Full-Time

Automation Engineer

Posted on 5/9/2026

Vopak

Vopak

1,001-5,000 employees

Global tank storage and logistics provider

No salary listed

No H1B Sponsorship

Corpus Christi, TX, USA + 1 more

More locations: La Porte, TX, USA

In Person

On-site at Deer Park, TX; travel up to 20% mainly to Corpus Christi, TX.

Category
Electrical Engineering (1)
Requirements
  • Must possess or be able to obtain a TWIC (Transportation Worker Identification Credential) as required by the Maritime Transportation Security Act.
  • 4-year college degree in engineering from an accredited university.
  • 6-8 years of experience in automation, instrumentation, and process controls in the petrochemical, refining, or oil & gas industries, with liquid storage terminal experience being a plus.
  • Experience with Emerson DeltaV Distributed Control System, Safety Instrumented System and Rockwell PLCs hardware and software; Wonderware experience is a plus.
  • Experience with construction, installation, testing and commissioning of control systems.
  • Knowledge of Industrial Automation standards including ISA 88, ISA 95 and IEC 61511, and relevant codes such as the National Electrical Code.
  • Familiarity with major Tank Gauging Systems and associated industry standards is preferred.
  • Affinity with Information Technology and Operations Technology convergence and OT cybersecurity principles.
  • Experience working in safety-critical industrial environments and a strong understanding of health, safety, environmental, and security principles.
  • Knowledge of planning and scheduling processes and general project management processes.
  • Ability to translate technical plans into easy-to-understand layman’s terms and communicate such translations in clear terminology.
  • Ability to manage a complex stakeholder environment.
  • Excellent English communication skills, both oral and written; listening skills; experience creating and delivering presentations.
  • Willingness to travel up to 20 percent (travel will mainly be to Vopak terminal in Corpus Christi, Texas).
  • Ability to respond promptly to emergencies or unexpected calls during off-hours, including nights and weekends.
Responsibilities
  • Abides by all safety procedures and practices applicable to location and position; participates in appropriate safety training; demonstrates commitment to and support of safety, health, and environmental principles; champions safety as necessary.
  • Provides subject matter expertise for automation/control systems and instrumentation, and supports the project team with assigned upgrades, migrations and other automation projects.
  • Coordinates all automation technical and engineering matters between the terminal and customer, technical and/or engineering personnel or other stakeholders.
  • Responsible for maintenance and lifecycle management of automation/control systems at the terminals; ensures service level agreements with appropriate technical requirements are in place for automation/control systems and ensures vendors deliver services in line with the scope and quality requirements established in SLAs.
  • Responsible for configuration, monitoring, troubleshooting, programming, and hardware/software support of control systems at the terminals.
  • Help develop/prepare Control System Block Diagrams/System Architecture, Network Diagrams, I/O Lists, Junction Box wiring drawings, plot plans, Instrument Index, Instrument Data Sheets, Range/Alarm/Trip/Shutdown Schedules, Control Narratives, Cause & Effect Matrix, DCS/HMI Screens, Complex Loop Narratives and Hardware/Software/Configuration guides.
  • Participate in HAZOP/PHA activities and provide I&C input to achieve required Layers of Protection.
  • As part of the technical team, conduct regular meetings with operations and maintenance to ensure that automation/I&C design work and changes are aligned with the specific needs of terminal operations and are in compliance with company and industrial standards.
  • Support P&ID development for I&C scope; maintain P&ID redlining and updates through the course of the initial project, as well as all future projects.
  • Prepare control systems scope, specifications, requisitions, proposals, estimates, surveys and designs.
  • Pre-select and pre-qualify vendors, obtain bids, evaluate bids and support the procurement process to award contracts for the applicable projects.
  • Review project documents and vendor drawings, specifications, design documents, loop/wiring drawings and test procedures, and ensure that the control system design and installation are consistent with company standards.
  • Support preparation of project scope, justification, cost estimates and return on investment evaluations, and obtaining required expenditure approvals for implementation of the planned project stages.
  • Manage and monitor vendors’ progress throughout the life of the project to ensure facility standards, project scope and schedule are met.
  • Prepare and deliver technical and management support presentations and reports as required.
Desired Qualifications
  • Advanced degree in technical or business field preferred.
  • Liquid storage terminal experience is a plus.
  • Wonderware experience is a plus.
  • Familiarity with Tank Gauging Systems and related industry standards is preferred.
  • Knowledge of business activities and processes in terminal operations is preferred.

Vopak stores bulk liquids for customers around the world. It operates large terminal networks where liquids like oil, chemicals, and gases are kept safely and in good condition between producers and users. The product is essentially storage capacity and related logistics services that clients lease under long-term contracts, with Vopak earning fees for operating and maintaining the terminals. The company differentiates itself by its extensive, strategically located global network of terminals and its focus on safety, environmental standards, and reliable custody of customers’ products. Its goal is to provide secure, efficient, and transparent storage and logistics services for bulk liquids to support global energy, chemical, and gas supply chains.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Rotterdam, Netherlands

Founded

1999

Simplify Jobs

Simplify's Take

What believers are saying

  • NT government's November 2024 not-to-deal commitment accelerates Darwin CO2 terminal to 2030s.
  • EUR 560 million debt issuance April 2025 funds energy transition expansions like Tokyo office.
  • 300MW Dutch battery project from BayWa r.e. establishes Vopak's European energy storage foothold.

What critics are saying

  • Japanese incumbents Mitsubishi and Mitsui erode Vopak's Tokyo ammonia market share by 2028.
  • Dutch grid congestion delays GES Oosterhout battery project, inflating costs by 2027.
  • Australian regulators reject Darwin CO2 terminal, wasting AUD 50 million by 2028.

What makes Vopak unique

  • Vopak pioneers common-user liquid CO2 import terminal in Darwin via NT MoU July 2024.
  • Vopak expands into battery storage acquiring GES majority stake for 200MW Oosterhout project.
  • Vopak develops ammonia storage and cracking at Antwerp Energy Park post-2023 refinery buy.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Vopak who can refer or advise you

Benefits

Health Insurance

Parental Leave

Wellness Program

Flexible Work Hours

Paid Vacation

Company News

List Solar
May 21st, 2025
BayWa r.e. Transfers 300-MW Dutch Battery Storage Project to Vopak

BayWa r.e. has sold a ready-to-build 300-MW battery project in northern Netherlands to Vopak, handing the tank-storage giant its first large-scale foothold in Europe's energy-storage market.

MarketScreener
Apr 11th, 2025
Vopak signs agreements for a new debt issuance of around EUR 560 million equivalent

Vopak signs agreements for a new debt issuance of around EUR 560 million equivalentRotterdam, the Netherlands, 11th April 2025Royal Vopak announces the signing of Note Purchase Agreements for a debt...

Startup Rise EU
Mar 10th, 2025
Xycle secures funding for recycling plant.

Xycle has secured funding from investors including Dow, ING, Invest-NL, Vopak, and Polestar Capital to build its first commercial-scale chemical recycling plant in Rotterdam. The facility will process 21,000 metric tons of plastic waste annually, converting it into pyrolysis oil for new plastic production. The plant is expected to be operational by Q4 2026, with plans to expand globally. The funding amount was not disclosed.

Quantum Commodity Intelligence
Oct 30th, 2024
Vopak looking at ammonia storage and cracking in Antwerp

Vopak said Thursday that it has launched a market consultation for ammonia storage at its Vopak Energy Park Antwerp site...

Renewables Now
Oct 28th, 2024
Vopak to gauge market interest in ammonia storage at Antwerp site

Vopak acquired the former refinery site in 2023 and is discussing the development of a new green energy hub with the Port of Antwerp Bruges.