Full-Time

Technical Leader - Coatings/Surface Prep

AMRT

GE Vernova

GE Vernova

1,001-5,000 employees

Global energy provider: power, wind, electrification

Compensation Overview

$113.2k - $188.8k/yr

+ Discretionary annual bonus

No H1B Sponsorship

Greenville, SC, USA

In Person

Travel of 10–15% per year is required; relocation assistance is provided.

Bachelor's

Category
Aerospace Engineering (1)
Required Skills
Metallurgy

Get referred to GE Vernova

See people who can refer or advise you

Requirements
  • A Bachelor of Science degree in Engineering, Materials Science, Physics, Chemistry, Mathematics, or a related technical discipline is required.
  • At least 8 years of technical experience in thermal spray coatings and surface preparation technology, including process fundamentals, application methods, and associated equipment, is required.
  • Willingness and ability to travel 10–15% per year to support global locations and service centers is required.
  • Candidates must be legally authorized to work in the United States.
  • Candidates must be able to obtain authorization from the U.S. Government to access U.S. export-controlled information, if applicable.
Responsibilities
  • Provide technical leadership for a team of engineers focused on thermal spray coatings and surface preparation technologies.
  • Lead the development, qualification, standardization, and industrialization of global coating and surface preparation processes for gas turbine hardware.
  • Serve as the team’s technical focal point for thermal spray process technology, equipment, application methods, and process control.
  • Drive technology and productivity projects supporting contractual services, transactional services, fulfillment, and new product introduction supply chain development.
  • Ensure coating and surface preparation processes meet technical specifications, quality standards, and productivity targets.
  • Partner with manufacturing, sourcing, Repairs Value Stream, services, global engineering, manufacturing process engineering, design, systems, and customer services engineering organizations to enable process deployment and execution.
  • Support development of special processes for coatings and surface preparation technologies and standardized methods across the global network.
  • Provide technical guidance and support for supply chain development initiatives, including process capability assessment and implementation.
  • Lead and maintain project schedules, technical deliverables, and prioritization across team activities.
  • Communicate project status, risks, and progress to stakeholders at all levels of the organization.
  • Mentor and develop less experienced engineers and contribute to the technical growth of the team.
  • Support problem solving and root cause analysis related to coating performance, surface preparation challenges, equipment issues, and process variation.
  • Contribute to the long-term strategy for advancement of thermal spray and surface preparation technology within the organization.
Desired Qualifications
  • Strong project management skills, with the ability to lead technical programs and drive projects to completion.
  • Knowledge of gas turbine hardware, including component function, materials, and repair and manufacturing considerations.
  • Advanced experience in thermal spray technology development and industrial implementation.
  • Experience in manufacturing or component repair for industrial gas turbines.
  • A strong materials and metallurgical background, especially related to coatings, bond strength, substrate condition, and process interactions.
  • Familiarity with manufacturing and repair processes for gas turbine components.
  • Knowledge of operational practices in GE Vernova manufacturing or service facilities.
  • Experience with coating equipment selection, qualification, troubleshooting, and process optimization.
  • Ability to balance strategic technology development with day-to-day execution support.
  • Ability to communicate effectively across technical teams, leadership, and external partners.
  • Ability to lead through influence, provide clear technical direction, and build alignment across stakeholders.
  • Experience mentoring and supporting technical development while fostering a collaborative team environment.
  • Ability to understand business objectives and translate them into actionable technical priorities.
  • Ability to anticipate internal and external customer needs and work proactively to meet them.
  • Ability to measure process success through safety, quality, delivery, and customer impact.

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders jumped 88% to $24.2 billion, led by Power and Electrification.
  • Data center orders exceeded $5 billion in first-half 2026, more than all 2025.
  • Management raised 2026 guidance and expects at least 125 GW gas backlog by year-end.

What critics are saying

  • Wind orders fell 40% in Q2 2026, and GE Vernova expects roughly $400 million losses.
  • Massachusetts courts blocked GE Vernova from exiting Vineyard Wind over unpaid $300 million claims.
  • Tariff uncertainty and permitting delays still throttle U.S. onshore wind orders through 2026.

What makes GE Vernova unique

  • GE Vernova sells the grid and turbine hardware that runs 25%-30% of global electricity.
  • Its 116 GW gas backlog and H-Class turbines lock customers into decade-long service contracts.
  • GridOS, HVDC, and Prolec-backed electrification make it harder for utilities to multi-source suppliers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Aug 18th, 2026
SHINE joins GE Vernova ARPA-E project to modernise nuclear fuel recycling accountability with AI

SHINE is joining a GE Vernova-led project funded by the Department of Energy's Advanced Research Projects Agency-Energy to develop modernised nuclear material tracking systems for fuel recycling facilities. The project aims to use artificial intelligence to optimise spent nuclear fuel tracking and measurement. As a subcontractor, SHINE is developing improved sensor deployment and AI-powered material-tracking systems for nuclear fuel recycling facilities. The technology, called Monochromatic Assays Yielding Enhanced Reliability (MAYER), is designed to track and measure nuclear material in real time, feeding information into a virtual digital twin. The system aims to replace current methods involving redundant instrumentation, manual sampling, and periodic shutdowns for inventory checks. SHINE's participation supports its broader goal of building a commercial nuclear fuel recycling facility in a lower-security regulatory category.

Yahoo Finance
Aug 17th, 2026
GE Vernova's wind orders plunge 40% as AI-driven gas turbine boom masks segment's struggles

GE Vernova reported strong second-quarter results with revenue rising 22% year-over-year to $11.1 billion, surpassing analyst estimates by $330 million. Total orders surged 88% organically to $24.2 billion, driven by AI-related demand for gas turbines and grid equipment. However, the company's Wind segment saw organic orders plunge 40%. The decline stems from quality-control issues, including turbine failures at major projects, alongside inflation and supply chain problems that compressed margins on fixed-price contracts. The segment now represents just 5% of total orders, down from 13% in 2025. GE Vernova's Wind business posted a negative 19% adjusted EBITDA margin in the first half of 2026. Despite this, investors remain unfazed as the Power and Electrification segments deliver strong margins of 17.6% and 18.2% respectively, easily offsetting Wind's losses.

Form Energy
Aug 12th, 2026
Form Energy Secures $750M in Series G Financing to Scale Iron-Air Battery Manufacturing and Accelerate Commercial Deployments

Weirton, WV – August 12, 2026 – Form Energy, Inc., an American technology company developing and commercializing a new class of cost-effective, multi-day energy storage systems, announced today a $750 million Series G financing round led by T. Rowe Price, which also led the company’s prior Series F round. This round brings Form Energy’s total […]

Yahoo Finance
Aug 7th, 2026
GE Vernova holds $176B backlog yet stock dips 5% as wind losses and spending increases spook investors

GE Vernova, General Electric's former energy division spun off in 2024, reported a $176.3 billion backlog in Q2 2026, up 37% year-over-year. The company's growth has been driven by expanding cloud, AI, and data centre markets requiring increased power infrastructure. Total orders surged 89% in the first half of 2026, with Power and Electrification segments rising 99% and 131% respectively. GE Vernova expects full-year revenue growth of 19% to 22%. Despite strong performance, shares declined 5% over the past month whilst the S&P 500 gained 3%. The pullback followed Q2 results where adjusted EBITDA and earnings per share missed Wall Street expectations due to increased capacity spending and additional losses in the Wind division.

Yahoo Finance
Aug 6th, 2026
GE Vernova books $176B backlog with 134% gas order growth as Eaton rides 65% data center surge

GE Vernova and Eaton released second-quarter 2026 results highlighting surging demand from AI infrastructure buildout. Vernova reported $5.50 billion in Power segment revenue with gas equipment orders up 134% organically. The company booked $2.7 billion in data centre orders during the quarter alone and expects to reach at least 125 gigawatts of gas equipment under contract by year-end. Total backlog stands at $176 billion. Eaton posted revenue of $8.531 billion, up 21.39%, with adjusted earnings per share of $3.15. Data centre revenue grew roughly 65% in both its Electrical Americas and Electrical Global divisions. The Boyd Thermal liquid-cooling business, acquired for $9.55 billion in March, generated $432 million in second-quarter revenue. Vernova guided free cash flow to $11.5 billion to $12.5 billion, whilst Eaton raised its full-year earnings guidance to $13.40 to $13.60 per share.