Full-Time

Specialist

Commissioning & Start-Up, Electrical

Venture Global LNG

Venture Global LNG

501-1,000 employees

Develops and operates LNG export facilities

No salary listed

Houston, TX, USA + 1 more

More locations: Lake Charles, LA, USA

In Person

Initial assignment in Houston, TX; eventual transition to Cameron, LA; on-site required.

Category
Electrical Engineering (2)
,
Requirements
  • Bachelor’s degree in Electrical from a University or Technical School, and/or job related experience and minimum of 10 years field execution experience
  • Minimum 10-15 years of experience in LNG/Gas Process/Refinery/Petrochemical Industries and Power Plant maintenance and operations
  • Minimum 10 years of electrical experience in supervisor roles and/or specialization
  • Minimum 5 years of experience as Electrical Lead on mid to large scale project
  • Working knowledge and experience with various control systems including PLCs, HMI, Relays, DCS Systems, & EMS System
  • Familiarity with Control and Electrical systems as well as Ethernet network configurations and topology
  • MS Office Suite
  • EPC experience
  • Recent knowledge of engineering methods and possesses a technical knowledge of the detail design engineering process and electrical controls systems
  • Must have knowledge of field-testing requirements and equipment to perform the testing
  • Experienced with domestic and/or International electrical codes and standards, including NEC, NFPA, NETA, and ANSI
Responsibilities
  • Responsible for the planning and implementation of the EMS on site including coordination, commissioning plans, testing, and signoff of all completed SAT reports
  • Willingness to develop technical knowledge and expertise on GE Power Conversion EMS System
  • Communicate clearly and promptly up, down and across
  • Communicate effectively to manage expectations and build relationships
  • Strong planning skills a distinct plus with the ability to adapt to changing site priorities as needed
  • Strong record keeping and coordination skills – drives discipline with EPC in this area
  • Site single point contact for liaison/interface between OFE (and OFE Vendors) and EPC site commissioning team; Site operations and maintenance teams
  • Participate as electrical in Pre-Start-Up Safety Reviews (PSSR)
  • Represent electrical commissioning in project punch listing activities
  • Implementation of SIMOPs
  • Assurance and audit of electrical test plans and commissioning procedures
  • Lead and require strict adherence to Lock Out / Tag Out Procedures (LOTO), work permits, and company policies
  • Review and spot check Job Hazard Analysis (JHA) audits for department
  • Review scope packages and validate necessary forms for completed turnover package
  • Review test procedures for component and system testing
  • Perform project document reviews
  • Support site Change Management for electrical discipline
  • Checkout installed systems and equipment adhering to OEM requirements, system descriptions, and good industry standard practice

Venture Global LNG develops, owns, and operates large-scale LNG export facilities in North America to liquefy natural gas and ship it globally. It sells LNG under long-term contracts to utilities, energy companies, and industrial users, providing a stable revenue stream. LNG is produced by cooling natural gas to a liquid for easier storage and transport, with shipments routed from Calcasieu Pass, Plaquemines LNG, and Delta LNG. The company differentiates itself through scaled, low-cost production at strategically located terminals, aiming to offer reliable, cleaner energy at lower prices with a focus on efficiency and consistent supply to global customers.

Company Size

501-1,000

Company Stage

Debt Financing

Total Funding

$2.6B

Headquarters

Arlington, Virginia

Founded

2013

Simplify Jobs

Simplify's Take

What believers are saying

  • FERC approved $10B CP2 project May 23, 2025, adding 28 MTPA capacity.
  • Secured 20-year contracts: 0.7 MTPA Excelerate February 28, 1.0 MTPA China Gas February 23.
  • Closed $3B perpetual preferred stock offering for expansion funding.

What critics are saying

  • $6B arbitration claims consume two years cash flow, force asset sales.
  • CP2 faces environmental litigation delaying beyond 2027, stranding $5B capital.
  • Calcasieu Pass equipment failures cut capacity below 16.5 MTPA, sparking disputes.

What makes Venture Global LNG unique

  • Plaquemines LNG achieved historic first LNG production recently.
  • CP2 LNG integrates CCS capturing 500,000 tons CO2 annually.
  • Develops four Louisiana facilities: Calcasieu Pass, Plaquemines, Delta, CP2.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Venture Global LNG who can refer or advise you

Benefits

Health Insurance

Paid Vacation

Flexible Work Hours

Company News

PR Newswire
Dec 14th, 2024
Venture Global's Plaquemines LNG Achieves Historic First LNG Production

Venture Global is developing Carbon Capture and Sequestration (CCS) projects at each of its LNG facilities.

Insurance Journal
Nov 22nd, 2024
Arbitration Claims Against LNG Exporter Venture Global Reach Close to $6 Billion

Venture Global has considered plans to file for an initial public offering, which could raise more than $3 billion.

Offshore Technology
Nov 21st, 2024
Pending arbitration claims against Venture Global LNG grow to $6bn -report

Last week, Reuters reported that Venture Global LNG is planning to raise approximately $3bn through an initial public offering (IPO) in New York.

Rigzone
Nov 21st, 2024
Arbitration Claims Against LNG Exporter Reach Close to $6B

Venture Global has considered plans to file for an initial public offering, which could raise more than $3 billion.

Offshore Technology
Nov 14th, 2024
Venture Global LNG targets $3bn in US IPO

Venture Global LNG is planning to raise approximately $3bn through an initial public offering (IPO) in New York, a move that could materialise this year, reported Reuters, citing sources familiar with the matter.