Full-Time

Systems Engineering Manager

Posted on 8/22/2025

Kairos Power

Kairos Power

501-1,000 employees

Designs, licenses, and demonstrates advanced reactors

Compensation Overview

$175k - $218.8k/yr

Remote in USA + 2 more

More locations: Albuquerque, NM, USA | Alameda, CA, USA

Hybrid

Category
Engineering Management (1)
Required Skills
Risk Management
Requirements
  • Bachelor’s or Master’s degree in Systems Engineering, Mechanical Engineering, Electrical Engineering, or a related design discipline
  • 6+ years of relevant engineering experience, at least 3 years in technical leadership or managerial role involving: Functional analysis, trade studies, requirement decomposition and allocation; Defining and documenting system interfaces and specifications, as well as developing and implementing structured engineering programs and processes; Leading systems engineering teams and cross-functional working groups
  • Demonstrated success in managing complex, multi-disciplinary projects in a regulated environment such as nuclear, aerospace, defense, or medical devices
  • Experience with safety-critical or mission-critical systems with an understanding of graded approaches to quality and the implication on requirements
  • Experience with configuration management
  • Travel up to 20%
  • Strong understanding of systems engineering principles, lifecycle models (e.g. V-model), and requirements management, and best practices
  • Proficiency in requirements definition, analysis, and traceability tools such as DOORS, Jama Connect
  • Demonstrated ability to mentor and lead engineering teams, fostering collaboration across diverse technical disciplines.
  • Skilled at translating complex technical challenges into actionable engineering workstreams.
  • Able to thrive in a fast-paced, dynamic engineering environment, managing shifting priorities and tight development timelines.
  • Excellent verbal and written communication skills with the ability to influence at all levels of the organization.
  • Passionate about promoting a culture of technical rigor, innovation, and continuous improvement.
  • Ability to work with highly collaborative team
  • Ability to solve problems quickly and efficiently
  • Prioritizes and ensures safety of one self and others
  • Ability to proactively collect, manage and transfer knowledge
  • Ability to seek different and novel ways to create efficiencies when working on problems, challenges and issues
Responsibilities
  • Provide technical leadership across system architecture, requirement development, and integration activities to ensure robust and traceable system designs
  • Drive the development and continuous improvement of system engineering process, tools, and standards to ensure consistent and high-quality outcomes
  • Coordinate the periodic review and update of design procedures, engineering processes, and technical guidelines to align with evolving project needs
  • Partner closely with Project Engineering and Project Management teams to support system development throughout the full project lifecycle—from concept and design through implementation, testing, and delivery
  • Lead verification and validation planning, ensuring that requirements are testable and fully integrated into product development workflows
  • Facilitate effective cross-functional collaboration, ensuring system-level thinking is embedded across engineering disciplines
  • Perform additional responsibilities as assigned
Desired Qualifications
  • Proficiency with MBSE tools and system architecture framework is preferred

Kairos Power designs, licenses, and demonstrates advanced nuclear reactors, headed by the KP-FHR which uses fluoride salt coolant and high operating temperatures to generate electricity. The system focuses on low water use and near-zero carbon emissions, pursuing an integrated path from design to regulatory licensing and demonstration to prove safety and economics. The company distinguishes itself by aiming to beat natural gas on cost and by a clear licensing/demo program coupled with environmental and grid-resilience performance. Its goal is to scale safe, affordable nuclear technology through government support, investments, licensing deals, and long-term service agreements to help decarbonize electricity.

Company Size

501-1,000

Company Stage

Grant

Total Funding

$20K

Headquarters

Alameda, California

Founded

2016

Simplify Jobs

Simplify's Take

What believers are saying

  • Google-TVA deal secures 50 MWe offtake for Hermes 2 by 2030.
  • DOE Nuclear Dominance program accelerates TRISO fuel supply by 2033.
  • BWXT partnership scales commercial TRISO production for deployments.

What critics are saying

  • Hermes 1 completion slips to 2029, delaying Hermes 2 operations.
  • TerraPower's 42-month Wyoming reactor steals Google data center contracts.
  • NRG PALLAS tests expose TRISO cracking, forcing NRC redesigns.

What makes Kairos Power unique

  • KP-FHR uses TRISO pebble fuel and Flibe salt coolant from Oak Ridge origins.
  • First NRC-permitted power-producing Gen IV reactor with Hermes 2.
  • Factory-built modules from Albuquerque campus enable modular SMR assembly.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Paid Vacation

401(k) Company Match

401(k) Retirement Plan

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

2%

2 year growth

1%
NucNet
Sep 3rd, 2025
Kairos And BWXT To Collaborate On Commercial Production Of Triso Nuclear Fuel

Kairos is developing Generation IV fluoride salt-cooled high-temperature reactor (KP-FHR) technology.

Chattanooga Times Free Press
Aug 18th, 2025
TVA, Google team up on advanced nuclear reactor project

Kairos Power will sell electricity to the Tennessee Valley Authority through an agreement announced Monday, and TVA will pass clean energy credits to its customer Google, which operates two data centers in the region.

Teknovation.biz
Jun 3rd, 2025
Ornl And Elementl Power Collaborate On A Data-Driven Approach For New Nuclear

Oak Ridge National Laboratory (ORNL) and Elementl Power have teamed up to advance a data-driven siting approach for advanced nuclear projects. The work started through a U.S. Department of Energy... The post ORNL and Elementl Power collaborate on a data-driven approach for new nuclear appeared first on Teknovation.biz.

Teknovation.biz
May 8th, 2025
Kairos Power Completes First Installation Of Nuclear Safety-Related Concrete For The Hermes Low-Power Demonstration Reactor

Kairos Power announced on Thursday that the company has completed the first installation of nuclear safety-related concrete for the Hermes Low-Power Demonstration Reactor, marking the start of “nuclear construction” on... The post Kairos Power completes first installation of nuclear safety-related concrete for the Hermes Low-Power Demonstration Reactor appeared first on Teknovation.biz.

NEI Magazine
Mar 28th, 2025
NRG PALLAS to test fuel for Kairos SMR

Netherlands research institute NRG PALLAS has signed a contract with US-based Kairos Power to assess materials and fuels that will be used in the small modular reactors (SMRs) Kairos is developing to power Google data centres.

INACTIVE