Full-Time

Conventional Control System Project Engineer

Updated on 7/21/2026

GE Vernova

GE Vernova

1,001-5,000 employees

Portfolio of energy businesses delivering electricity

No salary listed

Dubai - United Arab Emirates

In Person

Based in Sharjah SAIF Zone, UAE; frequent travel within UAE (approx 20%) and region (approx 10%).

Category
Electrical Engineering (1)

Get referred to GE Vernova

Find people who can refer or advise you

Requirements
  • Bachelor’s degree in electronic/electrical engineering or related field
  • Minimum of 3 years of experience in protection, CCS (Conventional Control System), M&D (monitoring and diagnose) systems such as MiCOM, UR family protection relays, DGA900, MS3000, etc.
  • Minimum of 3 years of working experience in high voltage substation engineering and field activities.
  • Strong knowledge in protection main relays and busbar philosophy.
  • Strong knowledge in Conventional Control System (CCS), distributed control system (DCS) and cyber security system implementation and design activities.
  • Strong knowledge in field devices, instruments and CCS systems.
  • Ability to understand and implement technical drawings (wiring diagram, P&ID, General Arrangement, etc…).
  • Strong communication skills in English
  • The role is based in the Sharjah Airport International Free Zone (SAIF Zone) and requires regular travel, including approximately 20% within the UAE and 10% across the region.
Responsibilities
  • Responsible for the engineering and design of CCS (Conventional Control System) & BBP (Busbar Protection), M&D (monitoring and diagnose) Projects, any other GA (Grid Automation) related projects.
  • Manage the workload of the projects to ensure 90% and above billable ratio.
  • Liaise with other members of a multidisciplinary team.
  • Support to Operations team to Control projects effectively in terms of budgeted profitability, planning, and general reporting (internal / external).
  • Ensure that agreements with customer for documentation lead times, delivery, reliability and quality are achieved within the budgetary constraints agreed within the Unit.
  • Follow workplace EHS issues and ensure availability of suitable PPE for T&C personnel, both internal and subcontracted.
  • Manage and secure approval as well as renewal of approvals of engineering engineers from key accounts.
  • Ensure commitments to customer are met in accordance with contract with clear feedback through consistent customer interaction, e.g. communication, (phone, e-mail, etc.) and customer meetings, periodic reviews etc.
  • Implementation of ServiceMax during the project execution.
  • Have experience and able to handle engineering and field service works for [Protection Relays, Panels modification, protection logic diagram, GA/LA, Bill of Materials, Purchasing requests, Protection/SCMS/LCC Schematics, SCMS/Cyber Security Architectures, SCMS Signal list, Cable Schedule, Control Desk Drawing, IEC61850 signal mapping, etc..].
  • Support for all Production documents (Wiring Table/Label list/Cable Schedule/Interpanel wiring files), CT/VT Adequacy check, Relay setting calculations.
  • Have experience for busbar protection engineering and site works.
  • Experienced in all protection relays software, test kits, and Microsoft office.
  • Revise drawings against comments and replying to customer / Consultant comments.
  • Provide technical clarification to Suppliers/Customers.
  • Coordinating with panel manufacturer.
  • Representing GE before customer & consultants in technical discussions and workshop.
  • Providing input and securing design documents of required quality on time from design out-sourcing partners.
  • Assisting and guiding a small team of draftsmen in their daily design activities to bring out collaborative performance.
  • Able to handle the testing, panel integration, and internal validation at GEV facility.
Desired Qualifications
  • PMP certification is an advantage but not compulsory.
  • Fluency in Arabic is an advantage
  • Knowledge of schemes and application of protection relays in electrical networks including HV & EHV systems, and state-of-the-art technologies in substation automation.
  • Excellent written and oral communication skills, to convey technical concepts to business and technical personnel
  • Ability to read / interpret tender / contract documentation, schematics, procedures, and policy guidelines.
  • Ability to draft routine reports and correspondence.
  • Ability to define problems, collect relevant data, establish facts, and draw valid conclusions.
  • Ability to work on multiple tasks to meet strict deadlines, work under pressure, take ownership of onsite activities.
  • Experience of managing projects for protection and control systems is a distinct advantage.
  • Willing to travel, in country and worldwide, and to work over-time.
  • Strong analytic and problem-solving skills.
  • Good interpersonal and organizational skills

GE Vernova is the umbrella for GE’s energy businesses, including Power, Renewable Energy, and Digital, along with Energy Consulting, Energy Financial Services, Grid Solutions, Nuclear Energy, and LM Wind Power. It contributes to about one-third of the world’s electricity and focuses on making energy more reliable, affordable, and sustainable. The company combines hardware, software, services, and financing to deliver end-to-end energy solutions—from gas turbines, wind turbines, and nuclear systems to digital tools and grid infrastructure, supported by consulting and financing. What sets GE Vernova apart is its one-stop portfolio that covers the full energy value chain at a global scale, integrating equipment, software, services, and finance to help customers improve efficiency and decarbonize. Its goal is to speed the transition to reliable, affordable, and sustainable energy for customers around the world.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

Find people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Electrification division secured $2.4 billion in data center orders in Q1 2026, surpassing all 2025 totals.
  • Barclays names GE Vernova best positioned for 800VDC data center technology amid surging AI power demand.
  • Organic orders jumped 71% in Q1 2026 with backlog reaching record $163 billion as reservations extend to 2031.

What critics are saying

  • Wind segment underperformance continues dragging profitability despite 3.8 MW turbine launch in India and order cancellations.
  • Execution failures on $163 billion backlog could erode 12.8% net margin amid supply chain and labor bottlenecks.
  • Overvaluation at 58.2x forward P/E risks 20-30% equity correction if AI power demand growth slows or caps normalize.

What makes GE Vernova unique

  • GE Vernova uniquely supplies grid hardware and AI software for 25% of global electricity generation.
  • Its Gas Power backlog extends to 2030-2031 with turbine pricing doubling to $2,500 per megawatt.
  • CERius AI emissions software cuts monitoring costs by 50% while ensuring EU Carbon Border Mechanism compliance.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Apr 4th, 2026
GE Vernova secures $6M state funding for $96M energy research centre in Niskayuna

GE Vernova has secured an additional $6 million in state funding for its $96 million Advanced Research Center on Balltown Road in Niskayuna, New York. The grant, awarded through the FAST NY programme, will fund water supply, road and stormwater management upgrades at the campus, offsetting roughly half of the $12 million in required infrastructure improvements. The company previously received $9.6 million in state tax credits linked to plans for creating 75 new jobs at the research centre, along with low-cost hydropower allocation. The site, separate from GE Vernova's existing River Road labs, will house energy technology research including a direct air capture carbon system currently under testing. GE Vernova earned nearly $5 billion in 2025 on $38 billion in revenue, with a market value of $242 billion.

BetaKit
Mar 31st, 2026
ThinkLabs raises $28M USD Series A to help power grids handle AI data centre demand

ThinkLabs has raised $28 million USD ($39 million CAD) in a Series A round led by Energy Impact Partners to help power grids manage surging demand from AI data centres. Nvidia's venture fund NVentures and Edison International participated, alongside returning investors including GE Vernova. The Canadian-led, New York-based startup provides physics-informed AI software that creates digital twins of power grids, simulating scenarios to help operators maintain reliability and reduce outages. The platform reduces what would typically be a six-month, quarter-million-dollar study to under a day's analysis. Founded by former Toronto Hydro smart-grid department head Josh Wong, ThinkLabs spun out of GE Vernova in early 2024 with $6.8 million CAD in seed funding. The company will use the new capital to mature its product and expand features whilst focusing on the North American market.

Yahoo Finance
Mar 20th, 2026
Trump and Japan unveil up to $40B US nuclear reactor plan

President Donald Trump and Prime Minister Sanae Takaichi have unveiled a US-Japan energy investment plan potentially worth $40 billion, centring on small modular nuclear reactors. GE Vernova and Hitachi will develop BWRX-300 reactors in Tennessee and Alabama, whilst Japan will invest up to $33 billion in natural gas plants in Pennsylvania and Texas. The initiative forms part of a broader $550 billion bilateral investment fund agreed under a recent trade pact. It aims to address rising electricity demand from data centres and artificial intelligence infrastructure. However, most SMR designs await regulatory approval and none have been deployed on US grids. The agreement also covers critical minerals and industrial supply chains, with Japanese firms contributing components and participating in rare-earth projects across Indiana, Arizona and North Carolina.

Yahoo Finance
Mar 10th, 2026
GE Vernova shares rise 14.8% in 3 months on AI data centre power demand

GE Vernova shares have risen 14.8% over the past three months, outperforming its Zacks Alternate Energy – Other industry's 4.1% growth. The company is benefiting from surging electricity demand driven by AI data centre expansion, creating strong opportunities for its turbines and grid equipment. GE Vernova is improving profitability in its wind segment through cost controls and portfolio optimisation, whilst its gas power and power services businesses continue strong performance. In March 2026, the company secured a contract for a 100-megawatt wind farm in Italy, supplying 17 turbines plus maintenance support. The company is expanding its Italian manufacturing facility to boost production of transformer components and advancing its BWRX-300 small modular reactor project in Poland, strengthening its position in the nuclear power market.

Yahoo Finance
Mar 4th, 2026
BlackRock tips AI energy stocks over big tech, highlights 3 power plays for surging data centre demand

BlackRock is advising investors to focus on AI energy stocks rather than big tech companies in 2026, as AI data centres drive a surge in power demand. Deloitte anticipates a 30-fold increase in US AI data centre power consumption between 2024 and 2035. Three promising investments include Bloom Energy, which provides hydrogen fuel cell solutions for onsite electricity generation. The company reported $778 million in revenue last quarter, up 36% year over year, with analysts expecting accelerated growth. Constellation Energy, America's leading nuclear power provider, is restarting a Three Mile Island reactor to supply Microsoft's AI data centre. The company generates over two-thirds of its electricity through nuclear power. GE Vernova, General Electric's power production spinoff, reported orders up 34% to $59.3 billion, with a $150 billion backlog.