Full-Time

Electrical Interconnection Engineer

Orenda

Orenda

1-10 employees

Develops and deploys battery storage systems.

Compensation Overview

$100k - $200k/yr

+ Bonus

Brooklyn, NY, USA

In Person

In-office at Brooklyn, New York headquarters five days/week; travel to project sites within the NYC area.

Bachelor's

Category
Electrical Engineering
Required Skills
AutoCAD

Get referred to Orenda

See people who can refer or advise you

Requirements
  • ABET Accredited Bachelor’s degree in Electrical Engineering.
  • 4–8 years in Utility Distribution Planning or Interconnection.
  • Deep knowledge of IEEE 1547, SIR processes, and hosting capacity constraints.
  • Familiarity with high-tension distribution systems.
  • Experience working with utilities.
  • Strong foundation in power engineering principles.
  • Proficiency in AutoCAD, or the willingness to learn.
  • Competence with GIS platforms and tools.
  • A "technical detective" who enjoys finding leverage in complex engineering reports.
  • Exceptional organizational skills with the ability to juggle multiple projects simultaneously.
  • Strong interpersonal skills to foster collaboration, drive negotiations, and maintain relationships with diverse stakeholders.
  • High degree of autonomy, with the ability to make informed decisions and adapt to evolving project demands.
Responsibilities
  • Drafting & Design: Utilize AutoCAD to create and modify site layouts, single line diagrams, and electrical plans.
  • Engineering Calculations: Perform conduit fill calculations and determine medium-voltage conductor ampacity ratings.
  • Iterate on key component selection with low voltage (up to 690V) and medium voltage (up to 38kV) equipment and applications, ensuring compliance with industry standards and utility requirements.
  • Technical Integration: Translate complex configurations (PCS, BESS, Switchgear, and EVSE) into clear spatial and electrical drawings.
  • Quality Control: Ensure all drawings align perfectly with application data, including correct ratings, labels, and topology.
  • Revision Management: Rapidly pivot drawings based on utility feedback or evolving project constraints to keep timelines on track.
  • Interconnection Queue Analysis and Management: Analyze the interconnection queue and conduct competitive analysis.
  • Perform preliminary hosting capacity analysis to define number of projects at a site, as well as initial viability probability.
  • Develop, implement, and interpret regression models to analyze trends and predict outcomes related to electrical interconnections.
  • Project Development and Management: Manage the lifecycle of hundreds of concurrent projects, ensuring all milestones are met on time.
  • Develop a holistic understanding of DER projects, from site evaluation and land prospecting to SCADA integration and operational readiness.
  • System optimization through the identification of cost-saving opportunities through de-duplication of scope and shared infrastructure strategies.
  • Collaborate with utilities and regulatory bodies, with specific attention to Con Edison’s interconnection standards and high-tension distribution systems.
  • Utility Stakeholder Management: Maintain ongoing working relationship with utility stakeholders; drive rapid response times to comments, escalating and resolving open items to minimize cycle time.
  • Translate utility feedback and study results into clear internal decisions, risks, and next steps.
  • Lead technical RFIs and meetings with utility engineers to throughly understand and challange assumptions to optimize interconnection upgrade cost estimates.
Desired Qualifications
  • Experience with DER technologies.
  • Familiarity with the Con Edison distribution system.
  • Experience performing SCCAF studies in ETAP.
  • EIT or PE License.
  • Advanced technical degree.
  • Focuses on key priorities and structures work effectively to manage hundreds of concurrent projects.
  • Speaks and writes clearly; can present technical concepts to non-technical stakeholders articulately.
  • Ability to develop and interpret complex regression models for trend analysis.
  • Deep understanding of generation, transmission, and distribution systems.

Orenda Power designs and delivers battery storage systems for residential and commercial use to store energy from renewables and other sources. The systems use smart software to manage charging and discharging, helping stabilize grids and ensure reliable power. It differentiates itself with a global deployment model paired with local development across 11 locations, supported by a team of 50 engineers and a track record of 35 million deployments and 100,000 customers, along with advisory services and partnerships. Its goal is to provide dependable clean energy at scale by delivering proven storage technology and comprehensive support to help customers integrate storage into their energy systems.

Company Size

1-10

Company Stage

N/A

Total Funding

$1.5M

Headquarters

New York City, New York

Founded

N/A

Get referred to Orenda

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ultra Capital's July 2026 investment finances faster NYC deployment and team expansion.
  • NYC reliability deficits through 2036 create urgent demand for distributed storage solutions.
  • Orenda's 2026 pipeline of 920 MW and 2.7 GWh signals large near-term project volume.

What critics are saying

  • Con Edison's August 2025 two-part test inflated upgrade costs from millions to tens of millions.
  • Orenda's 250 MW pre-August queue faces stranded economics unless PSC reverses Con Edison soon.
  • Execution depends on New York City approvals; a prolonged queue freeze kills the 920 MW pipeline.

What makes Orenda unique

  • Orenda leads Con Edison SIR queue with 176 active applications and 33% capacity.
  • Its 2026 Ultra Capital round added board support for dense-urban battery execution.
  • North Sky backed over 40 sites and 200 MW, validating downstate New York focus.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Phone/Internet Stipend

Wellness Program

Professional Development Budget

Unlimited Paid Time Off

Company News

Orenda
Jul 15th, 2026
Orenda closes growth equity investment from Ultra Capital.

Orenda closes growth equity investment from Ultra Capital. Investment to expand distributed battery storage in New York. New York, NY, July 15, 2026 - Orenda, a New York-based renewable energy developer, today announced the closing of a growth equity investment from Ultra Capital, an investment firm focused on sustainable infrastructure and energy transition. The investment will support Orenda's strategy to scale the deployment of distributed battery storage across New York City and the downstate region. New York City's grid is strained. High demand, limited transmission, and constrained generation have raised power prices, blocked new load, and left little reserve margin during peak demand or outages. Orenda's distributed battery storage addresses this directly, adding reliability and flexibility to the grid while lowering costs across the system. With strong state and city policy behind clean energy and grid resilience, New York City is one of the most attractive battery storage markets in the country right now. "Grid infrastructure is aging, energy costs are rising, and battery manufacturing is ramping up fast across the country. Those forces are converging right now," said Bill Grinstead, Chief Executive Officer of Orenda. "Ultra Capital brings deep experience in energy infrastructure and a track record of scaling operating platforms. This investment lets us expand the capabilities of our team and move faster to bring battery storage online across New York City." In conjunction with its investment, Mike Reynolds, Partner at Ultra Capital, has joined Orenda's Board of Directors. "Orenda has assembled a highly experienced team with a strong track record in project development, execution, and navigating complex urban power markets," said Reynolds. "The company's growing pipeline and disciplined approach position it to establish market-leading intellectual property in distributed battery storage. We believe Orenda is uniquely positioned to build and scale a best-in-class platform for deploying batteries at the distribution level in urban environments, and we are excited to support the team's next phase of growth." About Orenda Orenda develops, builds, owns, and operates battery energy storage projects in dense urban environments, with a development pipeline of 920 MW and 2.7 GWh across Downstate New York. Founded in 2020, the company pairs this infrastructure with proprietary asset management technology to close the gap between renewable generation and electricity demand. Orenda's mission is to make the grid more resilient and sustainable in Downstate New York. About Ultra Capital Ultra Capital provides equity capital to best-in-class management teams focused on the energy transition. Orenda invest growth equity and asset capital in companies with a successful track record of deploying demonstrated solutions in various sectors including solar, battery storage, distributed generation, EV charging, and fleet electrification. Orenda bring value to its partnerships through its experience as former developers, constructors, operators, and financiers of infrastructure assets.