Full-Time

Structural Analysis Engineer

Posted on 11/6/2024

The Boring Company

The Boring Company

501-1,000 employees

Constructs underground tunnels for urban transportation

Automotive & Transportation
Industrial & Manufacturing

Mid

Bastrop, TX, USA

Onsite position in Bastrop, TX.

Category
Structural Engineering
Architecture & Civil Engineering
Required Skills
CAD
Requirements
  • Bachelor’s Degree in Mechanical Engineering (or similar)
  • 3+ years of experience in Mechanical Engineering role or relevant position.
  • Experience in the structural analysis methods and documentation, weld sizing, bolted joints, and buckling
  • Proficiency in developing and resolving complex load cases induced by the tunnel boring machine or ground pressures
  • Experience in linear static and non-linear structural analysis using FEA tools such as ANSYS Mechanical, Solidworks Simulation, SimSolid, etc
  • Understanding of common steel fabrication methods such as rolling, bending welding, machining, and waterjet cutting
  • Hands-on hardware experience performing fabrication, assembly and/or testing - can be in a professional, academic or recreational setting
  • Master’s degree in Mechanical Engineering
  • Strong teamwork skills with a proven ability to effectively interact and collaborate with other engineering disciplines
  • Knowledgeable in mechatronics, mechanism design, fluid power system concepts and design, dynamics, material selection, testing methods, and common machining and fabrication processes
  • Acute attention to details
Responsibilities
  • Support the structural design of tunnel boring machines and associated support equipment
  • Develop finite element models to perform linear and non-linear structural analysis of various welded steel structures
  • Act as a subject matter expert for finite element analysis, providing assistance and direction to other team members as needed
  • Make recommendations for structure edits, material changes or weld reduction
  • Develop structural concepts and perform preliminary sizing using classical mechanics calculations and Finite Element Analysis (FEA) to meet stiffness, strength and other critical requirements
  • Employ competent use of judgment, hand calculations, FEA and CAD to develop and communicate designs
  • Own project schedule to ensure timely completion from conception to implementation
  • Communicate schedule to stakeholders and others with dependent systems, bringing attention to changes in schedule as they happen
  • Constantly evaluate how the system fits into the larger picture of a working operation. Ensure that design choices are in line with the top level needs with ample consideration of future developments
  • Ensure all systems are compliant with appropriate regulations such as MSHA, OSHA, NEC, NFPA, Class 1 Division 2 Hazardous Location

The Boring Company focuses on improving urban transportation by building underground tunnels to reduce traffic congestion. Its main product is a network of subterranean tunnels that allow for quick, direct travel between points without the disruptions of surface traffic. The company uses advanced tunneling technology, specifically the Prufrock Tunnel Boring Machine, which can dig tunnels at a rate of one mile per week, making the process faster and more cost-effective than traditional methods. Unlike competitors, The Boring Company offers a unique public transit system called Loop, which is an all-electric, zero-emissions service that transports passengers directly to their destinations without stops. The goal of The Boring Company is to create efficient, scalable transportation solutions that enhance urban infrastructure and alleviate congestion in cities.

Company Stage

Series C

Total Funding

$882.8M

Headquarters

Bastrop, Texas

Founded

2016

Growth & Insights
Headcount

6 month growth

2%

1 year growth

0%

2 year growth

1%
Simplify Jobs

Simplify's Take

What believers are saying

  • Increased urban congestion boosts demand for The Boring Company's tunneling solutions.
  • Closure of Hyperloop One reduces competition in underground transportation.
  • Expansion of Vegas Loop indicates potential for increased ridership and revenue.

What critics are saying

  • Safety violations in Vegas tunnel could lead to fines and project delays.
  • Environmental violations may damage reputation and affect future contracts.
  • High capital expenditure on new projects could strain financial resources.

What makes The Boring Company unique

  • The Boring Company uses proprietary Prufrock TBM for faster, cost-effective tunneling.
  • Their Loop system offers zero-emissions, direct-to-destination underground transit.
  • They focus on scalable urban infrastructure solutions for traffic congestion relief.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Medical, dental, & vision coverage

401(k)

Paid holidays

Paid vacation

Competitive equity

INACTIVE