Senior Engineer
Production
Posted on 3/22/2024
Venture Global LNG

501-1,000 employees

Low-cost provider of U.S. LNG with CCS projects
Company Overview
Venture Global LNG, a leading provider of U.S. LNG, is recognized for its commitment to long-term, low-cost energy solutions and its significant contribution to the industry with its 60 MTPA production capacity in Louisiana. The company's dedication to environmental sustainability is evident in its development of Carbon Capture and Sequestration (CCS) projects at each of its facilities. With its strategic location on the Mississippi River, Venture Global Plaquemines LNG is poised to deliver clean, affordable energy globally, setting it apart in the energy sector.
Venture Capital
Energy

Company Stage

Series C

Total Funding

$10.1B

Founded

2013

Headquarters

Arlington, Virginia

Growth & Insights
Headcount

6 month growth

19%

1 year growth

67%

2 year growth

134%
Locations
Arlington, VA, USA • Lake Charles, LA, USA
Experience Level
Entry
Junior
Mid
Senior
Expert
CategoriesNew
Mechanical Engineering
Manufacturing Engineering
Requirements
  • Bachelor's degree in Process/Chemical Engineering
  • Minimum 5 years' experience working as a Production Engineer
  • Experience in pre-treatment
  • Experience supporting commissioning activities
  • Oil and Gas experience with strong preference in LNG
  • Must be open to travel to Arlington, Virginia as needed
Responsibilities
  • Set CP Facility LNG Trains Production daily targets
  • Build and maintain Real time, online, surveillance and monitoring models
  • Perform Analysis to detect deviations from Live Operating Envelope Limits
  • Identify short-, medium- and long-term Availability and Reliability improvement initiatives
  • Identify Production risks and provide mitigation plans
  • Provide input to the weekly and monthly Production reviews
  • Identify the CP Facility LNG Trains production loss events
  • Lead or be part of EIRs and MoCs required to improve performance
  • Lead or be part of the CP Facility LNG Trains Production loss RCAs
  • Gather assumptions on LNG Trains performance and provide input to the Forecast and Annual Delivery Plan process
  • Support the Long-Term Service Agreement (LTSA) process
  • Support the development of Integrated Production Excellence standards and procedures
  • Capture Lessons Learned from the CP Facility and provide input to other Venture Global LNG projects/sites as required