Full-Time

Pipeline Controller

Posted on 9/5/2026

Energy Transfer Partners

Energy Transfer Partners

1,001-5,000 employees

Operates energy transport and storage network

No salary listed

Houston, TX, USA

In Person

Some travel and occasional overnight travel may be required.

Category
Operations & Logistics (1)
Required Skills
Word/Pages/Docs
Excel/Numbers/Sheets

Get referred to Energy Transfer Partners

See people who can refer or advise you

Requirements
  • A High School Diploma or GED.
  • For Level C, 0–2 years of relevant industry experience or equivalent work experience is required; for Level B, 2–4 years; for Level A, 4 or more years.
  • Ability to pass pre-employment drug and alcohol screening and random testing under Pipeline and Hazardous Materials Safety Administration regulations.
  • Familiarity with personal computer applications, including Microsoft Excel, Microsoft Word, and Microsoft Project, as well as flow and pressure simulation, velocity, pressure drop, purge and pack, regulators and control valves, and relief valves.
  • Multitasking, analytical, and judgment skills with strong attention to detail.
  • Strong verbal communication and interpersonal skills.
  • Willingness to work some travel and overtime.
  • Ability to work 12-hour day and night shifts, including weekends and some holidays.
  • Ability to work from an alternate Control Center location during an emergency.
Responsibilities
  • Monitor and maintain pipeline pressures within design criteria and monitor gas and liquids quality at various points.
  • Work with various departments within the organization to execute scheduled changes.
  • Serve as the first contact during emergency response situations, including notifying emergency services and management.
  • Work with the pipeline operations group and plants to maximize gas pipeline throughput, including coordinating during equipment or pipeline outages.
  • Initiate pump and delivery schedule changes, monitor tank inventories, meter counts, line pressures, and temperatures, and control product delivery and changes at remote locations using computer-controlled field equipment.
  • Use discretion to adjust pump and delivery schedules to maintain delivery schedules, product quality, safe operating conditions, and cost-efficient operations.
  • Monitor tank inventories and handle shippers’ products into and out of attended and unattended storage facilities.
  • Work with field personnel to troubleshoot communications, supervisory control and data acquisition systems, control valves, and other control and operations equipment.
  • Complete daily throughput reports.
  • Update and maintain emergency notification and operational call-out lists.
  • Evaluate operational problems and provide recommendations to solve them.
Desired Qualifications
  • Experience in remote control, pipeline operations, or another field directly related to Control Center functions.
  • Basic knowledge of measurement principles and gas and liquids hydraulics.
Energy Transfer Partners

Energy Transfer Partners

View

Energy Transfer Partners manages a vast network of over 125,000 miles of pipelines and infrastructure used to transport and store natural gas, crude oil, and refined products across 44 states. The company moves energy from production basins to refineries and end-users through a system of pipes, storage facilities, and export terminals, earning revenue primarily through service fees. Unlike many competitors, it maintains a highly diversified portfolio that covers every major U.S. production basin and includes significant interests in retail and compression services. Its goal is to provide a comprehensive midstream network that facilitates the efficient movement of energy products to meet domestic and international demand.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Dallas, Texas

Founded

1995

Get referred to Energy Transfer Partners

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 adjusted EBITDA rose 31% to $5.07 billion, with guidance lifted.
  • Management raised 2026 EBITDA guidance to $18.8 billion-$19.1 billion and distribution 3%.
  • Blue Marlin and Green Chile target data-center and export demand, with volumes rising.

What critics are saying

  • Pennsylvania prosecutors investigate the Twin Oaks spill; convictions threaten Mariner East permits.
  • Green Chile lost state-land access and slipped to February 2027, delaying revenue.
  • Blue Marlin still awaits federal approval; Sabine Lake opposition threatens years of delay.

What makes Energy Transfer Partners unique

  • ET spans 125,000 miles across 44 states, linking every major U.S. production basin.
  • Its integrated network moves gas, NGLs, crude, refined products, fractionation, and LNG.
  • Sunoco, USAC, and Lake Charles LNG create diversified cash flow and export optionality.

Help us improve and share your feedback! Did you find this helpful?

Benefits

401(k) Company Match

Profit Sharing

Paid Vacation

Company News

PA Environment Digest Blog
Sep 5th, 2026
Inside Climate News: Energy Transfer/Sunoco files lawsuit to preempt criminal charges by PA Attorney General in Bucks County jet fuel pipeline spill, asks for state Clean Streams Law to be declared...

Inside Climate News: Energy Transfer/Sunoco files lawsuit to preempt criminal charges by PA Attorney General in Bucks County jet fuel pipeline spill, asks for state Clean Streams Law to be declared unconstitutional. On September 4, 2026, Inside Climate News reported Energy Transfer/Sunoco filed a lawsuit in Commonwealth Court in April seeking to preempt criminal charges by Pennsylvania Attorney General David Sunday over a jet fuel pipeline spill in Bucks County by declaring part of the state Clean Streams Law unconstitutional. Energy Transfer's objection to the law: Parties could be found guilty of an environmental crime even if their actions are accidental. Because one section of the law lacks what is called a "mens rea," or "guilty mind" provision, the company said, parties could face fines or imprisonment whether or not their actions were knowing and purposeful. "A lack of mens rea requirement here offends the principles of justice and does not provide adequate notice of the offending conduct that could form the basis for criminal liability," Energy Transfer's petition said. [Note: The federal Pipeline and Hazardous Materials Safety Administration said its investigation into the pipeline leak so far shows the Energy Transfer pipeline may have been leaking for as long as 16 months, WHYY reported on February 28.] The court challenge comes before any charges have been filed against Energy Transfer. And it concerns both a law and a legal interpretation that may not be relevant to the criminal investigation the company and its subsidiary Sunoco now face over their Twin Oaks pipeline, said Pennsylvania Attorney General Dave Sunday in his Aug. 25 response to the lawsuit. Sunday urged the court to dismiss the lawsuit, which he characterized as an improper effort "to pre-empt an anticipated criminal proceeding." Instead of waiting to see if a case is filed and defending itself against whatever charges it faces, Sunday said Energy Transfer is seeking to get a court ruling in its favor - a declaratory judgment - in advance. "A criminal investigation is not a criminal charge, and a declaratory judgment cannot be used to substitute a defense against a criminal charge," Sunday said in his brief. Neither Energy Transfer nor its lawyers immediately responded to a request for comment on the case, nor did Sunday's office. Click Here to read the entire article Prior Criminal Convictions/Penalities On August 5, 2022, EnergyTransfer, Sunoco, ETC Northeast Pipeline LLC were convicted of criminal charges related to their conduct during the construction of two major pipelines in Pennsylvania that resulted in a catastrophic explosion of the Revolution Pipeline in Beaver County and contaminated water supplies related to the Mariner East Pipelines. Read more here. Energy Transfer/Sunoco have been fined a total of over $48.1 million for multiple, serious violations related to the construction of the Mariner East Pipelines and the Revolution Pipelines starting in 2018 that resulted in an explosion, contamination of water supplies, pollution of the Marsh Creek State Park lake and the lake at the Raystown Lake Recreation Area. In 2018, DEP imposed an unprecedented block on issuing any new permits to Energy Transfer/Sunoco until the company resolves multiple environmental violations and adopts policies that require compliance with the state's environmental laws and regulations. Read more here. Frustration by the flagrant violations of environmental laws and the inability of current state law to prevent damage caused by Energy Transfer/Sunoco pipeline construction related to the Mariner East Pipeline can be illustrated by a 2018 quote from Republican Sen. Don White (Indiana County) at a Senate Committee meeting- "We should be able to deal with that company and put them out of business." Read more here. The Public Utility Commission fined Energy Transfer/Sunoco $1 million for violations related to the Revolution Pipeline explosion. Read more here. In 2020, the PUC imposed a $200,000 penalty on Energy Transfer/Sunoco related to integrity testing of the Mariner East Pipeline 1. Read more here. New Companies In July 2026, the Energy Transfer pipeline company asked the Public Utility Commission to dissolve the Sunoco Pipeline Company and transfer its assets to two new companies. (formal notice) One new company- Energy Transfer NE NGL Pipelines LLC - would own and operate the troubled Mariner East Pipelines and other pipelines carrying natural gas liquids. A second company- Energy Transfer RP Pipelines LLC- would own and operate the pipelines carrying refined petroleum products. Read more here. The Bucks County Incident On January 31, 2025, Energy Transfer/Sunoco confirmed that its pipeline had leaked petroleum, initially contaminating seven wells in the Mt. Eyre Manor neighborhood in Upper Makefield Township. The federal Pipeline and Hazardous Materials Safety Administration said its investigation into the pipeline leak so far shows it may have been leaking for as long as 16 months, WHYY reported on February 28. Third-party environmental consultants - working under DEP oversight - have conducted water tests at impacted homes, testing well water for petroleum contamination. Treatment systems have been installed at 112 residences, seven of which had results above drinking water standards for petroleum products and with detectable contamination at other residences. Treatment systems are scheduled to be installed at many other homes. The point-of-entry treatment (POET) filtration systems that have been installed are designed to remove all contaminants from drinking water, ensuring residents can have access to clean water in their homes. On March 6, 2025, the Shapiro Administration issued an order directing Energy Transfer to continue providing bottled water to affected residents and sample and maintain the treatment systems that have been installed on homes. Additionally, DEP required Energy Transfer to submit a long-term cleanup plan and set up a way for affected residents and the community to access cleanup plans. On March 14, 2025 the Bucks County Courier Times reported the Pennsylvania Attorney General has opened an investigation into potential environmental crimes related to the Energy Transfer/Sunoco pipeline that leaked petroleum into household wells in Upper Makefield Township, Bucks County. Read more here. Visit DEP's Upper Makefield Pipeline webpage for more information on the response to the spill. (Map: Pipeline spill area of investigation.) PA Oil & Gas Industry, Public Notice Dashboards: - Pennsylvania Oil & Gas Weekly Compliance Snapshot - August 29 to Sept. 4 [PaEN]

EcoTopical
Sep 4th, 2026
A pipeline giant that spilled jet fuel in pennsylvania is trying to weaken a clean water law.

A pipeline giant that spilled jet fuel in pennsylvania is trying to weaken a clean water law. * InsideClimate News By By Marianne LavelleSep 4, 2026, 5:27 pm54 ptsTrending Energy Transfer has not yet been charged, but it is already moving to head off a criminal case over the monthslong jet fuel leak into a neighborhood's drinking water source. By Marianne Lavelle Energy Transfer, the Dallas-based pipeline giant facing a state-level criminal probe related to a jet fuel spill... Read Article Share Article * email * x.com * facebook * pocket * reddit * tumblr * linkedin * pinterest Welcome to EcoTopical Your daily eco-friendly green news aggregator. Leaf through planet Earths environmental headlines in one convenient place. Read, share and discover the latest on ecology, science and green living from the web's most popular sites.

The McKnight Team
Aug 29th, 2026
Eighteen months of contaminated wells in Upper Makefield.

Eighteen months of contaminated wells in Upper Makefield. By Josh McKnight | The McKnight Team A crack in the 68-year-old Twin Oaks pipeline operated by Energy Transfer went undetected for 16 months, releasing jet fuel and associated chemicals into groundwater in Upper Makefield Township. Residents have lived with contaminated drinking water wells for 18 months. More than 200 now rely on company-funded home filtration systems. Bucks County well water testing is not a formality for anyone buying in this part of the county, and the Upper Makefield case shows how long a problem can run before anyone detects it. Where the cleanup and the oversight stand. Energy Transfer is only now testing a vacuum extraction system to pull contamination from the soil. Federal oversight has been thin. The Environmental Protection Agency declined jurisdiction, on the position that groundwater falls outside Clean Water Act protection. The Pipeline and Hazardous Materials Safety Administration, which sits under the Department of Transportation, responded strongly at first and then softened its consent agreement with Energy Transfer. The agency has lost significant staff and initiated a record-low number of enforcement actions in 2025. That leaves the Pennsylvania Department of Environmental Protection overseeing cleanup under a voluntary state program that critics say was never designed for a residential drinking water crisis. U.S. Rep. Brian Fitzpatrick and U.S. Sen. John Fetterman are pushing for stronger pipeline safety legislation and federal funding to connect the affected neighborhood to public water. What Bucks County well water testing actually tells you. The standard well test is narrower than you probably assume. Coliform bacteria. Nitrates. Sometimes lead. That panel would not have caught this. Petroleum hydrocarbons and the compounds that travel with jet fuel require a separate test that nobody orders for you by default, which means Bucks County well water testing only covers what you specifically ask it to cover. Set that against what the numbers show right now. The average Bucks County home value is $530,927, up 3.3 percent over the past year, with homes going to pending in around seven days, per Zillow data through July 31, 2026. Zillow does not publish separate figures for Upper Makefield, so the county number is the closest verified benchmark. Seven days to pending. That is roughly how much time you get to decide what to test for. Why disclosure is the part most sellers get wrong. The Pennsylvania seller disclosure statement asks about the water supply and about known material defects. The operative word is known. A seller who has received notice of contamination, or who has a filtration system installed by a pipeline operator, has knowledge that must be disclosed. There is no ambiguity there. The harder cases sit at the edges. A property two miles from a known plume, never tested for hydrocarbons, with no notice from anyone. That seller may honestly have nothing to disclose, and you may still very much want to know. Disclosure law protects you against concealment. It does not substitute for your own due diligence. Pennsylvania is not an attorney state for residential transactions, which means this falls to the agent, the inspector, and the buyer to handle correctly. That is a real responsibility and it is not evenly met across the industry. Both things can be true. Most sellers in upper Bucks have nothing to hide, and a buyer is still right to test beyond the standard panel. If you have a well anywhere near the Twin Oaks corridor, tell your neighbor to test for hydrocarbons specifically. The routine panel will come back clean either way. What this means for you. If you are buying a well-water property in upper Bucks, order an expanded panel that includes volatile organic compounds and petroleum hydrocarbons, not just the standard bacteria and nitrate test. The additional cost is modest against the exposure. If you are selling, test before you list. A clean expanded panel in hand is a marketing asset, and it removes the single most effective negotiating tool a buyer has in a well-water transaction. Water source varies enormously street by street across this part of the county, and plenty of buyers do not know whether a property is on public water until the disclosure arrives. Newtown, immediately south of Upper Makefield, is largely on public systems and draws many of the same buyers. The market detail on its Newtown PA homes for sale page is a useful comparison point. Thinking about buying or selling in Upper Makefield or Bucks County? Let's talk. Frequently asked questions about Bucks County well water testing. How much does well water testing cost in Bucks County? A standard panel covering bacteria and nitrates is the least expensive option and the most commonly ordered. An expanded panel adding volatile organic compounds and petroleum hydrocarbons costs meaningfully more, and it is the one that would detect fuel contamination. Does contaminated well water have to be disclosed when selling? Yes, if the seller knows about it. The Pennsylvania disclosure statement covers the water supply and known material defects, and a filtration system installed by a pipeline operator constitutes knowledge that requires disclosure. Should I buy a home on well water in upper Bucks County? Well water is common and generally fine throughout the region. The decision turns on testing, not on avoidance. Order the expanded panel, review the results before contingencies expire, and price the outcome accordingly. What happens next with the Upper Makefield cleanup? Energy Transfer is testing a vacuum extraction system while the Pennsylvania Department of Environmental Protection oversees the work. Federal lawmakers are seeking funding to connect the affected neighborhood to public water, which would end the reliance on filtration. Buying or selling in the Philadelphia suburbs? The McKnight Team helps families across Bucks, Montgomery, Philadelphia, and Delaware Counties. Real market data, straight answers, and a team that answers when you call.

Daily Times Chronicle
Aug 25th, 2026
Green Chile gas pipeline to Project Jupiter delayed to 2027.

Green Chile gas pipeline to Project Jupiter delayed to 2027. * By Alton Wallace | The Center Square * Aug 25, 2026 Updated 32 mins ago * 0 (The Center Square) - A proposed pipeline that would supply natural gas to a data center now under construction for Oracle and OpenAI in southern New Mexico has been delayed until at least early next year, according to a recent federal regulatory filing. In a Federal Energy Regulatory Commission regulatory filing on Friday, Dallas-based midstream giant Energy Transfer revised the 17.7-mile-long Green Chile pipeline's targeted in-service date from August 2026 to early 2027. The Green Chile Pipeline would cross federal, private, and state trust lands in Doña Ana County, New Mexico, to provide gas to a new power plant for "Project Jupiter," a 2.5-Gigawatt data center that would be located just south of Las Cruces. The proposed pipeline project lost its expedited federal status last month following challenges by the Sierra Club and other environmental advocacy groups. Energy Transfer had initially sought an approval for the pipeline under a federal "blanket certificate" program. This fast-tracked regulatory process allows pipeline developers to bypass case-by-case review for minor infrastructure projects without the extensive public comment windows or multi-year environmental impact reviews required of major interstate pipelines. The formal challenges by environmental watchdogs forced the commission to remove the Green Chile project's fast-track status, triggering a longer, more detailed federal review process. In addition to the challenges filed by environmental advocacy groups like the Sierra Club, the Center for Biological Diversity, and Food & Water Watch, Federal Energy Regulatory Commission staff also objected to Energy Transfer's Green Chile pipeline application. In April, the commission's staff formally protested the request because Transwestern's representatives had not provided a copy of a finding by the New Mexico State Historic Preservation Office demonstrating the project's compliance with the National Historic Preservation Act. On Sunday, the New Mexico Supreme Court temporarily halted a scheduled hearing on an air quality permit for Project Jupiter's on-site power network. Plans call for the campus to generate its electricity using natural-gas-powered fuel cells provided by Bloom Energy. Environmental groups contend that voting on the power system's emissions is premature because the pipeline proposed to transport the natural gas has not been allowed to begin construction. New Mexico Land Commissioner Stephanie Garcia Richard, a Democrat who is the party's nominee for Lieutenant Governor in the upcoming November 2026 general election, twice denied Energy Transfer's lease applications this year. Garcia Richard ruled in March and again in July that the placement of fossil-fuel pipeline infrastructure across a 0.63-mile stretch of state trust property is not in the best interest of New Mexico's natural resources. This forced Energy Transfer to find an alternative route to Project Jupiter. "In New Mexico, we truly mean it when we say 'water is life,'" Garcia Richard said in July. "We can't live without it and we know how precious and rare it is in our dry climate. Massive AI data centers like Project Jupiter can rapidly deplete critical natural resources like water and threaten ecosystems by generating shocking levels of emissions to power their operations." Following Garcia Richard's denials of the lease applications, an Energy Transfer spokesperson told Natural Gas Intelligence that the company continues "to work through the permitting requirements as we move this project forward." Several New Mexico lawmakers said in July they're considering introducing legislation that would impose a statewide moratorium on large-scale data centers. Earlier this month, Texas Gov. Greg Abbott issued a statewide moratorium on all new data center approvals and grid connections. Other states, like Georgia and Virginia, have recently moved to curtail tax incentives or impose stricter environmental reviews on hyperscale data center construction over concerns about strains on regional supplies of electricity.

Salem Media Group
Aug 25th, 2026
Green Chile gas pipeline to Project Jupiter delayed to 2027.

Green Chile gas pipeline to Project Jupiter delayed to 2027. 1:20 PM on tuesday, August 25. Alton wallace. (The Center Square) - A proposed pipeline that would supply natural gas to a data center now under construction for Oracle and OpenAI in southern New Mexico has been delayed until at least early next year, according to a recent federal regulatory filing. In a Federal Energy Regulatory Commission regulatory filing on Friday, Dallas-based midstream giant Energy Transfer revised the 17.7-mile-long Green Chile pipeline's targeted in-service date from August 2026 to early 2027. The Green Chile Pipeline would cross federal, private, and state trust lands in Doña Ana County, New Mexico, to provide gas to a new power plant for "Project Jupiter," a 2.5-Gigawatt data center that would be located just south of Las Cruces. The proposed pipeline project lost its expedited federal status last month following challenges by the Sierra Club and other environmental advocacy groups. Energy Transfer had initially sought an approval for the pipeline under a federal "blanket certificate" program. This fast-tracked regulatory process allows pipeline developers to bypass case-by-case review for minor infrastructure projects without the extensive public comment windows or multi-year environmental impact reviews required of major interstate pipelines. The formal challenges by environmental watchdogs forced the commission to remove the Green Chile project's fast-track status, triggering a longer, more detailed federal review process. In addition to the challenges filed by environmental advocacy groups like the Sierra Club, the Center for Biological Diversity, and Food & Water Watch, Federal Energy Regulatory Commission staff also objected to Energy Transfer's Green Chile pipeline application. In April, the commission's staff formally protested the request because Transwestern's representatives had not provided a copy of a finding by the New Mexico State Historic Preservation Office demonstrating the project's compliance with the National Historic Preservation Act. On Sunday, the New Mexico Supreme Court temporarily halted a scheduled hearing on an air quality permit for Project Jupiter's on-site power network. Plans call for the campus to generate its electricity using natural-gas-powered fuel cells provided by Bloom Energy. Environmental groups contend that voting on the power system's emissions is premature because the pipeline proposed to transport the natural gas has not been allowed to begin construction. New Mexico Land Commissioner Stephanie Garcia Richard, a Democrat who is the party's nominee for Lieutenant Governor in the upcoming November 2026 general election, twice denied Energy Transfer's lease applications this year. Garcia Richard ruled in March and again in July that the placement of fossil-fuel pipeline infrastructure across a 0.63-mile stretch of state trust property is not in the best interest of New Mexico's natural resources. This forced Energy Transfer to find an alternative route to Project Jupiter. "In New Mexico, we truly mean it when we say 'water is life,'" Garcia Richard said in July. "We can't live without it and we know how precious and rare it is in our dry climate. Massive AI data centers like Project Jupiter can rapidly deplete critical natural resources like water and threaten ecosystems by generating shocking levels of emissions to power their operations." Following Garcia Richard's denials of the lease applications, an Energy Transfer spokesperson told Natural Gas Intelligence that the company continues "to work through the permitting requirements as we move this project forward." Several New Mexico lawmakers said in July they're considering introducing legislation that would impose a statewide moratorium on large-scale data centers. Earlier this month, Texas Gov. Greg Abbott issued a statewide moratorium on all new data center approvals and grid connections. Other states, like Georgia and Virginia, have recently moved to curtail tax incentives or impose stricter environmental reviews on hyperscale data center construction over concerns about strains on regional supplies of electricity.