Full-Time

Senior Staff Quality Control Engineer

Quality Control

Updated on 9/4/2026

Crusoe

Crusoe

1,001-5,000 employees

Climate-aligned HPC powered by wasted energy

Compensation Overview

$165k - $195k/yr

+ Bonus + Restricted Stock Units

Abilene, TX, USA

In Person

Full-time on-site work is required, with travel to other construction sites as needed.

Category
Architecture & Civil Engineering (1)
Required Skills
CAD
Six Sigma

Get referred to Crusoe

See people who can refer or advise you

Requirements
  • At least 10 years of experience in construction quality assurance/quality control, quality engineering, field engineering, commissioning support, or related technical construction roles.
  • Deep technical understanding of mechanical, electrical, and plumbing systems in mission-critical, industrial, or large-scale infrastructure environments.
  • Strong experience with electrical distribution, mechanical and cooling systems, controls, system integration, and construction-to-commissioning handoff.
  • Proven ability to develop or improve Inspection Test Plans, inspection plans, quality standards, checklists, non-conformance report processes, punch management, and turnover documentation practices.
  • Strong ability to read and interpret drawings, specifications, technical submittals, test reports, commissioning documents, and code requirements.
  • Experience using defect tracking, trend analysis, root cause methodology, and corrective action frameworks to improve quality outcomes.
  • Ability to influence general contractors, subcontractors, engineering teams, commissioning teams, and internal stakeholders without relying on direct authority.
  • Strong field presence with the ability to identify installation risks, technical issues, and quality gaps before they become downstream failures.
  • Ability to understand how construction quality affects commissioning, operations, uptime, and long-term asset performance.
  • Ability to work on-site full-time.
  • Ability to travel to other construction sites as needed.
  • Ability to hold contractors and internal stakeholders accountable to quality standards, including escalation when necessary.
Responsibilities
  • Serve as a senior technical quality-control leader across large-scale, mission-critical data center construction projects.
  • Define and improve program-level quality engineering standards, inspection methods, and acceptance criteria.
  • Work across multiple tenant quality programs and reconcile differing specification and flow-down requirements.
  • Develop, refine, and govern Inspection Test Plans, checklists, inspection workflows, and quality documentation standards across civil, structural, electrical, mechanical, controls, and commissioning-related scopes.
  • Ensure critical mechanical, electrical, and plumbing systems, including electrical distribution, mechanical and cooling systems, controls, and related infrastructure, are installed according to design intent, specifications, submittals, code requirements, and performance expectations.
  • Partner with Construction, Design, Commissioning, Operations, general contractors, subcontractors, original equipment manufacturers, authorities having jurisdiction, and third-party inspectors to drive consistent quality outcomes.
  • Provide senior-level technical review of drawings, specifications, submittals, requests for information, field changes, and construction execution plans from a quality and constructability perspective.
  • Lead root cause analysis for recurring defects, non-conformances, rework drivers, and system-level quality failures.
  • Establish defect taxonomies, trend reporting, and quality metrics to provide visibility into systemic risk and performance across scopes or projects.
  • Drive pre-functional and functional readiness standards in partnership with commissioning teams.
  • Provide technical quality sign-off recommendations for systems prior to commissioning, energization, turnover, and operational handoff.
  • Review and validate non-conformance reports, corrective action plans, punch lists, inspection results, test reports, as-builts, redlines, operations and maintenance manuals, and turnover packages.
  • Identify quality risks early and influence corrective action before issues affect schedule, commissioning, cost, or reliability.
  • Translate field lessons learned into scalable standards, playbooks, and repeatable quality practices.
  • Mentor quality-control engineers, quality-control managers, construction teams, and trade partners on technical quality standards and inspection discipline.
  • Support audit readiness and maintain high-quality documentation and reporting standards across assigned projects or campus scopes.
Desired Qualifications
  • Data center or hyperscale experience with companies such as AWS, Meta, Google, Microsoft, or similar.
  • Experience in complex large-scale construction environments such as healthcare, semiconductor, refinery, central plants, power, or industrial infrastructure.
  • Experience working closely with commissioning teams on pre-functional, functional, and integrated systems testing.
  • Familiarity with Procore, BIM 360, Autodesk Build, Bluebeam, commissioning platforms, or similar construction and quality tools.
  • Relevant certifications such as CQM, CQI, PMP, Lean Six Sigma, ASQ, or similar.
  • Experience creating quality standards, inspection libraries, lessons-learned programs, or quality playbooks at scale.

Crusoe Energy Systems uses wasted, stranded, or clean energy sources to power high-performance computing and AI workloads. It turns otherwise unused energy into scalable computing resources and offers technical support to enterprises in AI and data-intensive fields. Unlike traditional data centers, Crusoe colocates infrastructure at energy sources to capture excess energy and convert it into computer power, reducing emissions. Its goal is to help the energy transition by providing climate-aligned, reliable computing while boosting resource efficiency.

Company Size

1,001-5,000

Company Stage

Series F

Total Funding

$18.7B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 3, 2026 funding delivered over $3 billion for expansion.
  • March 2026 Microsoft deal added 900 MW and lifted Abilene to 2.1 GW.
  • July 2026 Childress campus with Lancium added another 1.0 GW pipeline.

What critics are saying

  • Texas regulators rejected Crusoe's proportional curtailment plan on July 24, 2026.
  • TCEQ's Abilene gas-plant permit stayed open through September 2, 2026.
  • Google-linked gas power at Goodnight can trigger 4.5 million annual tons CO2.

What makes Crusoe unique

  • Crusoe combines AI data centers with behind-the-meter power and gas generation.
  • March 2026 Abilene expansion targeted Microsoft, alongside OpenAI and Oracle workloads.
  • September 2026 financing hit $30 billion, signaling rare hyperscaler-scale execution.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Industry competitive pay

Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents

Paid life insurance, short-term and long-term disability

Parental leave

Stock options in a fast-growing, well-funded technology company

Pet-friendly offices

Teladoc

401(k) with a 4% match

Unlimited time off

Cell phone reimbursement

Tuition reimbursement

Company paid commuter benefit; $100 per month

Calm

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-1%

2 year growth

1%
Bloomberg Law
Sep 3rd, 2026
Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation

Crusoe, a cloud-computing provider and data center developer doing business with OpenAI, Microsoft Corp. and Meta Platforms Inc., has raised over $3 billion in a funding round that values the startup at roughly $30 billion, according to people familiar with the situation.

Yahoo Finance
Jul 31st, 2026
Crusoe plans $1B expansion of Google-linked Texas data centre with two new buildings

Crusoe has registered two additional data-centre buildings at its Goodnight campus near Claude, Texas, with estimated construction costs totalling $1 billion, according to state filings. The buildings would add approximately 1.61 million square feet to the Armstrong County development, also known as Project Llano. Each single-storey structure is planned at roughly 805,380 square feet, with multiple data halls, office space and support areas. Public reporting has linked Google to the campus development through intermediary Ensign Infrastructure. Building 3 is scheduled for completion on 1 August, whilst Building 4 has a March 2027 completion date. Power plans include grid-supplied electricity and potential on-site generation, with a natural-gas plant proposal for up to 933 MW capacity. Separately, Crusoe announced a partnership with Aalo Atomics to examine modular nuclear generation for future data centres.

Yahoo Finance
Jul 21st, 2026
Crusoe and ON.energy to deploy 5GW of AI UPS™ across multiple hyperscale campuses

Crusoe and ON.energy have announced a partnership to deploy 5 gigawatts of AI UPS™ technology across multiple hyperscale campuses, with commissioning starting in 2026 and continuing into 2027. AI data centres create unprecedented grid challenges. During training, thousands of GPUs ramp up and down in synchronised bursts, causing power demand fluctuations hundreds to thousands of times daily. These load swings can propagate through interconnection points into transmission systems. ON.energy's patented AI UPS™ is a medium-voltage uninterruptible power system that sits between power sources and data centres. It decouples facilities from the grid, protecting equipment during voltage faults whilst preventing GPU load swings from affecting the grid. The technology has been validated against ERCOT's Large Load Interconnection requirements, meeting grid stability and voltage ride-through standards.

Associated Press
Jul 15th, 2026
Crusoe and Lancium to build 1GW AI data centre campus in Texas

Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas. The grid-connected facility will span 270 acres owned by Lancium, which will develop and manage the site's energy infrastructure, whilst Crusoe will design, build and operate the data centre. Construction is expected to begin in the third quarter of 2026, creating thousands of construction jobs and over 100 permanent positions. The campus will support deployment of hundreds of thousands of advanced AI accelerators for training or inference. This marks the second site using the same partnership structure between the companies, following their collaboration in Abilene. The development will feature closed-loop, non-evaporative liquid cooling systems and behind-the-metre solar and energy storage resources.

Associated Press
Jul 7th, 2026
Crusoe launches serverless fine-tuning and self-serve inference for open AI models

Crusoe, an AI infrastructure company, has launched Serverless Fine-Tuning and Self-Serve Deployments in its Crusoe Intelligence Foundry platform. The new capabilities allow data scientists and ML engineers to customise open-source AI models with proprietary data and deploy them to production without managing infrastructure. Serverless Fine-Tuning enables teams to launch fine-tuning jobs through a simple interface, selecting from curated open-weight models and uploading custom datasets. Jobs run on distributed AI-optimised infrastructure with automated recovery. Completed model weights are provided in portable format and can be deployed immediately or downloaded for external use. Self-Serve Deployments offer production-grade inference on NVIDIA H100 or H200 GPUs, billed per GPU hour. Teams can deploy models directly from fine-tuning workflows or select base models optimised for throughput or responsiveness. Both features will be generally available next week.