Full-Time

Senior Technical Program Manager

Compute Payloads

Posted on 12/13/2025

Panthalassa

Panthalassa

51-200 employees

Autonomous floating wave-energy generators for power

Compensation Overview

$150k - $190k/yr

+ Equity

Seattle, WA, USA + 1 more

More locations: Portland, OR, USA

In Person

Relocation assistance to Portland or Seattle if needed.

Category
Business & Strategy (1)
Requirements
  • Bachelor’s degree in Engineering or a related technical field
  • 5+ years of experience supporting hardware product development in startup or early-stage environments
  • Proven track record of leading cross-functional teams to meet aggressive program timelines
  • Familiarity with mechanical, electrical, thermal, and software integration
  • Experience coordinating with external suppliers and fabrication partners
  • Strong organizational skills and attention to detail
  • Excellent written and verbal communication skills, including experience presenting to senior leadership
  • Comfortable working in a fast-paced, dynamic, and highly collaborative environment
  • Ability to travel as needed for site visits and partner engagements
Responsibilities
  • Manage project milestone schedules for the Compute Payloads program, ensuring clear communication of status, risks, and dependencies to internal stakeholders
  • Act as a liaison between mechanical, electrical, software, systems, and manufacturing teams to drive alignment and efficient execution
  • Lead scheduling and coordination for Compute Payload test, integration, and demonstration operations in the Pacific Northwest
  • Drive the change management system for Compute Payload configurations throughout the design process, from ideation through demonstration and deployment
  • Track dependencies and integration points across mechanical, electrical, software, and thermal systems
  • Manage multiple configurations concurrently for different customer requirements
  • Support development and execution of test beds, shore demonstrators, and sea-worthy demonstrators for deployment in Nodes
  • Collaborate with external suppliers and fabrication partners to ensure timely, high-quality delivery of components
  • Monitor and escalate program risks, while proactively contributing to mitigation strategies
  • Align delivery milestones with customer expectations and internal engineering goals
  • Maintain documentation and tools that support program execution and scaling
Desired Qualifications
  • Experience with datacenter hardware and infrastructure, including GPUs, thermal management, power delivery, and high-density compute systems
  • Experience with hardware product development through production, fabrication, or manufacturing stages
  • Experience in customer-facing roles gathering design requirements or other design inputs
  • Familiarity with change management systems, PLM/MES/ERP tools, and configuration control processes
  • Hands-on exposure to manufacturing processes, integration workflows, or large mechanical systems

Panthalassa designs autonomous, floating energy nodes that harvest power from open-ocean waves. Each node is a solid sphere about 50 meters in diameter with a neck extending 60–70 meters below the surface; wave motion pumps seawater into a pressurized reservoir and drives electricity through a single turbine for onboard use. The system emphasizes a simple, rugged solid‑state design and offshore, autonomous operation, with modular, marine-based energy generation aimed at a high capacity factor (up to 90%). Its goal is reliable, ocean-based power for on-site applications and scalable sea-based energy infrastructure for clean power and fuels, supported by funding from investors like Founders Fund, Gigascale Capital, and Lowercarbon Capital.

Company Size

51-200

Company Stage

Series B

Total Funding

$218.1M

Headquarters

Portland, Oregon

Founded

2016

Simplify Jobs

Simplify's Take

What believers are saying

  • Raised $140M Series B from Peter Thiel in May 2026 to build Portland pilot factory.
  • Successful Ocean-1, Ocean-2, Wavehopper sea trials in 2021 and 2024 de-risk Ocean-3 deployment.
  • Targets AI data center boom with $0.02/kWh wave power and ocean cooling.

What critics are saying

  • CorPower Ocean's efficient converters capture European market share within 12 months.
  • Aikido's hybrid wind platforms steal AI partnerships from Panthalassa in 6 months.
  • Starcloud's $1.1B space data centers obsolete ocean tech within 24 months.

What makes Panthalassa unique

  • Panthalassa deploys 50-meter spherical nodes harnessing open-ocean waves for onsite power.
  • Nodes power AI compute clusters and green hydrogen production directly at sea.
  • Ocean-3 platform transmits data via low-Earth-orbit satellites without land cables.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Disability Insurance

Flexible Paid Time Off

401(k) Retirement Plan

401(k) Company Match

Relocation Assistance

INACTIVE