Full-Time

Geologist 2

Posted on 8/20/2026

AECOM

AECOM

10,001+ employees

Global infrastructure consulting and program management

Compensation Overview

$70k - $92k/yr

No H1B Sponsorship

Germantown, MD, USA

Hybrid

Primarily in-person, with hybrid work potentially available after initial training. Travel may reach approximately 50%, including occasional multi-week assignments.

US Citizenship Required

Bachelor's, Master's

Category
Architecture & Civil Engineering (1)
Required Skills
CAD
Microsoft Office
AutoCAD
Word/Pages/Docs
Electromagnetics
Data Analysis
Excel/Numbers/Sheets

Get referred to AECOM

See people who can refer or advise you

Requirements
  • A Bachelor of Arts or Bachelor of Science degree in Geology, Geophysics, Geosciences, Geological Engineering, Environmental Science, Geography/GIS, or a related field, plus two years of related experience or demonstrated equivalency of experience and/or education.
  • Ability and willingness to travel up to approximately 50% to support field investigations, including occasional multi-week assignments.
  • Ability to perform physically active field work outdoors, including prolonged standing and walking over uneven terrain, repeated bending and lifting, and lifting and carrying field equipment weighing up to approximately 50 pounds, with or without reasonable accommodation.
  • Ability and willingness to work outdoors in varying terrain and weather conditions and occasionally work extended field days or non-standard schedules based on project requirements.
  • Valid United States driver's license and ability to pass the AECOM Motor Vehicle screening.
  • Ability to pass a drug screening as a condition of employment.
  • Ability to pass a medical screening as a condition of employment.
  • United States citizenship is required.
Responsibilities
  • Support geophysical investigations from field data acquisition through processing, interpretation, mapping, and reporting.
  • Support terrestrial, marine, and borehole investigations using seismic refraction/reflection, MASW, ground penetrating radar, electromagnetics, magnetics, electrical resistivity imaging, utility mapping, borehole geophysical logging, downhole/cross-hole seismic, bathymetric surveying, side-scan sonar, sub-bottom profiling, and marine magnetics and seismic.
  • Perform technical office work including geophysical data processing and interpretation, GIS analysis and mapping, CAD development, data management, quality control, technical documentation, and report preparation.
  • Perform field investigations, including setup and operation of specialized geophysical and survey instrumentation, deployment of sensors and cables, operation of seismic sources, field data quality control, troubleshooting, and equipment mobilization.
  • Support geodetic, geological, and geotechnical services including surveying, GIS mapping, geologic mapping, vibration and settlement monitoring, soil borings, and rock coring.
  • Operate specialized geophysical, survey, and data-acquisition equipment and progressively develop the skills necessary to independently perform increasingly complex field and office assignments.
  • Conduct specific phases of projects and assigned field activities under the general supervision of a Project Manager or senior technical team member.
  • Evaluate field data in real time, identify potential problems or unexpected conditions, and work with senior staff to determine appropriate solutions.
  • Review collected data for completeness and quality and identify data that may require additional investigation or collection.
  • Maintain organized field documentation and digital data and perform appropriate quality-control checks.
  • Prepare technical documentation, figures, maps, summaries, and portions of technical reports.
  • Work collaboratively as part of multidisciplinary project teams and small field crews.
  • Travel up to approximately 50% as project needs require.
  • Take ownership of assigned tasks and progressively assume greater responsibility for field activities and technical assignments.
  • Attend an in-person Day 1 onboarding at an AECOM office location as a condition of employment.
Desired Qualifications
  • A master's degree in Geology, Geophysics, Geosciences, Geological Engineering, Environmental Science, Geography/GIS, or a related field.
  • Experience involving geology, geophysics, geotechnical investigations, environmental investigations, surveying, GIS, engineering, or other related technical work.
  • Demonstrated ability to complete assigned field and technical tasks with appropriate guidance from senior staff.
  • Strong problem-solving skills and ability to learn new equipment, software, and technical procedures.
  • Hands-on experience with surveying, construction, environmental field work, geotechnical investigations, outdoor field work, research, military service, trades, or similar experience.
  • Strong mechanical or technical aptitude and interest in understanding, operating, and troubleshooting specialized instrumentation.
  • Experience collecting, reviewing, organizing, and documenting scientific or engineering field data.
  • Ability to recognize potential field equipment, data-quality, or site-condition issues and assist in developing practical solutions.
  • Ability to balance physically active field assignments with detailed technical and analytical office work.
  • Working knowledge of Microsoft Office applications, including Excel and Word.
  • Familiarity with GIS, CAD, surveying, electronics, programming, data acquisition, or technical instrumentation.
  • Familiarity with ArcGIS Pro, Surfer, EarthImager, SeisImager, RADAN, or AutoCAD.

AECOM is a global infrastructure consulting firm that provides a wide range of services, including architecture, design, construction management, engineering, environmental services, and program management, to government agencies, private companies, and non-profits. Its work centers on managing and delivering large-scale infrastructure projects, from planning and design to construction and operation, with fees tied to the project type and scope. Unlike firms with a narrower focus, AECOM offers end-to-end support across transportation, buildings, cities, and overall infrastructure, combining technical expertise with project oversight and sustainability considerations. The company aims to improve the world by enhancing natural and social systems, promoting equity and inclusion, and driving responsible, lasting outcomes for communities.

Company Size

10,001+

Company Stage

IPO

Headquarters

Dallas, Texas

Founded

1990

Get referred to AECOM

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • August 2026 backlog rose 13% despite the project charge, proving demand remains strong.
  • Hong Kong headquarters investment supports Northern Metropolis and SKYTOPIA work across Asia.
  • South Africa's July 2026 graduate program deepens talent pipelines and lowers future hiring friction.

What critics are saying

  • August 10, 2026 revealed a $337 million project charge and 98% cash-flow collapse.
  • Multiple securities investigations since June 2026 target AECOM's disclosures and management credibility.
  • Delayed construction claims and Middle East headwinds threaten another margin reset through fiscal 2027.

What makes AECOM unique

  • AECOM spans advisory, design, engineering, construction management, and program management worldwide.
  • July 30, 2026 Hong Kong headquarters strengthens Asia delivery and client proximity.
  • Record $27.8 billion backlog and 1.6 book-to-burn show winning power.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Flexible Work Hours

Hybrid Work Options

Professional Development Budget

Growth & Insights and Company News

Headcount

6 month growth

3%

1 year growth

3%

2 year growth

3%
Yahoo Finance
Aug 17th, 2026
AECOM misses revenue and EPS estimates by over 16% on legacy project troubles

AECOM reported disappointing second quarter results, missing revenue estimates by 16.7% with $3.59 billion versus expected $4.31 billion, and posting an adjusted loss per share of $0.50 against analyst expectations of $1.46 profit. The infrastructure firm attributed the shortfall to delays and cost overruns on a legacy construction management project, affected by subcontractor productivity issues. Management lowered full-year adjusted earnings guidance to $4.05 per share at the midpoint, down 32.5%. CEO Troy Rudd said the troubled projects should complete by mid-2027, whilst CFO Gaurav Kapoor noted claims remain around $600 million. Operating margin fell to negative 2.1% from 7% year-on-year. The company reported backlog of $27.82 billion, up 13.1% year-on-year, and indicated business development efforts are yielding immediate returns with healthy win rates.

Yahoo Finance
Aug 17th, 2026
AECOM misses Q2 revenue by 16.7% with $3.59B sales, posts -$0.50 EPS loss on project delays

AECOM reported disappointing Q2 CY2026 results, missing revenue expectations with $3.59 billion in sales, a 14.2% year-on-year decline. The infrastructure consulting firm posted a non-GAAP loss of $0.50 per share, significantly below analyst estimates of $1.46 profit per share. Management attributed the shortfall to delays and cost overruns on a legacy construction management project, citing subcontractor productivity issues. CEO Troy Rudd noted that slower new project starts and Middle East headwinds also weighed on performance. The company lowered its full-year adjusted earnings guidance to $4.05 per share at midpoint, down 32.5%. However, backlog grew 13.1% year-on-year to $27.82 billion. CFO Gaurav Kapoor warned of continued cash burn through the first half of fiscal 2027 as the company works through project challenges.

Associated Press
Aug 12th, 2026
AECOM faces securities fraud investigation after $337M project loss and 98% cash flow drop

Law firm Glancy Prongay Wolke & Rotter LLP has launched a securities fraud investigation into AECOM on behalf of investors. The investigation follows a sharp decline in the company's stock price after disappointing financial results. AECOM announced its second quarter fiscal 2026 results on 11 May, revealing operating cash flow had dropped 98% year over year to $4 million. The company attributed the poor performance to longer-than-anticipated claim resolution on projects bid in 2019 and 2020. AECOM's stock fell 12% following the announcement. On 10 August, the company reported third quarter results showing revenue declined 14% year over year, including a $337 million pre-tax loss from a delayed Construction Management project. Shares dropped a further 8.39%.

Financial Modeling Prep
Aug 12th, 2026
Aecom (NYSE: ACM) stock analysis: price target vs. Legal challenges.

Aecom (NYSE: ACM) stock analysis: price target vs. Legal challenges. Aug 12, 2026 Market News FMPAecom (NYSE: ACM) stock analysis: price target vs. Legal challenges. * UBS analyst sets a positive price target for Aecom (NYSE: ACM) stock, indicating potential upside. * The company faces a securities fraud investigation following its Q2 fiscal 2026 results. * Aecom reported a substantial quarterly loss per share, significantly missing analyst estimates due to a large pre-tax charge. Aecom (NYSE: ACM) is a global infrastructure consulting firm that designs, builds, finances, and operates infrastructure assets for governments, businesses, and organizations. A UBS analyst sets a new stock price target of $85.00 for Aecom. At the time of the report, the Aecom stock was trading at $62.75, which represents a potential increase of about 35.47%. This positive outlook contrasts with recent company challenges. As highlighted by Business Wire, The Law Offices of Frank R. Cruz announces a securities fraud investigation into Aecom. The investigation follows the company's second-quarter fiscal 2026 results and concerns possible violations of federal securities laws. Shareholders who lost money are encouraged to contact the firm. Financially, the company faces headwinds. Aecom reported a quarterly loss of $0.50 per share, missing the Zacks Consensus Estimate of $1.49 per share. This results in a negative earnings surprise of -133.56%, which means the company's actual earnings were significantly lower than what financial analysts had predicted for the quarter. A key reason for the poor results is a pre-tax charge of $337 million. This charge is mainly due to delays on a large Construction Management project. The company now expects this project to be completed near the end of the second quarter of fiscal 2027, later than the original first-quarter projection. The stock's performance reflects these issues. Shares of Aecom are trading at $62.84, a decrease of 6.28% for the day. The stock also set a new 52-week low of $62.55, which is far from its yearly high of $135.52. The company currently has a market capitalization of approximately $8.08 billion. Market news and analyst rating coverage Alex Lavoie covers market-moving news and analyst activity for the FMP blog, summarizing price-target changes, upgrades and downgrades, earnings results, and company developments. The focus is on turning timely market events into concise, data-backed updates that help readers stay current on the companies they follow. Financial data for every need. Real-time quotes and 30+ years of historical data, including prices, fundamentals, and insider transactions - all accessible via API. Stock Screener 2017-2026 (C) FMP

Yahoo Finance
Aug 10th, 2026
Aecom reports $86.7M Q3 loss, misses analyst expectations with 50-cent per share deficit

Aecom Technology Corp reported a fiscal third-quarter loss of $86.7 million, or 67 cents per share, after posting a profit in the same period last year. Adjusted losses came to 50 cents per share, missing Wall Street's average estimate of $1.49 per share earnings. The Dallas-based technical and management support services provider posted revenue of $3.59 billion, with adjusted revenue of $1.61 billion. The company expects full-year earnings between $3.95 and $4.15 per share. Aecom shares have declined 23% since the start of the year. Shares traded at $73.30 on Monday, down 38% over the past 12 months.