Full-Time
Experiment and Test Engineer
Updated on 4/20/2024
Develops fusion power plants for clean energy
Compensation Overview
$115,000 - $175,000Annually
Junior, Mid
Everett, WA, USA
- B.S. or M.S in aerospace engineering, physics, or related field of study and 3+ years of experience with design, procurement, construction, and commissioning of high-power systems to drive pulsed coils (<1ms) at currents up to 5MA and voltages up to 40 kV
- Experience in design, fabrication, installation, and test of high voltage electronics
- Experience with solid state switching technologies and understanding of operating characteristics of power electronic components such as IGBTs, power MOSFETs, and SCRs
- Experience in the design, build, and test approach of seeing a project from conception to completion
- Demonstrated ability and desire to rapidly learn new systems
- Demonstrated experience taking on complex problems, defining and accomplishing challenging objectives with minimum guidance
- Experience with Microsoft Suite, LTSpice, SIMtrex/Simplis, KiCAD, Altium, Matlab
- Work collaboratively and communicate effectively as a member of a team
- Contribute to the development and commissioning of high voltage electrical power systems for driving pulsed magnetic coils
- Develop electrical system architecture and work with designers to produce electrical schematics and installation drawings for system upgrades
- Design, assembly, test and deploy high power systems
- Prepare experimental test plans and procedures, and present at test readiness reviews
- Maintain experimental facilities and related support equipment such as capacitors, high-voltage power electronics, data acquisition systems, and diagnostics
- Develop and validate technical specifications to comply with project requirements
- Use critical reasoning to identify strengths and weaknesses of different technical solutions
- Work with control systems, including LabView-based control systems and PXIe-NI chassis-based systems, and solve data collection problems in a fast-pulse EMI environment
Helion is at the forefront of developing the world's first fusion power plant, which utilizes deuterium and helium-3 to generate clean and abundant energy. This company excels in innovation with breakthroughs in plasma temperatures and sustainable energy technologies. Working at Helion offers a unique opportunity to contribute to cutting-edge, significant advancements in the energy sector, within a culture that values leadership and technical achievement in clean energy production.
Company Stage
Series E
Total Funding
$2.3B
Headquarters
Everett, Washington
Founded
2013
6 month growth
↑ 21%1 year growth
↑ 48%2 year growth
↑ 296%Benefits
Medical, dental, & vision insurance
401k
Parental leave
Life & disability insurance
PTO
Equity
Social events