Full-Time

Lead Maintenance & Reliability Specialist

Alliant Energy

Alliant Energy

1,001-5,000 employees

Regulated electric and natural gas utility

Compensation Overview

$116k - $161k/yr

+ Annual incentive program

No H1B Sponsorship

Madison, WI, USA + 3 more

More locations: Pardeeville, WI, USA | Sheboygan, WI, USA | Beloit, WI, USA

In Person

Bachelor's

Category
Mechanical Engineering (1)
Required Skills
CAD

Get referred to Alliant Energy

See people who can refer or advise you

Requirements
  • A bachelor's degree in Maintenance and Reliability, Computer Science, Engineering, or a related area is preferred.
  • At least 10 years of technical and/or professional experience, including 7 years of direct working knowledge of generating equipment, maintenance work methods, and large rotating equipment maintenance.
  • Ability to use computer software programs, including email, word processing, spreadsheet, and project management software.
  • Ability to read and understand technical drawings and manuals.
  • Ability to work effectively in a collaborative and inclusive work environment.
  • Effective interpersonal, verbal, and written communication skills.
Responsibilities
  • Identify, plan, and implement predictive and preventive maintenance programs, including equipment inspection plans, predictive maintenance programs, and scheduled preventive and corrective maintenance activities.
  • Make recommendations on equipment replacement and prepare cost estimates for equipment repairs or system improvements.
  • Recommend the development or revision of equipment standards and review recommended changes and improvements from others.
  • Identify, plan, and implement generating reliability improvement programs, including complex asset reliability studies and analyses, and recommend changes, improvements, and generating equipment or system design modifications for future projects.
  • Assist personnel with implementing and interpreting predictive and preventive maintenance programs.
  • Provide technical support and guidance to less experienced maintenance and reliability coordinators.
  • Develop and provide technical support to maintenance and operations staff at generating facilities.
  • Enter data to maintain an accurate maintenance work backlog database and ensure supporting documentation is complete and accurate and the generating equipment database structure is up to date.
  • Analyze predictive maintenance test results and review or authorize test results from less experienced employees when needed.
  • Make recommendations based on predictive maintenance test results.
  • Provide technical assistance to mechanical and operations personnel during emergency situations, including analyzing test data to determine the nature and severity of problems and recommending courses of action.
  • Work with engineering personnel to develop equipment standards incorporating predictive and preventive maintenance practices and procedures.
  • Work with maintenance personnel to identify plant issues and propose solutions.
  • Lead teams reviewing equipment replacement recommendations when needed.
  • Perform other duties as needed to support the organization’s purpose and values.
  • Successfully complete a background check and a drug screen where applicable.
Desired Qualifications
  • Advanced knowledge of maintenance strategies, including predictive maintenance, preventive maintenance, and reliability-centered maintenance.
  • Advanced knowledge of the design and operational characteristics of generating equipment, including turbines, generators, boilers, fans, pumps, and large motors.
  • Advanced knowledge of electrical systems, mechanical systems, and power production systems.
  • Advanced knowledge and/or certifications in predictive maintenance technologies, such as acoustic analysis, vibration analysis, oil analysis, and infrared analysis.
  • Advanced knowledge of root cause failure analysis, including identifying physical, latent, and human failure mechanisms.

Alliant Energy is a regulated utility that provides electric and natural gas services to residential, commercial, and industrial customers in the Midwest, mainly Iowa and Wisconsin. It generates, distributes, and sells electricity and natural gas, and also collects service fees for energy distribution and maintenance. The company operates under state and federal regulation to ensure fair pricing and reliable service. It funds renewable energy projects such as wind and solar, runs energy-efficiency programs, and offers financial assistance to low-income customers while supporting local communities. Its approach combines steady regulated operations with ongoing investments in cleaner energy and customer assistance to maintain affordable, reliable service.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Madison, Wisconsin

Founded

1917

Get referred to Alliant Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • On July 30, 2026, Alliant beat EPS estimates and reaffirmed $3.36-$3.46 guidance.
  • Management expects about 60% load growth by 2031, driven by five executed electric service agreements.
  • QTS, Google, and Meta projects are already advancing, supporting earnings into 2027-2029.

What critics are saying

  • Morgan Valley faces organized local opposition, with Linn County hearings and IUC docket GCU-2026-0002 unresolved.
  • A permit denial or delay before December 2026 would push 2027 construction and 2030 commissioning.
  • Data-center concentration risks stranded generation if hyperscale customers slow, cancel, or renegotiate load.

What makes Alliant Energy unique

  • Alliant Energy's Iowa-Wisconsin regulated footprint anchors predictable rate-base growth and allowed returns.
  • Its 2026 pipeline includes 3.4 gigawatts of contracted large-load demand, mostly data centers.
  • Morgan Valley and other projects exploit existing Midwest transmission and utility permitting infrastructure.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

401(k) Retirement Plan

401(k) Company Match

Tuition Reimbursement

Paid Vacation

Hybrid Work Options

Wellness Program

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

0%

2 year growth

0%
MarketBeat
Aug 30th, 2026
Benjamin Edwards Inc. grows position in Alliant Energy Corporation $LNT.

Benjamin Edwards Inc. grows position in Alliant Energy Corporation $LNT. August 30, 2026 Key points. * Benjamin Edwards Inc. increased its Alliant Energy stake by 375.7% in the second quarter, holding 285,330 shares worth approximately $21.8 million. Institutional investors collectively own 79.9% of the company. * Analyst sentiment remains positive overall, with a consensus rating of "Moderate Buy" and an average price target of $77.00, despite some recent target-price reductions and one sell downgrade. * Alliant Energy exceeded quarterly earnings expectations, reporting $0.65 in EPS versus the $0.58 estimate and $971 million in revenue. The company also pays a quarterly dividend of $0.535 per share, equating to a 3.1% annualized yield. * Five stocks we like better than Alliant Energy. Benjamin Edwards Inc. lifted its holdings in shares of Alliant Energy Corporation (NASDAQ:LNT - Free Report) by 375.7% during the second quarter, according to the company in its most recent Form 13F filing with the Securities and Exchange Commission. The fund owned 285,330 shares of the company's stock after acquiring an additional 225,351 shares during the period. Benjamin Edwards Inc. owned 0.11% of Alliant Energy worth $21,766,000 at the end of the most recent reporting period. Several other hedge funds have also made changes to their positions in the business. Cedar Mountain Advisors LLC acquired a new position in Alliant Energy during the second quarter worth $26,000. Clearstead Trust LLC purchased a new position in Alliant Energy during the second quarter worth $27,000. Measured Wealth Private Client Group LLC acquired a new position in Alliant Energy in the 3rd quarter valued at about $27,000. Barrow Hanley Mewhinney & Strauss LLC acquired a new position in shares of Alliant Energy in the second quarter valued at approximately $32,000. Finally, Western Wealth Management LLC acquired a new stake in Alliant Energy during the first quarter worth approximately $41,000. Institutional investors and hedge funds own 79.90% of the company's stock. Wall Street analysts forecast growth. Several analysts have commented on the stock. TD Cowen initiated coverage on shares of Alliant Energy in a research note on Tuesday, July 7th. They issued a "hold" rating and a $83.00 target price for the company. Scotiabank reissued a "sector perform" rating and set a $74.00 price target (up from $72.00) on shares of Alliant Energy in a research note on Monday, May 4th. Wall Street Zen cut Alliant Energy from a "hold" rating to a "sell" rating in a report on Sunday, August 9th. BMO Capital Markets lowered their price objective on Alliant Energy from $80.00 to $78.00 and set an "outperform" rating for the company in a research report on Monday, August 3rd. Finally, Mizuho dropped their target price on Alliant Energy from $76.00 to $75.00 and set a "neutral" rating for the company in a research note on Monday, August 3rd. Nine analysts have rated the stock with a Buy rating and five have assigned a Hold rating to the company's stock. According to MarketBeat.com, Alliant Energy presently has a consensus rating of "Moderate Buy" and an average price target of $77.00. Alliant Energy stock down 0.3%. Shares of NASDAQ:LNT opened at $68.03 on Friday. The stock has a 50-day simple moving average of $72.87 and a 200-day simple moving average of $72.21. The stock has a market capitalization of $17.64 billion, a P/E ratio of 21.53, a PEG ratio of 2.52 and a beta of 0.55. Alliant Energy Corporation has a 1 year low of $63.28 and a 1 year high of $78.81. The company has a debt-to-equity ratio of 1.41, a quick ratio of 0.35 and a current ratio of 0.47. Alliant Energy (NASDAQ:LNT - Get Free Report) last posted its quarterly earnings results on Thursday, July 30th. The company reported $0.65 EPS for the quarter, beating the consensus estimate of $0.58 by $0.07. The firm had revenue of $971.00 million for the quarter, compared to analyst estimates of $896.94 million. Alliant Energy had a net margin of 18.45% and a return on equity of 11.16%. Alliant Energy's revenue for the quarter was up 1.0% compared to the same quarter last year. During the same quarter last year, the firm posted $0.68 earnings per share. Alliant Energy has set its FY 2026 guidance at 3.360-3.460 EPS. Equities analysts forecast that Alliant Energy Corporation will post 3.43 earnings per share for the current year. Alliant Energy dividend announcement. The firm also recently announced a quarterly dividend, which was paid on Monday, August 17th. Investors of record on Friday, July 31st were issued a dividend of $0.535 per share. The ex-dividend date was Friday, July 31st. This represents a $2.14 annualized dividend and a dividend yield of 3.1%. Alliant Energy's payout ratio is presently 67.72%. About Alliant Energy. Alliant Energy Corporation NASDAQ: LNT is a publicly traded energy holding company headquartered in Madison, Wisconsin, that provides regulated electric and natural gas utility services in the American Midwest. The company serves customers primarily in Wisconsin and Iowa through its regulated utility subsidiaries and operates as an integrated provider responsible for generation, transmission and distribution of energy to residential, commercial and industrial customers. Alliant Energy's core activities include operating and maintaining electric generation assets, managing the regional transmission and distribution network, and delivering natural gas service to its franchise territories. Further reading. This instant news alert was generated by narrative science technology and financial data from MarketBeat in order to provide readers with the fastest reporting and unbiased coverage. Please send any questions or comments about this story to [email protected]. Continue following MarketBeat Before you consider Alliant Energy, you'll want to hear this. MarketBeat keeps track of Wall Street's top-rated and best performing research analysts and the stocks they recommend to their clients on a daily basis. MarketBeat has identified the five stocks that top analysts are quietly whispering to their clients to buy now before the broader market catches on... and Alliant Energy wasn't on the list. While Alliant Energy currently has a Moderate Buy rating among analysts, top-rated analysts believe these five stocks are better buys. The AI boom extends far beyond the biggest tech names. Discover 10 companies supplying the memory, storage, networking, semiconductor manufacturing, and power infrastructure that make AI possible. Learn where the next wave of AI investment opportunities may emerge - and the key risks investors should watch as the global AI buildout accelerates.

Sinclair Broadcast Group
Aug 28th, 2026
Atkins says Alliant land split puts site 1.7 miles from Atkins and Fairfax, not 2.25

Atkins says Alliant land split is too close to city boundaries. by Nada Shamah Fri, August 28, 2026 at 12:14 PM Atkins says Alliant land split puts site 1.7 miles from Atkins and Fairfax, not 2.25. LINN COUNTY, Iowa - On Thursday, Iowa's News Now told you that the City of Atkins is opposing the sale of part of a 160-acre plot of land in unincorporated Linn County to Alliant Energy. The owner, Bowland Farms, has a purchase agreement with Alliant and the sale is for the proposed Morgan Valley Energy Center. Earlier this week, Atkins city leaders sent a letter to the Linn County Planning and Zoning Commission opposing Alliant's request to rezone the just over 10 acres, from agriculture use to exclusive use. The change would allow for large scale facilities like industrial and energy facilities. Atkins City Administrator Scott Flory says changing any part of the land to fit something industrial does not go along with what the city envisions for the future. He also says the area is closer that the 2.25-mile ordinance requirement. "The applicant is taking the measurement from the lot that is not yet created. So, we would disagree with how the applicant has determined that measurement. In our measurement, both the City of Atkins, as well as the City of Fairfax are equally 1.7 miles from this proposed parcel split," Flory said. Alliant has already filed a rezoning application with the Linn County Planning and Zoning Commission. Flory says the city will be at the meetings, speaking out against the proposal. "We want to make it clear that we oppose the industrialization of high-quality productive farm ground, which this is frankly some of the best farm ground in Benton County, probably Iowa and maybe even in the country," he said. Flory also expressed concern about the pollution that would come along with the gas plant, and concerns about air and water quality and the increase of pollution. CBS 2 Iowa reached out to Boland Farms and did not get a response. Alliant Energy sent CBS 2 Iowa the following statement: Input from local governments and community members is a common part of the review process, and Linn County will consider information submitted by interested parties as part of its evaluation of the rezoning request. The Morgan Valley Energy Center site complies with the 2.25-mile setback from population areas that was established by the Linn County Board of Supervisors and remains a critical project to help meet growing energy demand and strengthen the energy system that customers and communities depend on every day. CBS 2 Iowa remain focused on delivering reliable, cost-effective service for customers while participating fully in the review process. The meeting with the Planning and Zoning Commission will be on September 28th. Members of the commission will then present their decision to the Linn County Board of Supervisors for the final ruling. That meeting will likely be in October. SPONSORED CONTENT MORE TO EXPLORE

Elderbridge Agency on Aging
Aug 19th, 2026
Alliant Energy Foundation awards $5,000 grant to support emergency meal kits.

Alliant Energy Foundation awards $5,000 grant to support emergency meal kits. Elderbridge Agency on Aging is honored to receive a $5,000 grant from the Alliant Energy Foundation to provide emergency shelf-stable meal kits for low- to moderate-income older adults and adults with disabilities throughout its 29-county service area. The grant will help ensure that vulnerable individuals continue to have access to nutritious meals when regular meal services are disrupted by severe weather, staff illness, volunteer shortages, or facility issues such as flooding or equipment failure. Because the meals require no refrigeration or preparation, they provide a dependable emergency food source for both congregate meal participants and homebound clients. Meal kits will be prioritized for individuals at greatest risk, including those living in poverty, experiencing food insecurity, facing social isolation, at risk of malnutrition, or at risk of institutionalization due to functional limitations. The Alliant Energy Foundation supports nonprofit organizations and community initiatives that strengthen the health and well-being of the communities they serve. Elderbridge is grateful for the Foundation's investment in helping older adults remain safe, healthy, and independent during unexpected emergencies. On behalf of the Elderbridge Board of Directors, staff, and the clients Elderbridge Agency On Aging serve, Elderbridge Agency On Aging sincerely thank the Alliant Energy Foundation for its generous support of the Elderbridge mission. Partnerships like this help ensure that older adults and adults with disabilities have access to essential nutrition when they need it most. Elderbridge Agency on Aging. Subscribe! Sign Me Up!

Corridor Media Group, Inc.
Aug 14th, 2026
Save Morgan Valley hosts guest speakers to address Alliant's gas-fired power plant proposal.

Save Morgan Valley hosts guest speakers to address Alliant's gas-fired power plant proposal. Beloit-based speakers tout efforts to impact similar projects in Wisconsin Dr. Brittany Keyes, Clean Air Policy Manager for Healthy Climate Wisconsin, speaks during a public forum hosted by Save Morgan Valley Tuesday, Aug. 11, 2026 at the Ushers Ferry Lodge in Cedar Rapids. CREDIT RICHARD PRATT Guest speakers at a Cedar Rapids public forum hosted by Save Morgan Valley Tuesday night, Aug. 11 offered sharp criticisms of Alliant Energy's plan for a natural gas power plant in western Linn County, focusing on the plant's potential environmental and health impacts. Morgan Valley proposal. The Save Morgan Valley group was formed in March after Alliant - through its Iowa subsidiary, Interstate Power and Light - formally proposed the Morgan Valley Energy Center, a natural-gas-fired power plant on roughly 160 acres near Highway 30 and Benton-Linn Road, about 2.5 miles northwest of Fairfax in unincorporated Linn County. The plant would use three 240-megawatt combustion turbine generators, for a combined capacity of about 720 megawatts. The facility footprint itself is about 55 acres, Alliant has said, with the remainder of the site to be restored for agricultural use. Alliant filed its application with the Iowa Utilities Commission (IUC) April 30, seeking a certificate of public convenience, use and necessity for the plant, and has asked regulators for a decision by December. If the plant is approved, construction is targeted for the second quarter of 2027, with operations planned to begin in the second quarter of 2030. Alliant has estimated construction of the plant would employ up to 360 workers with payroll of $110 to $160 million, and separately projects roughly 200 permanent-equivalent jobs, nearly $90 million in local economic output, and more than $24 million in tax revenue over the plant's operating life. The application does not identify specific customers for the plant's output and that no power purchase agreements currently exist, even though the site selection is tied at least in part to rising power demand from data centers under construction on the southwest side of Cedar Rapids. Beyond the IUC review, the project requires two other approvals: An air quality permit from the Iowa DNR, working jointly with Linn County Public Health under the federal Prevention of Significant Deterioration/Title V process, for which Alliant filed its application on July 21, and a Linn County rezoning/land-use approval, which is expected to be officially considered this fall. Fairfax, Atkins, and Benton County have each filed to formally intervene in the IUC case. Save Morgan Valley leaders say the group has gathered more than 3,000 petition signatures opposing the project, and has retained legal counsel to formally intervene in the IUC case. Issues raised during meeting. More than 100 area residents, many wearing orange shirts bearing the phrase "Save Morgan Valley," attended Tuesday night's meeting at the Usher's Ferry Historic Village lodge in Cedar Rapids. Speakers for the event included Lori Huntoon, a professional geologist/environmental consultant, and Dr. Brittany Keyes, Clean Air Policy Manager for Healthy Climate Wisconsin, who both traveled from the Beloit, Wisconsin area to share their experience fighting similar gas plants in Wisconsin. Group leaders said they remain uncertain who the plant will serve, but said they suspect it is intended to serve data centers, rather than general residential or commercial demand. "Tthis is a 720 megawatt gas-fired power plant. That's enough to power about half a million homes," said Jon Lee, one of the group's most visible members. "We believe that it's going to be used for data centers, and a lot of the documentation that we need to understand what the need is is behind confidential information at the state level. We can't prove that, and that is the problem." Dr. Keys said Iowa is currently a net exporter of energy, meaning the state generates more power than its current electrical demand requires. "You don't need more coal or gas plants," Ms. Keys said. "What you're being asked to do is take on this new gas plant to power data centers. You're being asked to be sacrificed to power data centers." Speakers also argued the plant will raise electricity and gas costs for local ratepayers, and repeatedly stressed air quality concerns related to the proposed plant. Alliant's July 21 air permit filing asks the DNR for a waiver from a requirement to conduct site-specific air monitoring for one year, and instead wants to use data from an existing monitor located in downtown Cedar Rapids. Mr. Lee said the plant's application acknowledges its emissions will exceed air quality levels for PM2.5 and PM10, as well as carbon monoxide. The group is asking attendees to email DNR and Linn County Public Health officials to oppose the waiver and request on-site monitoring, including both during pre-construction and plant operation. Ms. Keys said Linn County's current PM2.5 level is "about 8," nearing the EPA standard of 9, and the county has a failing grade for ozone from the American Lung Association. "Really, there's no safe level of this pollutant when it comes to human health," she said. As proposed, the Morgan Valley plant would use a simple-cycle combustion design, which would generate more emissions than a combined-cycle design. Ms. Huntoon said she's not aware of any large-scale power plants that have completed an Environmental Impact Statement, and questioned why that standard doesn't apply here. "It just puzzles me," she said. "Why are these companies coming in from out of state and they don't need to do this? That just seems very very wrong." Ms. Huntoon specifically discussed water needs for a gas-fired plant's cooling systems. She said the plant's water source is not yet known, but that roughly 85 wells within a 1.5 to 2 mile radius of the site could be affected by a "cone of depression" if a large supply well is installed to serve the plant. She also said Morgan Creek, near the proposed plant, has been listed as impaired in every DNR assessment cycle from 2016 to 2024, which she said should trigger an anti-degradation review under the Clean Water Act. Speakers also raised concerns about thermal pollution from stormwater and plant discharge affecting aquatic organisms; heat-island effects that can raise local ground surface temperatures by 3.5 to 16 degrees for up to several miles, potentially impacting area farm operations; and noise, including a low-frequency "hum" that may impact some residents more than others. Ms. Huntoon noted that the plant's proposed location contains habitat for several protected and endangered species. Ms. Keys discussed two Wisconsin cases as examples of successful community resistance - a similar-sized West Riverside Energy Center in Rock County, where a promised coal-plant retirement was repeatedly delayed and county emissions rose after the gas plant came online; and a proposed 630-megawatt gas plant near Superior, where sustained community organizing led the local planning commission and city council to deny the zoning change and road vacation needed for the project, stopping it even after state-level approvals had already been granted. Alliant Energy's response. Alliant Energy spokesperson Taylor Adams provided a statement after Tuesday's meeting: "The Morgan Valley Energy Center is needed to meet growing energy demand and support the reliable electric service our customers and communities depend on. The project is subject to a thorough regulatory review process designed to ensure compliance with federal, state and local environmental and public health requirements. Alliant Energy has a strong track record of environmental compliance and decades of experience operating regulated energy facilities under extensive oversight."

The Gazette
Jul 31st, 2026
Open house offers Morgan Valley Energy Center answers.

Open house offers Morgan Valley Energy Center answers. Alliant reps meet with public, but Save Morgan Valley attendees dominate. * fern alling the Gazette * jul 31, 2026 updated 48 mins ago. The Gazette offers audio versions of articles using Instaread. Some words may be mispronounced. Since Alliant Energy first notified the public in late March of its plans to build a 720-megawatt natural-gas-fired electricity plant in unincorporated Linn County, residents have had questions. At previous meetings, attendees directed those questions at Alliant representatives, including senior community and public affairs specialist Ben Rogers. At the time, Rogers said he was just there to take notes. But Thursday, at two open-house sessions Alliant held at the International Brotherhood of Electrical Workers Local 405 hall, Alliant reps started sharing answers. "People have had questions, and we've wanted to answer them, but the applications weren't submitted yet," Rogers said. There are three permits Alliant needs for the Morgan Valley Energy Center to be built: one with the Iowa Utilities Commission confirming a need for the plant, one with the Iowa Department of Natural Resources and Linn County Public Health that confirms the plant meets regulatory requirements for air quality and one with Linn County to rezone the land in unincorporated Linn County south of Highway 30 near Linn Benton Road. Alliant had officially begun all three application processes when it submitted its rezoning application July 15. The articles in this timeline follow Alliant Energy's initial plans to build a natural gas-fired power plant - known as the Morgan Valley Ener... Unlike the public meeting Alliant was required to hold in March as part of its application with the Iowa Utilities Commission, Thursday's events were voluntary and meant to address some of the increasingly specific questions members of the public, including advocacy group Save Morgan Valley, have about the project. But despite the opportunity to talk to Alliant representatives about their questions, some Save Morgan Valley members said they remained critical of the plant. Questions and answers. Save Morgan Valley founding member Jon Lee attended the first open house session from noon to 1:30 p.m. and returned for the second one with additional questions. In an interview with the Gazette on Tuesday, Lee said he wanted to know what it would take for the company to consider installing selective catalytic reduction technology in the plant to reduce nitrogen dioxide emissions. Lee said he planned to ask whether the company would conduct health impact and air quality studies to assess the facility's impact on nearby residents. Before he entered the second session, Lee said it was clear from the first session that the Alliant representatives had anticipated his questions. He said one representative interrupted a conversation Lee was having with an Alliant engineer to explain the process himself. "When I go in there, everyone knows my name already," Lee said. "It's like they're waiting for me." Jeff Hanson, director of environment and sustainability at Alliant, said selective catalytic reduction technology would not be used in the Morgan Valley Energy Center because of the way the plant will operate. The facility's three turbines will be simple-cycle turbines, as opposed to combined-cycle turbines. In combined-cycle turbines, the waste heat the turbines generate is directed to an external engine to produce additional energy. Simple-cycle turbines do not use the waste heat. Some questions for a Linn County Public Health staff and an Alliant Energy representative went unanswered at Wednesday's informational meeting Materials distributed by Alliant at the events said the simple cycle system is a better fit for the area's current energy needs, which are more for backup power and peak energy demand rather than the constant generation a combined cycle would be better suited for. Based on the amount of time the turbines would run - Hanson said the plant was permitted to run 40% or less of the year - and the type of turbine being used, Hanson said the selective catalytic reduction technology would ultimately be unable to deliver meaningful emissions reductions. As for air quality and health studies, Hanson pointed to the air quality impact assessment required for the permit Alliant is seeking from the Iowa Department of Natural Resources and Linn County Public Health. If the permit is approved, it means the departments found the company's plans were in line with federal and state standards that protect public health, Hanson said. "I've been asked a few times tonight, 'Well, are you doing air quality studies? Are you doing health impact studies?'" Hanson said. "That is a health impact study." Attendance. A spokesperson with Alliant estimated 75 people attended the morning session and around 50 attended the evening session. Save Morgan Valley held a press conference about the plant's water usage from 6 to 7:30 Thursday evening, overlapping with the evening session. Cindy Boland, who lives near Fairfax, was one of the estimated 50 people who attended the Thursday evening session. Boland, who is a member of Save Morgan Valley, said not only did she not want the plant built in its intended location near Linn Benton Road, she didn't want it built anywhere. "I don't think we should be building more natural gas plants," Boland said. "I think we should be using green energy." When asked how many members of the public who weren't affiliated with Save Morgan Valley attended the evening session, Boland said she recognized just about everybody in the room. She attributed the turnout to a lack of outreach on Alliant's part. "They're doing it so they can say they did it," Boland said. "But there's no public education happening here because there's no public here." Boland said Save Morgan Valley meetings generally drew 75 to 125 people, about the same number who attended the two Alliant information sessions Thursday. "When we talk to people about what it is, everybody's opposed," Boland said. "Nobody wants this." When asked if the event was likely to change public opinion on the plant, Rogers said its purpose was to help people understand the decisions being made. "Everyone has their own perspective," Rogers said. "Our job is to make sure everyone has the information." Linn County, Iowa Morgan Valley Energy Center permitting process Alliant Energy needs to complete three applications for county and state permission to build the Morgan Valley Energy Center: a petition for a certificate of public convenience, use and necessity from the Iowa Utilities Commission, a Prevention of Significant Deterioration permit from the Iowa Department of Natural Resources, and a rezoning application from the Linn County Planning and Zoning Commission and Board of Supervisors. Once all three are complete, the project is approved.