Full-Time

Senior Controls Engineer

Posted on 7/23/2025

Arcadis

Arcadis

10,001+ employees

Global design, engineering, consultancy for assets

Compensation Overview

$89k - $134k/yr

Toronto, ON, Canada

In Person

Category
Electrical Engineering (1)
Requirements
  • Bachelor’s degree in electrical engineering, computer engineering, or a related field
  • 10+ years of experience in building management systems, energy management systems, IoT, SCADA and other intelligent building systems service or integration with at least 5 years in mission-critical environments such as data centers or advanced manufacturing
  • Strong ControlLogix and CompactLogix programming experience developing applications from scratch for complex processes
  • Design and programming experience with Siemens S7/PCS 7 and WinCC/TIA
  • Design and programming experience with AVEVA System Platform, Historian (OSI PI), Batch, and InTouch
  • Experience designing, configuring, programming, installing, troubleshooting or servicing HVAC Controls or Electrical SCADA systems application specific controllers, software and networks
  • Experience in configuring, programming and troubleshooting Trend, Niagara N4, Distech, Schneider, Ignition
  • Expertise in BMS and EPMS software platforms (Inductive Automation, Schneider Electric Power Monitoring Expert, Eaton Foreseer, Siemens EPMS, etc.)
Responsibilities
  • Design and implement controls systems for mission-critical facilities, ensuring high reliability and performance
  • Develop real-time monitoring and analytics solutions to track power usage, energy efficiency, and system reliability
  • Configure and integrate EPMS with SCADA, Building Management Systems (BMS), and Electrical Infrastructure for seamless operation
  • Program and troubleshoot SCADA software and hardware components, including power meters, gateways, and data acquisition devices
  • Define network architecture for SCADA, BMS, EPMS, ensuring compliance with cybersecurity best practices
  • Collaborate with mechanical engineers, electrical engineers, controls engineers, IT teams, and commissioning specialists to ensure SCADA and BMS/EPMS functionality aligns with project requirements
  • Develop custom dashboards, alarms, and reporting tools to enhance operational visibility
  • Manage vendor relationships and oversee system deployment, commissioning, and validation
  • Provide technical support and training to end users on SCADA, BMS and EPMS operation and maintenance
  • Stay current with emerging technologies in SCADA, building automation and power monitoring, IoT, and AI-driven analytics to enhance system capabilities
Desired Qualifications
  • A champion of organization and details, who thrives on providing the highest quality of work
  • Deadline driven, self-motivated, and with a high degree of technical curiosity and savvy
  • Able to follow processes and drive consistency with the team
  • Work with a team and independently as required
  • Flexible and creative when faced with technical challenges, schedule changes, and conflicting priorities
  • An ideal candidate would have the technical know-how to get the job done, a willingness to learn new emerging technology, and personality to make every customer an evangelist of Arcadis Digital X.

Arcadis is a global design, engineering, and consultancy firm that creates and manages natural and built assets. It operates across the Americas, Europe, the Middle East, and the Asia Pacific, serving governments, public agencies, and private companies. Its four business areas—Places, Mobility, Resilience, and Intelligence—cover sustainable buildings and urban development, transportation infrastructure, climate adaptation, and data-driven digital solutions to optimize asset performance. The company earns fees for its integrated services that combine planning, design, engineering, and advisory work. Arcadis differentiates itself through its global reach and its integrated, multi-disciplinary approach that links physical design with data analytics and digital insights to deliver high-value solutions. Its goal is to help clients create and maintain sustainable, resilient, and efficient assets while improving decision-making and performance across complex projects.

Company Size

10,001+

Company Stage

IPO

Headquarters

Watermael-Boitsfort, Belgium

Founded

1888

Simplify Jobs

Simplify's Take

What believers are saying

  • MCBC-Arcadis Partnership unlocks infrastructure projects across Greater Toronto's 10 million population.
  • £100M Network Rail contract strengthens UK rail leadership through 2031.
  • $18M LA contracts expand US project management in convention and clean water programs.

What critics are saying

  • WSP underbids Arcadis on UK rail like HS2, capturing market share within 12 months.
  • AtkinsRéalis dominates Transpennine JV, marginalizing Arcadis role in 6 months.
  • EU Green Deal Phase 2 slashes Resilience margins 20-30% on water contracts by 2027.

What makes Arcadis unique

  • Arcadis integrates Indigenous knowledge via MCBC partnership on 3.9 million acres Toronto Treaty Lands.
  • Arcadis pioneers Maryland's first Managed Aquifer Recharge using digital twins by 2028.
  • Arcadis delivers data-driven program controls for £10.7B Transpennine Route Upgrade JV.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Hybrid Work Options

Company News

Yahoo Finance
Mar 27th, 2026
Arcadis nominates National Grid executive Carl Trowell to supervisory board

Arcadis has nominated Carl Trowell for appointment to its supervisory board for a four-year term, subject to approval at the Annual General Meeting on 20 May 2026. Trowell currently serves as president of Strategic Infrastructure at National Grid, where he leads a multi-billion pound portfolio of UK electricity transmission projects and oversees global supply chain and construction functions. His career includes leadership roles at Acteon Group, ENSCO and 17 years at Schlumberger, with international experience across the UK, Netherlands, Norway, France and Malaysia. Upon appointment, Trowell will join the audit and risk committee and the sustainability committee. The announcement comes as chair Michiel Lap retires after 11 years, with Peter de Wit succeeding him. Deanna Goodwin will also retire from the board.

Canadian Consulting Engineer
Mar 24th, 2026
Arcadis to design four-tower development in Ottawa.

Arcadis to design four-tower development in Ottawa. March 24, 2026 By Peter Saunders Turn Group has selected Arcadis as lead consultant and architect for its development at 299 Carling Avenue in west-end Ottawa's Little Italy neighbourhood. The transit-oriented project will replace a parking lot with 750 residential units and 600,000 sf of mixed-use space. Formerly owned by Canada Lands Company, the site will be redeveloped with four towers, ranging from 13 to 30 storeys. It is near the O-Train light-rail transit (LRT) system, the Central Business District and Dow's Lake. The plan calls for pedestrian-friendly pathways. Arcadis will oversee all design deliverables, including architecture, interior design, building information modelling (BIM), landscape architecture, civil engineering, traffic and planning services. "This project represents what our integrated cross-country design teams can deliver," says Scott Arbuckle, the firm's country director for Canada. "From client engagement and advisory services to architectural design and civil engineering, our teams are committed to shaping a development that is functional, sustainable and attuned to Ottawa's urban fabric and character." "This project will contribute to a mixed-use neighbourhood that is both cohesive and community-focused," adds Jan Steingahs, manager of Arcadis' living practice group. Stories continue below

Kahnawà:ke
Mar 16th, 2026
MCK pursues next steps on toll project with feasibility study.

MCK pursues next steps on toll project with feasibility study. The Mohawk Council of Kahnawà:ke (MCK) wishes to inform the community that it has secured global industry-leading firm Arcadis to consult and conduct the Tolling Feasibility Study, which will explore the potential implementation of tolls across Kahnawà:ke's existing roadway network. Arcadis is recognized worldwide for its expertise in engineering, tolling system advising, and technology driven sustainable design, with operations in more than 70 countries. Their experience spans across Canada, the United States, the United Kingdom, Europe and Asia. The company generated over $5B in revenue in 2024 and has led major projects including the tolling system for the Gordie Howe International Bridge. This feasibility study will assess technical, financial, environmental, infrastructural, and community perspective factors, and is expected to take 6 to 12 months to complete. Additional factors will be analyzed, such as the potential impacts that tolls could have on the local economy, traffic congestion, safety and security, and jurisdiction. This work represents Kahnawà:ke's continued exploration of the project's viability and will provide recommended options on the type of toll that would best be suited for Kahnawà:ke roadway network. In the fall of 2025, MCK established a community team to evaluate the necessary components that would need to be considered for any tolling framework. This team includes experts in transportation, public safety, finance, and infrastructure. Discussions continued in January 2026, further refining the areas of study and ensuring that community needs, rights, and safety remain central in the evaluation process.

Grenfell Record
Mar 11th, 2026
Every section of Inland Rail in NSW now approved

Every section of Inland Rail in NSW now approved. The approval of the last 15km of the Inland Rail line in NSW marks a significant milestone Christine Little March 11, 2026 - 03:54 Updated, March 11, 2026 - 03:56 Every NSW section of the Inland Rail is now approved. That's the latest from the Australian Rail Track Corporation and its team constructing the 1600km freight rail line connecting Melbourne to Brisbane via regional Victoria, NSW and Queensland. The Narrabri to North Star Phase 2 (N2NS Phase 2) section has received Australian Government approval - at just 15km it marks a significant milestone for the Inland Rail project with all NSW sections of the line now formally approved. The N2NS Phase 2 project was assessed by the Australian Government under the Environment Protection and Biodiversity Conservation Act 1999. With primary regulatory approvals in place, Inland Rail will continue to work with the design services contractor, joint venture partners Arcadis BG&E, to progress the design of the N2NS Phase 2 project. It includes the upgrade of about 12km of existing rail track and formation across the Gwydir Valley floodplain, north of Moree, and the construction of 1.6km of greenfield rail track to bypass the existing Camurra Hairpin and a new 1.3km spur to maintain connection to the Weemelah line. Phase 1 works were completed in 2023. Inland Rail is taking a staged delivery approach, with sections between Beveridge in Victoria and Narromine in NSW already under construction or completed, on track ready for double-stacked operations by 2027. The entire Inland Rail route has been divided into 12 sections, with construction on the first section taking place in Parkes on the Parkes to Narromine (P2N) line, officially beginning on 13 December, 2018 and was completed and became operational in September 2020. The 170-km Stockinbingal to Parkes section, in the south and takes in Forbes, began in September 2023 and was completed in January this year, marking the third of 12 Inland Rail sections to become fully operational. Future decisions on the construction of Inland Rail north of Narromine are a matter of consideration for the Australian Government.

PR Newswire
Mar 6th, 2026
Arcadis wins two LA infrastructure contracts worth over $18M

Arcadis has secured two contracts with the City of Los Angeles worth over $18 million. The global design and engineering consultancy will provide project and construction management support for the $2.5 billion Los Angeles Convention Center Modernization and Expansion programme, valued at $11 million. The phased design-build initiative will add 190,000 square feet of exhibit hall space, 55,000 square feet of meeting space, and 95,000 square feet of external event space, making it one of the largest convention centres in the US. The project is expected to create over 15,000 jobs. Arcadis also won a $7.5 million, five-year contract supporting the Department of Public Works Bureau of Engineering's Clean Water Program, encompassing stormwater initiatives across Los Angeles.

INACTIVE