Full-Time

Line Servicer

Posted on 2/20/2025

American Electric Power

American Electric Power

Consulting
Energy

Compensation Overview

$54.16Hourly

Junior, Mid

Bassett, VA, USA

Category
Electrical Engineering
Power Systems Engineering

You match the following American Electric Power's candidate preferences

Employers are more likely to interview you if you match these preferences:

Degree
Experience
Requirements
  • High school diploma or GED
  • Minimum of 2 years of work experience as Line Mechanic A, Lineman A, or equivalent experience
  • Valid Class A CDL is required
  • Shall have performed the duties of and have all the qualifications of Lineman A or the equivalent
  • A physical abilities assessment is also required for this position.
Responsibilities
  • Analyze and take corrective action with respect to trouble calls on all types of transmission and distribution circuits and equipment.
  • Investigate trouble calls; patrol and inspect lines; locate, clear and repair faults on lines and equipment.
  • Coordinate and/or conduct complex circuit switching and restoration of service resulting from trouble calls.
  • Work with hot line equipment on energized circuits for emergency repairs or routine maintenance of facilities.
  • Independently interface with emergency forces, such as fire and police departments, to accomplish safe trouble call restoration.
  • Communicate effectively with customers and formulate a plan designed to serve their needs as well as the Company’s in resolving trouble calls.
  • Install, remove, operate and maintain residential, commercial and industrial facilities, both overhead and underground.
  • Disconnect and connect meters; read in and read out meters.
  • Operate line switches; operate switches and replace fuses in stations; request, make and accept line and station clearances.
  • Perform similar or less skilled work.
  • Direct the work of employees assigned to assist.
American Electric Power

American Electric Power

View

Company Size

N/A

Company Stage

IPO

Total Funding

$27M

Headquarters

Columbus, Ohio

Founded

1906

Simplify Jobs

Simplify's Take

What believers are saying

  • AEP's partnership with KKR secures $2.82 billion for capital investment and reliability.
  • The large load tariff settlement supports grid modernization and economic growth in communities.
  • AEP's focus on renewable energy aligns with corporate sustainability commitments and demand.

What critics are saying

  • SEC corruption settlement may impact AEP's reputation and investor confidence.
  • Regulatory scrutiny on large load tariff changes could lead to operational delays.
  • Pursuing SMR sites involves financial and regulatory risks if grants are not awarded.

What makes American Electric Power unique

  • AEP is investing $54 billion from 2025 to 2029 for service enhancement.
  • AEP operates the largest electric transmission system in the U.S. with 40,000 line miles.
  • AEP is exploring Small Modular Reactor sites, indicating a commitment to nuclear innovation.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Company News

PR Newswire
Feb 19th, 2025
Indiana Michigan Power Receives Order In Large Load Settlement

FORT WAYNE, Ind., Feb. 19, 2025 /PRNewswire/ -- Indiana Michigan Power (I&M), an American Electric Power (Nasdaq: AEP) company, has received the Indiana Utility Regulatory Commission's (IURC) recent order regarding its large load tariff settlement filed in late 2024. The term "large load" refers to customers who require a substantial amount of energy to operate and maintain their operations, primarily including data centers and large industrial customers.The joint settlement with the Indiana Office of Utility Consumer Counselor (OUCC), Amazon Web Services (AWS), Microsoft, Google, the Data Center Coalition (DCC) and the Citizens Action Coalition (CAC) reinforces I&M's commitment to providing reliable and affordable service for all customers and allows for the company to pursue opportunities that support the continued economic growth of the communities it serves.The IURC order approved the terms of the joint settlement, with one modification, and requires new large load customers, including data centers, to make long-term financial commitments proportional to their size. This will ensure the costs to serve these large load customers are reasonably recovered from them, and not passed on to existing customers. These investments will also support ongoing grid modernization for the benefit of all customers with enhanced reliability.The modification to the settlement agreement in the approved order states that any reduction of more than 20% of a large load customer's contracted peak capacity, that is mutually agreed upon between I&M and the large load customer, must be submitted to the IURC for its review and approval before becoming effective. This modification allows for increased transparency and Commission oversight of any significant changes to a large load customer's commitment and any associated impacts of such changes."I&M is committed to providing all customers with the best service possible, while doing our part to help grow the communities they call home," said Steve Baker, I&M president and chief operating officer

LexBlog
Feb 19th, 2025
Sixth Circuit Reaffirms Limits on ERISA Benefits Litigation

Kramer was hired in 2018 as the Vice President and Chief Digital Officer for American Electric Power.

MarketBeat
Feb 17th, 2025
ABC Arbitrage SA Makes New $1.65 Million Investment in American Electric Power Company, Inc. (NASDAQ:AEP)

ABC Arbitrage SA makes new $1.65 million Investment in American Electric Power Company, Inc. (NASDAQ:AEP).

PR Newswire
Jan 21st, 2025
Aep Declares Quarterly Dividend On Common Stock

COLUMBUS, Ohio, Jan. 21, 2025 /PRNewswire/ -- The Board of Directors of American Electric Power (Nasdaq: AEP) has declared a regular quarterly cash dividend of 93 cents per share on the company's common stock.The dividend is payable March 10, 2025, to shareholders of record as of Feb. 10, 2025, and is the company's 459th consecutive quarterly common stock cash dividend. AEP has paid a cash dividend on its common stock every quarter since July 1910.About AEPOur team at American Electric Power (Nasdaq: AEP) is committed to improving our customers' lives with reliable, affordable power. We are investing $54 billion from 2025 through 2029 to enhance service for customers and support the growing energy needs of our communities. Our nearly 16,000 employees operate and maintain the nation's largest electric transmission system with 40,000 line miles, along with more than 225,000 miles of distribution lines to deliver energy to 5.6 million customers in 11 states

PR Newswire
Jan 17th, 2025
Aep Seeking Grants To Assist With Advanced Nuclear Site Exploration In Indiana And Virginia

Indiana Michigan Power Rockport Plant site identified as potential location for a Small Modular ReactorFollowing positive community discussions, Appalachian Power submits grant application to support permitting process at Joshua Falls siteCOLUMBUS, Ohio, Jan. 17, 2025 /PRNewswire/ -- American Electric Power (Nasdaq: AEP) is seeking grants from the U.S. Department of Energy (USDOE) to support the Early Site Permit (ESP) process for two potential Small Modular Reactor (SMR) sites. Through its Indiana Michigan Power (I&M) operating company, AEP is announcing that property at the Rockport Plant in Spencer County, Indiana, has been identified as a potential SMR site. Previously AEP, through its Appalachian Power operating company, had announced it was beginning the ESP process for company-owned Joshua Falls property in Campbell County, Virginia.Through a grant funding partnership with the Tennessee Valley Authority (TVA) and GE Hitachi Nuclear Energy (GEH), I&M is seeking $50 million to begin the early stages of SMR development at the Rockport Plant site. If awarded funds, I&M will conduct ESP activities, as well as a Preliminary Safety Analysis Report, which is required for a potential future Construction Permit, at the site utilizing the GEH BWRX-300 technology