Spring 2026, Winter 2026

GE Vernova Nuclear Field Services Internship

Spring 2026

Posted on 11/24/2025

GE Vernova

GE Vernova

1,001-5,000 employees

Portfolio of energy businesses delivering electricity

Compensation Overview

$21 - $36/hr

+ Relocation Assistance + Housing Allowance + Employee Assistance Program + Retirement Savings Plan

Wilmington, NC, USA

In Person

Category
Mechanical Engineering (2)
,
Requirements
  • Must be enrolled in a full-time undergraduate or graduate program in an engineering discipline as listed below. Following majors accepted: Mechanical Engineering, Electrical Engineering, Nuclear Engineering, Industrial Engineering, Systems Engineering
  • Must maintain a minimum 3.0 cumulative GPA (without rounding).
  • GE Vernova will only employ those who are legally authorized to work in the United States for this opening. Any offer of employment is conditioned upon the successful completion of a drug screen.
  • To be considered for this role, you must be a U.S. citizen, lawful permanent resident, or protected individual as defined by 8 USC § 1101(a)(2) and 8 USC § 1324b(a)(3).
  • Must be 18 years of age or older.
  • Must be able to be granted unescorted access at a commercial nuclear power plant.
  • Must possess a valid US driver's license.
  • Ability and willingness to travel up to 70% to domestic plant sites
  • Ability and willingness to work 12 hours/day, shifts, and 7 days/week when needed for project delivery
  • Basic mechanical aptitude is required. Must be able to read and understand equipment manuals, procedures, and work instructions.
  • Ability to lift up to 50 lbs
  • Ability to climb 10 flights of stairs twice per day
  • Ability to pass respirator fit test and physical
  • Ability to pass Fitness for Duty requirements and site security requirements to obtain unescorted access
  • Ability to work under high stress conditions
  • Ability and willingness to work in radiation-controlled areas and radioactively contaminated areas
Responsibilities
  • Work onsite with and for customers with legacy fleet reactors as part of the outage team to service reactors safely, effectively, and efficiently to get them back online
  • Work with experienced Field Service Engineers in a fast-paced, challenging environment performing maintenance and inspection activities on Boiling Water Reactors
  • Attend entry level technical training
  • Travel to domestic nuclear refueling outages and be assigned shorter duration projects at the Wilmington, North Carolina site when not at outages
  • During outages, be part of high-performance teams to perform safe and error-free work for customers
Desired Qualifications
  • Strong mechanical aptitude and/or experience with hands-on work
  • Prior internship or co-op in manufacturing, industrial or field engineering environments
  • Strong team and interpersonal skills, ability to work in project teams
  • Excellent communication skills and ability to articulate technical problems in clear and simple terms
  • Ability to work effectively with minimum supervision
  • Strong customer service mindset
  • Ability to demonstrate an analytical approach to problem solving, learning agility
  • Ability to use basic hand tools
  • Basic computer skills including familiarity with Microsoft Office

GE Vernova is the umbrella for GE’s energy businesses, including Power, Renewable Energy, and Digital, along with Energy Consulting, Energy Financial Services, Grid Solutions, Nuclear Energy, and LM Wind Power. It contributes to about one-third of the world’s electricity and focuses on making energy more reliable, affordable, and sustainable. The company combines hardware, software, services, and financing to deliver end-to-end energy solutions—from gas turbines, wind turbines, and nuclear systems to digital tools and grid infrastructure, supported by consulting and financing. What sets GE Vernova apart is its one-stop portfolio that covers the full energy value chain at a global scale, integrating equipment, software, services, and finance to help customers improve efficiency and decarbonize. Its goal is to speed the transition to reliable, affordable, and sustainable energy for customers around the world.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Cambridge, Massachusetts

Founded

2022

Simplify Jobs

Simplify's Take

What believers are saying

  • Data centre orders drive 20% of 100 GW gas pipeline with pricing 10-20 bps higher.
  • Global electricity supercycle from AI, EVs, and reshoring targets 50% revenue growth by 2028.
  • European expansion via Italian manufacturing and 100-MW wind contracts reduces US market dependence.

What critics are saying

  • Prolec integration failures erode $5B transformer backlog margins within 12-18 months.
  • BWRX-300 NRC regulatory delays push US deployments beyond 2030, stranding R&D investments.
  • Chinese competitors undercut onshore wind prices 25%, capturing 20% European and Asian share.

What makes GE Vernova unique

  • Integrated portfolio spans Power, Wind, and Electrification with $163B backlog and 2x book-to-bill ratio.
  • Prolec GE acquisition adds $5B transformer backlog, accelerating $200B target to 2027.
  • BWRX-300 small modular reactor partnership with Hitachi under $40B US-Japan nuclear plan.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Apr 4th, 2026
GE Vernova secures $6M state funding for $96M energy research centre in Niskayuna

GE Vernova has secured an additional $6 million in state funding for its $96 million Advanced Research Center on Balltown Road in Niskayuna, New York. The grant, awarded through the FAST NY programme, will fund water supply, road and stormwater management upgrades at the campus, offsetting roughly half of the $12 million in required infrastructure improvements. The company previously received $9.6 million in state tax credits linked to plans for creating 75 new jobs at the research centre, along with low-cost hydropower allocation. The site, separate from GE Vernova's existing River Road labs, will house energy technology research including a direct air capture carbon system currently under testing. GE Vernova earned nearly $5 billion in 2025 on $38 billion in revenue, with a market value of $242 billion.

BetaKit
Mar 31st, 2026
ThinkLabs raises $28M USD Series A to help power grids handle AI data centre demand

ThinkLabs has raised $28 million USD ($39 million CAD) in a Series A round led by Energy Impact Partners to help power grids manage surging demand from AI data centres. Nvidia's venture fund NVentures and Edison International participated, alongside returning investors including GE Vernova. The Canadian-led, New York-based startup provides physics-informed AI software that creates digital twins of power grids, simulating scenarios to help operators maintain reliability and reduce outages. The platform reduces what would typically be a six-month, quarter-million-dollar study to under a day's analysis. Founded by former Toronto Hydro smart-grid department head Josh Wong, ThinkLabs spun out of GE Vernova in early 2024 with $6.8 million CAD in seed funding. The company will use the new capital to mature its product and expand features whilst focusing on the North American market.

Yahoo Finance
Mar 20th, 2026
Trump and Japan unveil up to $40B US nuclear reactor plan

President Donald Trump and Prime Minister Sanae Takaichi have unveiled a US-Japan energy investment plan potentially worth $40 billion, centring on small modular nuclear reactors. GE Vernova and Hitachi will develop BWRX-300 reactors in Tennessee and Alabama, whilst Japan will invest up to $33 billion in natural gas plants in Pennsylvania and Texas. The initiative forms part of a broader $550 billion bilateral investment fund agreed under a recent trade pact. It aims to address rising electricity demand from data centres and artificial intelligence infrastructure. However, most SMR designs await regulatory approval and none have been deployed on US grids. The agreement also covers critical minerals and industrial supply chains, with Japanese firms contributing components and participating in rare-earth projects across Indiana, Arizona and North Carolina.

Yahoo Finance
Mar 10th, 2026
GE Vernova shares rise 14.8% in 3 months on AI data centre power demand

GE Vernova shares have risen 14.8% over the past three months, outperforming its Zacks Alternate Energy – Other industry's 4.1% growth. The company is benefiting from surging electricity demand driven by AI data centre expansion, creating strong opportunities for its turbines and grid equipment. GE Vernova is improving profitability in its wind segment through cost controls and portfolio optimisation, whilst its gas power and power services businesses continue strong performance. In March 2026, the company secured a contract for a 100-megawatt wind farm in Italy, supplying 17 turbines plus maintenance support. The company is expanding its Italian manufacturing facility to boost production of transformer components and advancing its BWRX-300 small modular reactor project in Poland, strengthening its position in the nuclear power market.

Yahoo Finance
Mar 4th, 2026
BlackRock tips AI energy stocks over big tech, highlights 3 power plays for surging data centre demand

BlackRock is advising investors to focus on AI energy stocks rather than big tech companies in 2026, as AI data centres drive a surge in power demand. Deloitte anticipates a 30-fold increase in US AI data centre power consumption between 2024 and 2035. Three promising investments include Bloom Energy, which provides hydrogen fuel cell solutions for onsite electricity generation. The company reported $778 million in revenue last quarter, up 36% year over year, with analysts expecting accelerated growth. Constellation Energy, America's leading nuclear power provider, is restarting a Three Mile Island reactor to supply Microsoft's AI data centre. The company generates over two-thirds of its electricity through nuclear power. GE Vernova, General Electric's power production spinoff, reported orders up 34% to $59.3 billion, with a $150 billion backlog.

INACTIVE