Full-Time

Wind Turbine Technician

Power

Deadline 10/23/26
Iberdrola Group

Iberdrola Group

10,001+ employees

Global utility generating renewable energy

Compensation Overview

$28.50 - $41.25/hr

+ Performance-based bonus + 12% 401(k) match

No H1B Sponsorship

Dana, IL, USA

In Person

About 10–15% travel to other sites may be required.

Certification

Category
General Maintenance & Repair (1)
Required Skills
Quality Assurance (QA)

Get referred to Iberdrola Group

See people who can refer or advise you

Requirements
  • One year of college or a technical school certificate, or 12 months of related experience or wind industry training, or an equivalent combination of education and experience; a high school diploma or GED is required.
  • Familiarity with maintenance and electronic testing equipment, including voltage testers, amp clamps, oscilloscopes, megohmmeters, infrared testers, hydraulic torque equipment, alignment tools, and hand and power tools.
  • Advanced computer skills using word processing, spreadsheets, email, facility control, management and reporting systems, computerized diagnostic tools, and troubleshooting tools.
  • Ability to climb towers up to 100 meters daily to perform maintenance in the nacelle and hub.
  • Ability to frequently lift items weighing up to 60 pounds and occasionally lift items up to 100 pounds.
  • Ability to work with electrical wires and differentiate between color-coded wires.
  • Ability to interpret and follow written, oral, diagrammatic, and schedule-based instructions.
  • Ability to solve practical problems and address varied concrete situations with limited standardization.
  • Knowledge of heavy equipment required for facility maintenance, including crane and rigging requirements.
  • A valid driver's license and acceptable driving record are required.
  • Weight must not exceed 285 pounds, excluding equipment or gear worn while performing job-related tasks.
Responsibilities
  • Operate and maintain wind turbine equipment and associated infrastructure, including substation, collection, and transmission systems.
  • Read schematics and troubleshoot complicated mechanical, electrical, and hydraulic problems involving variable-pitch and variable-speed control systems and components.
  • Repair or replace mechanical and electrical components to correct malfunctions while following manufacturer requirements.
  • Comply with project environmental, health, and safety programs.
  • Perform preventive maintenance in accordance with original equipment manufacturer maintenance manuals.
  • Adhere to effective internal controls.
  • Collect data and prepare reports to meet wind plant reporting requirements.
  • Perform retrofits and design modifications.
  • Perform quality assurance and quality control functions and compile and submit supporting documentation of items found.
  • Support construction in mechanical and commissioning walk-downs when applicable.
  • Increase professional knowledge of turbine or solar equipment, including safety regulations.
  • Work overtime on holidays, weekends, and short notice while participating in an on-call schedule.
  • Travel to other sites on short notice when required, with approximately 10–15% travel.
  • Perform duties around low-, medium-, and high-voltage equipment.
  • Work in extremely adverse weather conditions.
Desired Qualifications
  • Experience in power plant operations and maintenance.
  • Experience in wind and solar plant construction, operation, and maintenance, including wind turbines and solar power converters and inverters.
  • Experience in high-voltage switching.
  • Related experience in fields requiring strong electrical and mechanical aptitude.
  • Residence in or near the greater local area.

Iberdrola is a Spanish electric utility that develops and delivers electricity from renewable sources such as wind, solar, hydro, and hydrogen. It generates, transmits, distributes, and sells power and also offers energy services like smart grids and efficiency solutions for homes and businesses. Its products work by producing clean electricity and delivering it through its networks while providing tools to improve energy use and grid performance. The company aims to accelerate the shift to a low-carbon economy by expanding renewables, modernizing grids, and investing in sustainable technologies across Europe, the US, Brazil, Mexico, and Australia.

Company Size

10,001+

Company Stage

IPO

Headquarters

Bilbao, Spain

Founded

2008

Get referred to Iberdrola Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • H1 2026 investments rose 25% to about €7 billion, signaling accelerating deployment.
  • June 2026 green-bond demand exceeded €4.5 billion, proving cheap capital access.
  • Vineyard Wind won a January 2026 court ruling, preserving Avangrid’s offshore wind pipeline.

What critics are saying

  • Trump administration attacked Avangrid’s New England Wind permits in 2025; construction disruption hits 2026 timelines.
  • Iberdrola’s 2026 interim report shows €6.765 billion working-capital shortfall, pressuring flexibility.
  • Brazil remains litigation-heavy, while Mexico exit and asset sales expose execution risk through 2026.

What makes Iberdrola Group unique

  • Iberdrola raised €1.5 billion green bonds in June 2026, 3x oversubscribed.
  • Its 2025-2028 plan targets €21 billion for renewables, mostly under construction.
  • Caruna acquisition and Neoenergia buyout deepen its regulated networks moat in Europe and Brazil.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Paid Vacation

401(k) Company Match

Health Insurance

Dental Insurance

Life Insurance

Company News

Europe Says
Jul 24th, 2026
Project Finance Brief: Iberdrola Receives $160 Million for Wind and Solar Projects - Spain

Iberdrola, a Spanish multinational electric utility, received a €150 million (~$160 million) green loan agreement from the European Investment Bank to develop

PR Newswire
Jun 29th, 2026
Iberdrola picks ICEYE's SAR satellites to protect grid from extreme weather

Iberdrola has selected ICEYE to strengthen its electricity grid against extreme weather events using synthetic aperture radar satellite technology and near real-time data. The solution will help anticipate risks including floods, fires and strong winds, assess damage quickly and minimise impact on electricity supply. The initiative won a New-Tech Challenge within Iberdrola's PERSEO innovation programme, receiving over 40 proposals from ten countries. The 12-month pilot will launch in Spain, with ICEYE's Flood Solutions Suite providing forecasting, rapid impact assessment and flood insights. The deployment also includes wind damage assessment solutions for Iberdrola's assets in the United States and Australia. ICEYE's SAR technology can capture high-resolution imagery through smoke and storm clouds, enabling continuous monitoring in all weather conditions day or night.

World-Energy
Apr 2nd, 2026
Iberdrola Signs a Loan of 150 Million Euros With the Eib for Solar and Wind Energy in Italy - World-Energy

The loan will be used to build 400 MW of a portfolio of wind and photovoltaic projects in various locations in Italy. These will be Iberdrola’s first renewable plants in ItalyThe projects will make a significant contribution to Italy’s security of ene

Diari ARA
Apr 1st, 2026
Wallbox restructures $191.5M debt with Spanish banks as Catalan government takes stake

Wallbox, the Barcelona-based electric vehicle charging systems company, has closed a debt restructuring agreement worth €169.5 million with creditors representing over 83% of its financial debt. The deal includes a capital increase that will bring the Generalitat of Catalonia in as a shareholder. The agreement, pending judicial approval and scheduled for signing on 8 April, restructures existing debt into a €57.6 million framework loan and a €69.1 million bullet instrument, both maturing in December 2030. A working capital agreement of approximately €42.8 million was also reached. The restructuring includes a €10.65 million capital increase, with strategic shareholders contributing €5.65 million and the Generalitat adding €5 million. Participating banks will provide €12.5 million in new financing. CEO Enric Asunción said the agreement strengthens Wallbox's financial position.

Iberdrola
Mar 26th, 2026
ScottishPower secures £600m National Wealth Fund green financing for strategic UK subsea power link Eastern Green Link 4

ScottishPower, through its parent company Iberdrola, has secured £600 million in financing from the National Wealth Fund to support the development of the Eastern Green Link 4 project, a strategic electricity interconnector that will strengthen the UK's energy security and self-sufficiency, while helping to meet its