Full-Time

Engineer – Production

Posted on 4/5/2024

Venture Global LNG

Venture Global LNG

501-1,000 employees

Long-term, low-cost North American LNG producer

Venture Capital
Energy

Junior, Mid

Arlington, VA, USA + 1 more

Requirements
  • Bachelor's degree in Process, Production/Chemical Engineering
  • Minimum 3 years' experience working as a Production Engineer with a demonstrated track record of Production performance improvement.
  • Oil and Gas experience is required, with strong preference in LNG, however, petrochemical, NGL, cryogenic natural gas processing, or other hydrocarbon processing experience may be acceptable.
Responsibilities
  • Set CP Facility LNG Trains Production daily targets, define operating limits and engage with Operations, Maintenance and Engineering to develop the Production Plan for the day.
  • Build and maintain Real time, online, surveillance and monitoring models to optimize the Availability and Performance of the CP Facility LNG Liquefaction Trains
  • Perform Analysis to detect deviations from Live Operating Envelope Limits and identify the actions required to safely and reliably maximize LNG rundown.
  • Identify short-, medium- and long-term Availability and Reliability improvement initiatives to maximize LNG rundown using insights from Real time System and Physics-based/data-driven models.
  • Identify Production risks that could impact Availability and Reliability and develop mitigation plans to address them
  • Provide input to the weekly and monthly Production reviews and follow up on any actions required to improve the performance of the CP Facility LNG Trains
  • Identify the CP Facility LNG Trains production loss events and engage with the relevant stakeholders (including but not limited to Engineering, Maintenance, Operations) to review, validate, report and manage production losses in a timely manner to maximize Availability and Reliability
  • Lead or be part of EIRs (Engineering Investigation Requests) and MoCs (Management of Change) required to improve the CP Facility LNG Trains performance.
  • Lead or be part of the CP Facility LNG Trains Production loss RCAs when required.
  • Gather the required assumptions on LNG Trains performance and provide timely input to the Forecast and Annual Delivery Plan process.
  • Support the Long-Term Service Agreement (LTSA) process and provide all the required input and analysis as required
  • Support the development of Integrated Production Excellence standards and procedures.
  • Capture Lessons Learned from the CP Facility and provide input to other Venture Global LNG projects / sites as required

Venture Global LNG is a long-term, low-cost producer of North American liquefied natural gas (LNG), with facilities such as Calcasieu Pass, Plaquemines LNG, CP2 LNG, and Delta LNG, supplying clean and reliable energy to the world. The company is also involved in developing Carbon Capture and Sequestration (CCS) projects at each of its LNG facilities to further enhance its environmental impact.

Company Stage

Series C

Total Funding

$10.1B

Headquarters

Arlington, Virginia

Founded

2013

Growth & Insights
Headcount

6 month growth

21%

1 year growth

75%

2 year growth

138%