Full-Time

Mechanical Systems Expert

Hut 8

Hut 8

11-50 employees

Public company operating Bitcoin mining centers

No salary listed

Corpus Christi, TX, USA + 1 more

More locations: St Francisville, LA, USA

In Person

Full-time on-site role.

Category
Architecture & Civil Engineering (1)

Get referred to Hut 8

See people who can refer or advise you

Requirements
  • At least 8 years of experience in critical facilities mechanical operations, commissioning, or chief-engineer-track roles.
  • Deep hands-on knowledge of chilled water plants, hydronic systems, and data center cooling topologies, including air-cooled, water-cooled, and liquid/direct-to-chip systems.
  • Fluency with Level 1 through Level 5 commissioning from the witness or operations side, including integrated systems testing.
  • Ability to identify maintainability issues in design reviews, including access, isolation, and instrumentation gaps.
  • Rigorous review of turnover documentation, including operations and maintenance documentation.
  • Ability to work embedded with a construction team while maintaining operational requirements.
  • Experience with water treatment and cleanliness protocols for critical hydronic systems.
Responsibilities
  • Review mechanical and cooling designs, including chilled water plants, air and liquid cooling systems, coolant distribution units, computer room air handlers, heat rejection, and water treatment, through an operations lens.
  • File design review comments that address maintainability and operability issues.
  • Inspect mechanical installations at key construction milestones, including pipe routing and support, valve access, equipment clearances, insulation quality, and cleanliness and flushing protocol compliance.
  • Witness Level 3 through Level 5 commissioning of mechanical systems, including functional performance tests, staging and failover sequences, failure scenarios, and integrated systems testing.
  • Drive operational issues into the commissioning log with clear acceptance criteria and personally verify issue closure.
  • Verify mechanical turnover packages, including operations and maintenance documents, as-built documentation, valve tags and system labeling, water treatment baselines, spare parts and consumables lists, and preventive maintenance program inputs.
  • Validate that operator training equips operators to run the plant.
  • Support early operations stabilization after turnover through alarm tuning input, setpoint refinement, and troubleshooting alongside the operations team.
  • Feed operational lessons into mechanical design standards and the next project's basis of design.
Desired Qualifications
  • CFC/EPA certifications, trade licensure, or an engineering degree.

Hut 8 is a large digital asset mining and data center operator in North America. It runs facilities that house Bitcoin mining hardware and other high-performance computing workloads, including services that self-mine, host third-party mining rigs, and manage infrastructure for clients using its own software. The company’s campuses are in New York, Nebraska, and Texas, and after merging with USBTC it became a publicly traded entity (HUT) on Nasdaq and the Toronto Stock Exchange, with a broader mix of revenue from economical mining, computing workloads, and hosted/managed services. What sets Hut 8 apart is its scale as a publicly listed miner, its diversified business model across self-mining, hosting, and managed infrastructure, and its partnerships with other big players (e.g., Celsius Network, Marathon Digital, Foundry USA). Its goal is to be a leading operator in the digital asset space by focusing on efficient, reliable mining operations and strong ESG practices.

Company Size

11-50

Company Stage

N/A

Total Funding

N/A

Headquarters

Miami, Florida

Founded

2020

Get referred to Hut 8

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 revenue reached $74.9 million, up sharply from $41.3 million.
  • Beacon Point's second 352 MW lease on July 20, 2026 fully commercialized 1 GW.
  • Initial data hall deliveries target Q2 2027 and Q3 2027, extending revenue visibility.

What critics are saying

  • Q2 2026 net loss hit $177.1 million after digital-asset losses and financing costs.
  • Beacon Point and River Bend depend on 2027 construction, exposing Hut 8 to delays.
  • Failed Beacon Point leasing leaves Hut 8 with stranded power and $7.5 billion debt.

What makes Hut 8 unique

  • Hut 8's power-first platform monetizes land, substations, and utility capacity, not just bitcoin.
  • By August 2026, 100% of 949 MW contracted AI capacity is investment-grade backstopped.
  • River Bend and Beacon Point raised $7.5 billion in non-recourse project financing.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

Health Savings Account/Flexible Spending Account

Unlimited Paid Time Off

Flexible Work Hours

Remote Work Options

Paid Vacation

Paid Sick Leave

Paid Holidays

Sabbatical Leave

Hybrid Work Options

Stock Options

Company Equity

401(k) Retirement Plan

Wellness Program

Mental Health Support

Gym Membership

Phone/Internet Stipend

Home Office Stipend

Conference Attendance Budget

Professional Development Budget

Family Planning Benefits

Fertility Treatment Support

Adoption Assistance

Parental Leave

Relocation Assistance

Commuter Benefits

Employee Referral Bonus

Tuition Reimbursement

Professional Certification Support

Mentorship Program

Training Programs

Education allowance

Tuition Reimbursement

Meal Benefits

Pet Insurance

Legal Services

Employee Discounts

Company Social Events

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

0%

2 year growth

0%
Yahoo Finance
Aug 26th, 2026
Hut 8 CFO sells $508K in shares after 240% one-year return

Sean Joseph Glennan, Chief Financial Officer of Hut 8 Corp., sold 6,445 shares at $78.76 per share on 24 August 2026, according to an SEC filing. The sale was worth approximately $508,000. The transaction was executed automatically under a Rule 10b5-1 trading plan to cover tax liabilities from vesting restricted stock units, not a discretionary sale. Despite the sale, Glennan's direct holdings increased from 12,068 to 17,978 shares following the vesting event. The sale occurred as Hut 8's stock achieved a 240% return over the prior year. Shares closed at $79.56 on the transaction date, giving the company a market capitalisation of $9.0 billion. Hut 8 operates as an energy infrastructure platform serving energy-intensive computing operations, including cryptocurrency mining and data centres.

PR Newswire
Aug 4th, 2026
Hut 8 secures $7.5B financing, signs $26.6B in AI data center contracts across 949 MW capacity

Hut 8 reported second quarter 2026 results, highlighting the completion of its first gigawatt-scale AI data centre campus at Beacon Point with a second 352 MW lease signed after quarter-end. The company secured $7.5 billion in investment-grade project financing across two offerings during the quarter. Hut 8 now has 949 MW of contracted IT capacity representing approximately $26.6 billion in expected aggregate base-term contract value and more than $1.75 billion in expected average annual net operating income. Facilities representing 1,330 MW are under construction at River Bend and Beacon Point, with initial data hall deliveries targeted for Q2 2027 and Q3 2027 respectively. The company reported revenue of $74.9 million for the quarter and a net loss of $177.1 million, compared to net income of $137.5 million in the prior-year period.

Intellectia AI
May 22nd, 2026
| Intellectia

Why undefined stock move today? undefined...

PR Newswire
May 6th, 2026
Hut 8 secures $9.8B AI data centre lease, closes $3.25B investment-grade bond offering

Hut 8 has secured $16.8 billion in contracted lease revenue across two hyperscale AI campuses, the company announced in its first quarter 2026 results. The energy infrastructure platform signed a 15-year, 352 MW lease at its Beacon Point AI data centre with a high-investment-grade tenant, representing $9.8 billion in contract value. The company closed a $3.25 billion offering of investment-grade senior secured notes to finance its River Bend AI data centre campus, marking the first single-sponsor data centre project to access the investment-grade construction bond market. Hut 8 also refinanced its Bitcoin-backed credit facility, reducing debt costs from 9% to 7%. First quarter revenue reached $71 million, compared to $21.8 million in the prior year. The company maintains an 8,375 MW development pipeline.

PR Newswire
May 6th, 2026
Hut 8 secures $9.8B AI data centre lease, expanding contracted capacity to 597 MW

Hut 8 has commercialised the first phase of its Beacon Point AI data centre campus in Texas through a 15-year, $9.8 billion lease with a high-investment-grade tenant for 352 MW of IT capacity. The triple-net lease could reach $25.1 billion if all renewal options are exercised. The transaction brings Hut 8's total contracted AI data centre capacity to 597 MW with aggregate base-term contract value of approximately $16.8 billion. The facility will deliver a 352 MW AI factory designed to NVIDIA's DSX reference architecture, with initial data hall delivery expected in Q3 2027. Beacon Point has secured 1,000 MW of utility capacity, with initial energisation expected in Q1 2027. Hut 8 is developing the campus with partners including American Electric Power, Vertiv Holdings, and Jacobs.