNG Achieves Historic First LNG Production

Venture Global is developing Carbon Capture and Sequestration (CCS) projects at each of its LNG facilities.

Insurance Journal
Nov 22nd, 2024
Arbitration Claims Against LNG Exporter Venture Global Reach Close to $6 Billion

Venture Global has considered plans to file for an initial public offering, which could raise more than $3 billion.

Offshore Technology
Nov 21st, 2024
Pending arbitration claims against Venture Global LNG grow to $6bn -report

Last week, Reuters reported that Venture Global LNG is planning to raise approximately $3bn through an initial public offering (IPO) in New York.

Rigzone
Nov 21st, 2024
Arbitration Claims Against LNG Exporter Reach Close to $6B

Venture Global has considered plans to file for an initial public offering, which could raise more than $3 billion.

Offshore Technology
Nov 14th, 2024
Venture Global LNG targets $3bn in US IPO

Venture Global LNG is planning to raise approximately $3bn through an initial public offering (IPO) in New York, a move that could materialise this year, reported Reuters, citing sources familiar with the matter.