Summer 2026

Mechanical and Manufacturing Engineering Intern

Posted on 11/7/2025

Kairos Power

Kairos Power

501-1,000 employees

Designs, licenses, and demonstrates advanced reactors

Compensation Overview

$27 - $34/hr

Albuquerque, NM, USA + 1 more

More locations: Alameda, CA, USA

In Person

Category
Mechanical Engineering (1)
Required Skills
AutoCAD
MATLAB
Word/Pages/Docs
Data Analysis
SolidWorks
Excel/Numbers/Sheets
Requirements
  • Current student enrolled and pursuing Bachelors, Masters, or PhD degree in Mechanical Engineering, Manufacturing Engineering, Industrial Engineering, Reliability Engineering, Systems Engineering, Nuclear Engineering or related field
  • Familiarity with prototyping, fabrication, or testing equipment
  • Exposure to engineering standards, drawings, and Geometric Dimensioning and Tolerancing
  • Basic proficiency in computer-aided design software (e.g., SolidWorks, AutoCAD) and simulation tools (e.g., ANSYS, MATLAB)
  • Familiarity with manufacturing processes, quality control, and engineering testing methodologies
  • Demonstrated problem-solving skills with the ability to apply critical thinking to engineering challenges
  • Proficiency in Microsoft Office applications (Outlook, Excel, Word)
  • Self-starter, critical thinking and problem-solving skills
  • Proven team player with excellent verbal, written communication/presentation, and interpersonal skills
  • Ability to work with highly collaborative team
  • Ability to solve problems quickly and efficiently
  • Prioritizes and ensures safety of oneself and others
  • Ability to proactively collect, manage and transfer knowledge
  • Ability to seek different and novel ways to create efficiencies when working on problems, challenges and issues
Responsibilities
  • Assist in the design, analysis, testing, and optimization of mechanical systems, components, and processes
  • Collaborate with cross-functional teams, including engineers, technicians, and project managers, to support project goals and timelines
  • Conduct experiments, collect data, and perform analysis to validate designs and inform decision-making
  • Develop and document standard operating procedures (SOPs), technical reports, and engineering drawings
  • Contribute to the development and improvement of manufacturing processes and equipment
  • Participate in troubleshooting and problem-solving activities to resolve engineering challenges
  • Assist in the fabrication, assembly, and testing of prototypes to support design validation
  • Participate in engineering and design reviews, contributing ideas and feedback to improve product design and reliability
  • Assist with inspections, quality checks, and documentation to ensure compliance with engineering standards and requirements
  • Support reliability engineering efforts by analyzing failure modes and proposing solutions to improve system performance
  • Engage in continuous learning to stay updated on industry trends, technologies, and best practices
  • Ensure compliance with safety regulations and company policies in all engineering activities
  • Present findings, progress, and recommendations to the engineering team and management
  • Other duties as assigned
Desired Qualifications
  • Demonstrated application of technical skills outside of classroom setting through laboratory, research, extracurricular projects, personal projects, or prior internship/work experience is highly preferred

Kairos Power designs, licenses, and demonstrates advanced nuclear reactors, headed by the KP-FHR which uses fluoride salt coolant and high operating temperatures to generate electricity. The system focuses on low water use and near-zero carbon emissions, pursuing an integrated path from design to regulatory licensing and demonstration to prove safety and economics. The company distinguishes itself by aiming to beat natural gas on cost and by a clear licensing/demo program coupled with environmental and grid-resilience performance. Its goal is to scale safe, affordable nuclear technology through government support, investments, licensing deals, and long-term service agreements to help decarbonize electricity.

Company Size

501-1,000

Company Stage

Grant

Total Funding

$20K

Headquarters

Alameda, California

Founded

2016

Simplify Jobs

Simplify's Take

What believers are saying

  • Google-TVA deal secures 50 MWe offtake for Hermes 2 by 2030.
  • DOE Nuclear Dominance program accelerates TRISO fuel supply by 2033.
  • BWXT partnership scales commercial TRISO production for deployments.

What critics are saying

  • Hermes 1 completion slips to 2029, delaying Hermes 2 operations.
  • TerraPower's 42-month Wyoming reactor steals Google data center contracts.
  • NRG PALLAS tests expose TRISO cracking, forcing NRC redesigns.

What makes Kairos Power unique

  • KP-FHR uses TRISO pebble fuel and Flibe salt coolant from Oak Ridge origins.
  • First NRC-permitted power-producing Gen IV reactor with Hermes 2.
  • Factory-built modules from Albuquerque campus enable modular SMR assembly.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Paid Vacation

401(k) Company Match

401(k) Retirement Plan

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

2%

2 year growth

1%
NucNet
Sep 3rd, 2025
Kairos And BWXT To Collaborate On Commercial Production Of Triso Nuclear Fuel

Kairos is developing Generation IV fluoride salt-cooled high-temperature reactor (KP-FHR) technology.

Chattanooga Times Free Press
Aug 18th, 2025
TVA, Google team up on advanced nuclear reactor project

Kairos Power will sell electricity to the Tennessee Valley Authority through an agreement announced Monday, and TVA will pass clean energy credits to its customer Google, which operates two data centers in the region.

Teknovation.biz
Jun 3rd, 2025
Ornl And Elementl Power Collaborate On A Data-Driven Approach For New Nuclear

Oak Ridge National Laboratory (ORNL) and Elementl Power have teamed up to advance a data-driven siting approach for advanced nuclear projects. The work started through a U.S. Department of Energy... The post ORNL and Elementl Power collaborate on a data-driven approach for new nuclear appeared first on Teknovation.biz.

Teknovation.biz
May 8th, 2025
Kairos Power Completes First Installation Of Nuclear Safety-Related Concrete For The Hermes Low-Power Demonstration Reactor

Kairos Power announced on Thursday that the company has completed the first installation of nuclear safety-related concrete for the Hermes Low-Power Demonstration Reactor, marking the start of “nuclear construction” on... The post Kairos Power completes first installation of nuclear safety-related concrete for the Hermes Low-Power Demonstration Reactor appeared first on Teknovation.biz.

NEI Magazine
Mar 28th, 2025
NRG PALLAS to test fuel for Kairos SMR

Netherlands research institute NRG PALLAS has signed a contract with US-based Kairos Power to assess materials and fuels that will be used in the small modular reactors (SMRs) Kairos is developing to power Google data centres.

INACTIVE