Full-Time

Production Engineer

Venture Global LNG

Venture Global LNG

501-1,000 employees

Develops and operates LNG export facilities

No salary listed

Lake Charles, LA, USA

In Person

Must be willing to travel to various sites.

Category
Process Engineering
Requirements
  • Bachelor’s degree in Chemical/Process, Production Engineering
  • Minimum 3 years’ experience working as a Production Engineer with a demonstrated track record of Production performance improvement
  • Oil and Gas experience is required, with strong preference in LNG, however, petrochemical, NGL, cryogenic natural gas processing, or other hydrocarbon processing experience may be acceptable
  • This position will be located in Cameron, LA with travel to various sites, as needed
Responsibilities
  • Set CP Facility LNG Trains Production daily targets, define operating limits and engage with Operations, Maintenance and Engineering to develop the Production Plan for the day
  • Build and maintain Real time, online, surveillance and monitoring models to optimize the Availability and Performance of the CP Facility LNG Liquefaction Trains
  • Perform Analysis to detect deviations from Live Operating Envelope Limits and identify the actions required to safely and reliably maximize LNG rundown
  • Identify short-, medium- and long-term Availability and Reliability improvement initiatives to maximize LNG rundown using insights from Real time System and Physics-based/data-driven models
  • Identify Production risks that could impact Availability and Reliability and develop mitigation plans to address them
  • Provide input to the weekly and monthly Production reviews and follow up on any actions required to improve the performance of the CP Facility LNG Trains
  • Identify the CP Facility LNG Trains production loss events and engage with the relevant stakeholders to review, validate, report and manage production losses in a timely manner to maximize Availability and Reliability
  • Lead or be part of EIRs (Engineering Investigation Requests) and MoCs (Management of Change) required to improve the CP Facility LNG Trains performance
  • Lead or be part of the CP Facility LNG Trains Production loss RCAs when required
  • Gather the required assumptions on LNG Trains performance and provide timely input to the Forecast and Annual Delivery Plan process
  • Support the Long-Term Service Agreement (LTSA) process and provide all the required input and analysis as required
  • Support the development of Integrated Production Excellence standards and procedures
  • Capture Lessons Learned from the CP Facility and provide input to other Venture Global LNG projects / sites as required

Venture Global LNG develops, owns, and operates large-scale LNG export facilities in North America to liquefy natural gas and ship it globally. It sells LNG under long-term contracts to utilities, energy companies, and industrial users, providing a stable revenue stream. LNG is produced by cooling natural gas to a liquid for easier storage and transport, with shipments routed from Calcasieu Pass, Plaquemines LNG, and Delta LNG. The company differentiates itself through scaled, low-cost production at strategically located terminals, aiming to offer reliable, cleaner energy at lower prices with a focus on efficiency and consistent supply to global customers.

Company Size

501-1,000

Company Stage

Debt Financing

Total Funding

$2.6B

Headquarters

Arlington, Virginia

Founded

2013

Simplify Jobs

Simplify's Take

What believers are saying

  • FERC approved $10B CP2 project May 23, 2025, adding 28 MTPA capacity.
  • Secured 20-year contracts: 0.7 MTPA Excelerate February 28, 1.0 MTPA China Gas February 23.
  • Closed $3B perpetual preferred stock offering for expansion funding.

What critics are saying

  • $6B arbitration claims consume two years cash flow, force asset sales.
  • CP2 faces environmental litigation delaying beyond 2027, stranding $5B capital.
  • Calcasieu Pass equipment failures cut capacity below 16.5 MTPA, sparking disputes.

What makes Venture Global LNG unique

  • Plaquemines LNG achieved historic first LNG production recently.
  • CP2 LNG integrates CCS capturing 500,000 tons CO2 annually.
  • Develops four Louisiana facilities: Calcasieu Pass, Plaquemines, Delta, CP2.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Venture Global LNG who can refer or advise you

Benefits

Health Insurance

Paid Vacation

Flexible Work Hours

Company News

PR Newswire
Dec 14th, 2024
Venture Global's Plaquemines LNG Achieves Historic First LNG Production

Venture Global is developing Carbon Capture and Sequestration (CCS) projects at each of its LNG facilities.

Insurance Journal
Nov 22nd, 2024
Arbitration Claims Against LNG Exporter Venture Global Reach Close to $6 Billion

Venture Global has considered plans to file for an initial public offering, which could raise more than $3 billion.

Offshore Technology
Nov 21st, 2024
Pending arbitration claims against Venture Global LNG grow to $6bn -report

Last week, Reuters reported that Venture Global LNG is planning to raise approximately $3bn through an initial public offering (IPO) in New York.

Rigzone
Nov 21st, 2024
Arbitration Claims Against LNG Exporter Reach Close to $6B

Venture Global has considered plans to file for an initial public offering, which could raise more than $3 billion.

Offshore Technology
Nov 14th, 2024
Venture Global LNG targets $3bn in US IPO

Venture Global LNG is planning to raise approximately $3bn through an initial public offering (IPO) in New York, a move that could materialise this year, reported Reuters, citing sources familiar with the matter.