Full-Time

Lead Engineer

Electrical Component

GE Vernova

GE Vernova

1,001-5,000 employees

Global energy provider: power, wind, electrification

No salary listed

Pallavaram, Chennai, Tamil Nadu, India + 2 more

More locations: Kolkata, West Bengal, India | Noida, Uttar Pradesh, India

In Person

Relocation assistance is provided; global travel is required.

Bachelor's

Category
Electrical Engineering (1)

Get referred to GE Vernova

See people who can refer or advise you

Requirements
  • A Bachelor's degree in electrical engineering or a related field from an accredited college or university.
  • A minimum of 8+ years of experience in EHV/HV substation design.
  • Good understanding of power system components, including transformers, switchgear, and protection systems, and renewable energy integration.
  • Excellent communication skills and the ability to explain complex technical concepts to technical and non-technical stakeholders.
  • Strong analytical and problem-solving skills, with the ability to balance technical requirements and business needs.
  • Ability to work collaboratively across teams and with clients.
  • Knowledge of IEEE and IEC codes, safety in design and EHS aspects, and AC substation industry engineering practices.
  • Ability to travel globally.
Responsibilities
  • Support sales and business development by providing technical expertise in designing electrification solutions for EHV/HV substations.
  • Perform system design, material selection, quantity estimation, and project engineering activities, and provide customer technical consultations.
  • Ensure proposed solutions meet customer needs and comply with industry standards, safety regulations, quality requirements, and cost-efficiency objectives.
  • Execute assigned objectives in association with applicable workgroups and make decisions within defined parameters for moderately complex issues.
  • Coordinate with the GSI Global Engineering Centre, regions, and business lines according to project requirements.
  • Develop HV primary designs for 132 kV and above GIS/AIS substation engineering for grid-interconnected projects.
  • Prepare basic single-line diagrams, layout plans and sections for the overall plant, equipment control room, earthing, DSLP, and trench layouts.
  • Perform earthing design, lightning design, cable sizing, battery sizing, illumination system design, sag-tension calculations, short-circuit force calculations, and busbar sizing according to IEEE and IEC standards.
  • Select and size project equipment according to IEEE and IEC standards.
  • Prepare distribution and auxiliary systems.
  • Evaluate vendor drawings, GTPs, calculations, and technical specifications.
  • Perform LV/MV engineering for collector substations, unit substations, and pooling stations.
  • Prepare ITO tender drawings, estimate bills of quantities, finalize requests for quotation, evaluate components, and select equipment using cost-effective pricing options.
  • Coordinate and integrate with automation, civil, and MEP teams.
  • Coordinate site and office teams for project execution.
  • Stay current with global developments in renewable technologies and adopt relevant developments.
  • Lead projects independently and handle clients.
  • Handle and develop teams.
  • Manage multiple tasks, meet deadlines, and provide leadership throughout design and implementation phases.
  • Translate customer needs into practical, cost-effective, and standards-compliant technical solutions.
  • Deliver designs that meet industry-specific safety and regulatory standards.
Desired Qualifications
  • Experience engineering FACTS projects involving STATCOM, FSC, or synchronous condensers.
  • Experience with HVDC/FACTS integrated project applications.
  • Competency with specialized tools such as CANECO, ETAP, CDGES, or equivalent.
  • Working experience with 3D design tools.

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders rose 88% to $24.2 billion, led by Power and Electrification.
  • Backlog hit $176 billion in July 2026, with gas equipment expected to reach 125 GW.
  • August 2026 JV with LS Electric expands GE Vernova in Korea's HVDC market.

What critics are saying

  • Vineyard Wind sued GE Vernova in April 2026; blade failures damaged offshore credibility.
  • Wind execution remains fragile after the 2024 blade break and court-ordered project continuation.
  • If gas-turbine production slips below 20 GW in 2026, backlog monetization stalls.

What makes GE Vernova unique

  • GE Vernova controls Power, Wind, and Electrification across generation and grids worldwide.
  • Its gas turbine backlog reached 116 GW in Q2 2026, supporting long-duration demand.
  • GridOS, HVDC, and gas turbines position GE Vernova for AI-driven electrification buildouts.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Sep 10th, 2026
Big Tech burns $13.5B as AI buildout sends Treasury yields to 4.79%

US Treasury yields near 4.79% reflect strong corporate borrowing for AI investments rather than economic weakness, according to analysts Joel Litman and Rob Spivey. They argue that context matters more than absolute rate levels. Companies borrowing at 5% to fund projects returning 30-40% benefit from current rates, whilst those earning less than borrowing costs face pressure. The analysts note that AI-related corporate debt issuance reached roughly $1.5 trillion this year, driving yields higher. Alphabet posted its first negative free cash flow since 2004, burning $5.9 billion in Q2 as capital expenditure hit $44.9 billion. Amazon swung to negative $7.6 billion on a trailing basis. However, negative cash flow can signal productive investment rather than distress, the analysts suggest.

Yahoo Finance
Sep 4th, 2026
GE Vernova and Quanta Services poised to weather market crash with strong backlogs and AI-driven growth

GE Vernova and Quanta Services are positioned as resilient stocks that could withstand market volatility, according to a new analysis. Both companies are benefiting from surging demand for electrical infrastructure driven by AI and data centre expansion. GE Vernova, spun off from General Electric in 2024, has seen its stock rise more than sixfold since debut. The company's backlog expanded 37% year over year to $176.3 billion at the end of Q2 2026, nearly four times its projected annual revenue of $46.2 billion. Quanta Services, an energy infrastructure builder, reported a backlog of $53.4 billion in Q2 2026, up 49% year over year. The company's revenue is projected to grow 39% in 2026. Analysts expect GE Vernova's revenue and adjusted EBITDA to grow at compound annual growth rates of 17% and 60% respectively from 2025 to 2028.

Fortune
Sep 1st, 2026
GE Vernova hires Rivian CFO Claire McDonough, leaving EV maker without clear successor

GE Vernova has hired Claire McDonough as CFO, effective 1 January, leaving electric vehicle maker Rivian to find her successor. McDonough joined Rivian in January 2021 and helped take the company public through a $13.7 billion IPO that November. She also negotiated Rivian's technology joint venture with Volkswagen, which agreed to invest up to $5.8 billion. Rivian shares fell more than 6% following the announcement, whilst GE Vernova shares declined about 3%. Analysts cited Rivian's lack of a clear succession plan as a factor weighing on its shares. Derek Mulvey, Rivian's VP of finance, is expected to serve as interim CFO after McDonough's departure. McDonough will join GE Vernova in November, succeeding Kenneth Parks, who is retiring.

Yahoo Finance
Aug 31st, 2026
SpaceX builds turbine foundry to break AI power bottleneck, cut GE Vernova wait times by 18 months

Elon Musk's SpaceX is building a foundry in Bastrop, Texas, to manufacture blades and vanes for industrial gas turbines, according to The Information. Musk confirmed the move on X, saying in-house casting could accelerate natural gas turbines coming online by up to 18 months. The initiative targets the same supply chain bottleneck GE Vernova has flagged to investors. GE Vernova CEO Scott Strazik said the company pushed suppliers to add capacity in 2024, sometimes providing capital for new furnaces. GE is mostly sold out through 2030 and aims to increase annual turbine production from 20 gigawatts this year to 30 GW by decade's end. SpaceX has committed over $2.8 billion to gas turbines over three years to support its Colossus data centres near Memphis. The move addresses growing power demand from AI infrastructure expansion.

Yahoo Finance
Aug 29th, 2026
GE Vernova and LS Electric form JV to target South Korea's HVDC market

GE Vernova has formed a joint venture with LS Electric to strengthen its position in the high-voltage direct current sector. Announced at the CIGRE 2026 event in Paris, the partnership will focus on South Korea's voltage source converter-based HVDC projects, which are crucial for transmitting renewable energy from the southwestern region to greater Seoul. The venture combines GE Vernova's VSC-HVDC technology with LS Electric's local capabilities and market presence. The companies also plan to pursue HVDC opportunities in other global markets. The move aligns with GE Vernova's strategy to capitalise on growing power infrastructure demand. During Q2, the company's Power orders jumped 135% year-over-year, whilst Electrification revenue grew 68%. However, the joint venture faces execution risks and may take time to generate meaningful revenue.