Full-Time

BIM/VDC Manager

4D Scheduler

Posted on 1/29/2026

Deadline 2/2/26
Ferrovial

Ferrovial

10,001+ employees

Global operator of sustainable transportation infrastructure

No salary listed

Atlanta, GA, USA

In Person

Category
Architecture & Civil Engineering (1)
Requirements
  • Bachelor’s or master’s in Civil Engineering, Construction Management, or a related field.
  • 5+ years of BIM/VDC experience with at least 3 years in 4D modeling and digital delivery for infrastructure projects.
  • Bentley Synchro Professional Accreditation
  • Expertise in: Synchro Pro, Modeler, Control Admin and Field.
  • iTwin
  • ProjectWise
  • Primavera P6
  • Bentley OpenRoads Designer
  • Proven track record managing federated models, coordinating across disciplines, and delivering 4D and O&M-ready BIM.
  • Experience implementing asset tagging, digital twins, or workflows for infrastructure O&M.
Responsibilities
  • 4D Modeling & Construction Sequencing: Develop, manage, and update the 4D construction model using Synchro Pro (.sp/.spx) aligned with Primavera P6 schedules (.xer). Generate and submit 4D simulations (AVI) highlighting: Critical path, In-progress activities. Coordinate with schedulers to maintain alignment between 4D and cost-loaded CPM schedules. Validate construction logic, phasing, and means & methods through visual simulations and field review.
  • BIM Management & Model Coordination: Lead the coordination of design models in for civil and utility disciplines. Oversee model federation and clash detection using iTwin Model Review ensuring spatial coordination and construction feasibility. Manage Synchro Modeler workflows for work package visualization and 4D planning support. Maintain model standards, layer structure, classification codes, and metadata integrity in accordance with BIM Execution Plan. Coordinate with Survey, Utilities, and Structures for full model integration and GIS asset geolocation.
  • 3D Model QA/QC & Auditing: Conduct model audits to verify that the models meet all DOT and Ferrovial Construction requirements (Naming conventions, File structure, Level of Detail (LOD), etc…). Volume consistency with design plans. Compliance with BEP and asset register formats. Interface with design consultants and construction teams to resolve issues identified during BIM quality checks. Ensure 3D models support accurate quantity takeoffs (QTOs), cost tracking, and scope verification.
  • O&M Model Preparation & Lifecycle Handover: Develop and manage the digital twin structure for the O&M phase. Support tagging of asset elements with manufacturer data, installation dates, warranties, and maintenance requirements. Coordinate with ITS/Tolling and systems integrators to incorporate all elements like fiber optics, and electronic assets in the model. Deliver a fully federated as-built BIM model aligned with COBie or the DOT-required asset data schemas.
  • Submittal & Documentation Compliance: Submit all digital deliverables (4D models, AVI simulations, .xer schedules, and model data) through DOT’s PMCS (e-Builder), following all file naming, versioning, and folder structure conventions. Ensure document control compliance per contract requirements. Provide Synchro Open Viewer-compatible models to DOT/SRTA reviewers.
  • Reporting & Stakeholder Engagement: Produce filtered Gantt charts, S-curves, work package visualizations, and BIM dashboards for monthly progress reporting. Interface with Design Leads, Construction Managers, Survey, ITS, and Tolling groups for interdisciplinary alignment. Support lane closure visualization and planning to comply with Lane Rental Charge Reporting (Attachment 2-12). Train project team members in Synchro, iTwin, and model navigation tools.

Ferrovial provides infrastructure development, construction, and asset management across transportation and related sectors worldwide. It executes projects from design and building to long-term operation of concessions such as toll roads and airports, frequently through public-private partnerships. Revenue comes from construction contracts and the ongoing income from operating these assets. Its focus on sustainability and a diversified mix of services and geographies help it deliver long-term infrastructure that serves public needs.

Company Size

10,001+

Company Stage

IPO

Headquarters

Madrid, Spain

Founded

1952

Simplify Jobs

Simplify's Take

What believers are saying

  • $7.5B US IIJA funds EV charging through 2026 for highway assets.
  • Airports pursue net-zero by 2030-2050, driving Ferrovial upgrades.
  • Congestion pricing expands toll revenues from 407 ETR and I-77.

What critics are saying

  • US 2026 budget cuts slash 407 ETR and LBJ revenues.
  • Vinci SA undercuts Ferrovial on I-77 extensions with lower costs.
  • UK Labour 2026 rules halve Heathrow stake value post-2022 sale.

What makes Ferrovial unique

  • Ferrovial's integrated model finances, designs, builds, and operates infrastructure end-to-end.
  • Operates key North American highways like 407 ETR, I-66, and I-77.
  • Leads DJSI World in sustainable construction and engineering practices.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Ferrovial who can refer or advise you

Benefits

401(k) Company Match

Professional Development Budget

Company News

BNN Bloomberg
Mar 13th, 2025
AtkinsRéalis sells stake in 407 highway, rounding off turn to pure-play engineering

AtkinsRéalis Group Inc. reported its fourth-quarter profit fell compared with a year ago as it announced the sale of its remaining stake in Highway 407 ETR toll.

Market Research Telecast
Dec 29th, 2021
Cintra (Ferrovial) closes the purchase of 24.86% of India IRB Infrastructure Developers for 369 million - Market Research Telecast

Cintra, subsidiary of highways of Ferrovial, announced on Wednesday that it has closed the purchase of a stake in a 24,86% in IRB Infrastructure Developers…

INACTIVE