Full-Time

Operations & Maintenance Manager

Posted on 8/21/2026

Orenda

Orenda

1-10 employees

Develops and deploys battery storage systems.

Compensation Overview

$150k - $170k/yr

+ Annual performance-based bonus + 3% 401(k) employer match + Monthly commuter stipend

New York, NY, USA

In Person

Based in Brooklyn with extensive, regular work at active sites across the five New York City boroughs; on-call rotation participation is required.

Bachelor's

Category
Facilities Operations (1)
Required Skills
Incident Response
Inventory Management
Quality Assurance (QA)

Get referred to Orenda

See people who can refer or advise you

Requirements
  • A bachelor's degree in electrical engineering, engineering technology, or a related field, or equivalent qualification through trade licensure as a journeyman or master electrician.
  • At least 7 years of experience in power or energy operations, including at least 3 years leading field teams or plants.
  • Hands-on operations and maintenance experience with substations or power generation plants, with substantial electrical expertise.
  • A track record of vendor and subcontractor management, including service-level agreements, holdbacks, and quality enforcement.
  • Experience managing maintenance through a computerized maintenance management system, including work orders, preventive-maintenance compliance, and failure codes.
  • OSHA 30 certification, or OSHA 10 certification with an upgrade before starting.
  • A clean safety record and valid driver's license.
  • Working knowledge of NFPA 70E and NFPA 70B.
Responsibilities
  • Act as the on-site owner's representative and quality-assurance authority for preventive and corrective maintenance performed by in-house teams, third-party contractors, and original equipment manufacturers through the computerized maintenance management system across all operating sites.
  • Serve as the primary on-site hands-on response team for critical faults and build and manage a 24/7/365 on-call rotation program.
  • Perform advanced on-site diagnostics and physical repairs in-house and manage outsourced subcontractors performing specialized work under the site operations manager's quality authority.
  • Ensure vendor quality and safety compliance by witnessing critical preventive-maintenance steps and performing random workmanship spot checks.
  • Approve third-party maintenance invoices technically after confirming the work was completed to standard, then forward them to the Commercial Asset Manager for payment.
  • Own the FDNY program, including B-28 Certificate of Fitness coverage, site emergency plans, annual inspections, and battalion relationships.
  • Manage field vendors, including the high-voltage/medium-voltage maintenance subcontractor, and witness and quality-assure their work.
  • Coordinate original equipment manufacturer warranty and long-term service agreement field execution with the Commercial Asset Manager, including defect documentation and original equipment manufacturer field visits.
  • Support commissioning and operational readiness of new sites and own the operations side of handover acceptance.
  • Hire, train, and certify technicians and build and lead the field team.
  • Own site safety, including lockout/tagout, job hazard analyses, drills, incident response, and reporting.
  • Own spares and inventory discipline and provide monthly operations input to the reporting package.
  • Own site integrity and security through routine site walk-downs, physical security checks, and general upkeep to keep every site safe, secure, and audit-ready.
  • Split vendor quality assurance across the battery original equipment manufacturer and the balance-of-plant contractor and hold each to its engineered scope of work.
  • Rely on outsourced and original equipment manufacturer crews initially while building in-house capability for recurring, cost-justified work over time.
  • Coordinate with Construction and Development at handover by walking down and approving the physical site before accepting operational responsibility.
  • Start hands-on, then hire, train, and delegate until the team performs nearly all field execution as the fleet grows.
  • Document all in-house maintenance in the computerized maintenance management system, review third-party field service reports, and own spares and inventory discipline.
  • Coordinate field-level Con Edison interactions, including switching, planned outages, and utility inspections, and act as Orenda's on-site interface for Con Edison field crews.
  • Coordinate with peer managers by receiving alarm dispatches and work orders, reporting closures, executing maintenance scopes and safety programs, escalating unresolved technical issues, and routing approved invoices, vendor-quality data, and field intelligence to the Commercial Asset Manager.
Desired Qualifications
  • Direct battery energy storage system, inverter, or energy storage operations and maintenance experience.
  • Field experience with the FDNY and Con Edison, including switching, outages, and inspections; familiarity with the New York City Department of Buildings and the city's contractor and union environment.
  • A master electrician license, Certified Maintenance and Reliability Professional certification, or original equipment manufacturer battery or inverter certifications.
  • Working knowledge of NFPA 855.
  • An FDNY B-28 or other FDNY Certificate of Fitness already in hand.
  • Experience building a team or function from scratch.

Orenda Power designs and delivers battery storage systems for residential and commercial use to store energy from renewables and other sources. The systems use smart software to manage charging and discharging, helping stabilize grids and ensure reliable power. It differentiates itself with a global deployment model paired with local development across 11 locations, supported by a team of 50 engineers and a track record of 35 million deployments and 100,000 customers, along with advisory services and partnerships. Its goal is to provide dependable clean energy at scale by delivering proven storage technology and comprehensive support to help customers integrate storage into their energy systems.

Company Size

1-10

Company Stage

N/A

Total Funding

$1.5M

Headquarters

New York City, New York

Founded

N/A

Get referred to Orenda

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ultra Capital's July 2026 investment finances faster NYC deployment and team expansion.
  • NYC reliability deficits through 2036 create urgent demand for distributed storage solutions.
  • Orenda's 2026 pipeline of 920 MW and 2.7 GWh signals large near-term project volume.

What critics are saying

  • Con Edison's August 2025 two-part test inflated upgrade costs from millions to tens of millions.
  • Orenda's 250 MW pre-August queue faces stranded economics unless PSC reverses Con Edison soon.
  • Execution depends on New York City approvals; a prolonged queue freeze kills the 920 MW pipeline.

What makes Orenda unique

  • Orenda leads Con Edison SIR queue with 176 active applications and 33% capacity.
  • Its 2026 Ultra Capital round added board support for dense-urban battery execution.
  • North Sky backed over 40 sites and 200 MW, validating downstate New York focus.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Phone/Internet Stipend

Wellness Program

Professional Development Budget

Unlimited Paid Time Off

Company News

Orenda
Jul 15th, 2026
Orenda closes growth equity investment from Ultra Capital.

Orenda closes growth equity investment from Ultra Capital. Investment to expand distributed battery storage in New York. New York, NY, July 15, 2026 - Orenda, a New York-based renewable energy developer, today announced the closing of a growth equity investment from Ultra Capital, an investment firm focused on sustainable infrastructure and energy transition. The investment will support Orenda's strategy to scale the deployment of distributed battery storage across New York City and the downstate region. New York City's grid is strained. High demand, limited transmission, and constrained generation have raised power prices, blocked new load, and left little reserve margin during peak demand or outages. Orenda's distributed battery storage addresses this directly, adding reliability and flexibility to the grid while lowering costs across the system. With strong state and city policy behind clean energy and grid resilience, New York City is one of the most attractive battery storage markets in the country right now. "Grid infrastructure is aging, energy costs are rising, and battery manufacturing is ramping up fast across the country. Those forces are converging right now," said Bill Grinstead, Chief Executive Officer of Orenda. "Ultra Capital brings deep experience in energy infrastructure and a track record of scaling operating platforms. This investment lets us expand the capabilities of our team and move faster to bring battery storage online across New York City." In conjunction with its investment, Mike Reynolds, Partner at Ultra Capital, has joined Orenda's Board of Directors. "Orenda has assembled a highly experienced team with a strong track record in project development, execution, and navigating complex urban power markets," said Reynolds. "The company's growing pipeline and disciplined approach position it to establish market-leading intellectual property in distributed battery storage. We believe Orenda is uniquely positioned to build and scale a best-in-class platform for deploying batteries at the distribution level in urban environments, and we are excited to support the team's next phase of growth." About Orenda Orenda develops, builds, owns, and operates battery energy storage projects in dense urban environments, with a development pipeline of 920 MW and 2.7 GWh across Downstate New York. Founded in 2020, the company pairs this infrastructure with proprietary asset management technology to close the gap between renewable generation and electricity demand. Orenda's mission is to make the grid more resilient and sustainable in Downstate New York. About Ultra Capital Ultra Capital provides equity capital to best-in-class management teams focused on the energy transition. Orenda invest growth equity and asset capital in companies with a successful track record of deploying demonstrated solutions in various sectors including solar, battery storage, distributed generation, EV charging, and fleet electrification. Orenda bring value to its partnerships through its experience as former developers, constructors, operators, and financiers of infrastructure assets.