Full-Time

Control Room Operator

Posted on 5/9/2026

Deadline 5/30/26
GE Vernova

GE Vernova

1,001-5,000 employees

Portfolio of energy businesses delivering electricity

Compensation Overview

$44 - $52/hr

Vancouver, WA, USA

In Person

Relocation assistance not provided; on-site role in Vancouver, WA.

Category
Building Systems & HVAC (2)
,
Requirements
  • High School Diploma or GED.
  • Minimum of 5 years of power plant experience.
  • Ability and willingness to stand or walk for up to 12 hours continuously, as required.
  • Ability and willingness to work rotating shifts.
  • Ability and willingness to work extra days/hours when called upon.
  • Ability and willingness to climb ladders and stairs, as required.
  • Ability and willingness to lift 50 pounds as required.
Responsibilities
  • Responsible for monitoring and operating controls in the centralized control room of the combined cycle power plant to control the loading and operation of a generating unit and associated equipment.
  • Observes operating parameters of equipment and assures that optimum operating conditions are maintained.
  • Required to perform Plant Outside Operator duties on an as needed basis.
  • Equipment and systems include the maintenance, repair, and operation of stationary engines and mechanical equipment to provide Clark Public Utilities with electrical power.
  • The stationary engines and mechanical equipment include gas turbine engines, steam turbines, diesel engines, generators, heat recovery steam generators, air compressors, motors, pumps, and other auxiliary equipment.
  • Primary duty is to operate the combined cycle power plant from the Control Room with limited supervision.
  • Must have the ability to adjust plant operating equipment to maintain optimal personnel safety, plant efficiency and reliability.
  • Read, understand and comply with all plant safety and regulatory procedures.
  • Follows all safety and environmental rules and regulations.
  • Must have the ability to recognize anomalies and take corrective measures to recover from plant and equipment casualties.
  • Keeps logs, records data and verbally communicates plant conditions.
  • Assists in the training and mentoring of less experienced team members.
  • Takes corrective action and/or initiates requests for equipment repair.
  • Monitors, and analyzes water chemistry.
  • Utilizes a CMMS system to prepare legible, and understandable work order for required preventative and corrective maintenance for equipment history and verification of work performed.
  • Performs general craft tasks, operates various industrial equipment, and uses power hand tools.
  • Reads and interprets drawings and prints.
  • Works with other craft and plant personnel as required.
  • Continually seeks process improvement to save cost and increase efficiency.
  • Lead and participate in the startup and shutdown of plant equipment from the control room and/or locally.
  • Coordinate and direct activities of assigned outside operators.
  • Perform routine inspections and tests to ensure the plant is operating at optimal level.
  • Monitor and maintain all required operational data logs and records.
  • Comply with all applicable environmental, health and safety policies.
  • Maintain and exercise control over all work done during shift, through management of Permit to Work and Life Safety Permits.
  • Operate all plant equipment / systems within scope of responsibility.
  • Assist / perform routine maintenance of basic plant equipment.
  • Off load and manage chemical and parts deliveries.
  • Maintain a safe working environment to include good housekeeping practices.
  • Read and interpret mechanical and process drawings.
  • Manage and participate in Environmental, Health and Safety and Administrative responsibilities assigned.
Desired Qualifications
  • Associate’s degree or equivalent technical school degree related to power generation or similar field of study.
  • Equivalent combination of education and experience working in a power plant for a minimum of 5 years.
  • Preferred prior experience in operations of a heavy duty industrial gas turbine combined cycle power plant.
  • Ability to read and interpret Piping and Instrumentation Diagrams, documents, operating and maintenance instructions and procedure manuals.
  • Ability to write reports and correspondence on a regular basis.
  • Ability to interact with a multitude of site visitors in a professional manner.
  • Ability to solve basic algebra, geometry and other basic math calculations.
  • Ability to interpret an extensive variety of technical instructions furnished in mathematical or diagram form and deal with several abstract and concrete variables.
  • Experience with maintenance of pumps, valves and related equipment.
  • Control Room operational experience with Ovation and MKVIe control systems.
  • Basic computer skills including a base knowledge of Microsoft Office applications.
  • Strong oral and written communication skills.
  • Strong interpersonal skills dealing with other individuals.
  • Possess optimistic "can do" attitude.
  • Work and communicate well in team environment.
  • Exhibit willingness to expand knowledge through continued training.
  • Conduct work activities in a professional manner in adherence to GE Vernova Values.

GE Vernova is the umbrella for GE’s energy businesses, including Power, Renewable Energy, and Digital, along with Energy Consulting, Energy Financial Services, Grid Solutions, Nuclear Energy, and LM Wind Power. It contributes to about one-third of the world’s electricity and focuses on making energy more reliable, affordable, and sustainable. The company combines hardware, software, services, and financing to deliver end-to-end energy solutions—from gas turbines, wind turbines, and nuclear systems to digital tools and grid infrastructure, supported by consulting and financing. What sets GE Vernova apart is its one-stop portfolio that covers the full energy value chain at a global scale, integrating equipment, software, services, and finance to help customers improve efficiency and decarbonize. Its goal is to speed the transition to reliable, affordable, and sustainable energy for customers around the world.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Cambridge, Massachusetts

Founded

2022

Simplify Jobs

Simplify's Take

What believers are saying

  • Data centre orders drive 20% of 100 GW gas pipeline with pricing 10-20 bps higher.
  • Global electricity supercycle from AI, EVs, and reshoring targets 50% revenue growth by 2028.
  • European expansion via Italian manufacturing and 100-MW wind contracts reduces US market dependence.

What critics are saying

  • Prolec integration failures erode $5B transformer backlog margins within 12-18 months.
  • BWRX-300 NRC regulatory delays push US deployments beyond 2030, stranding R&D investments.
  • Chinese competitors undercut onshore wind prices 25%, capturing 20% European and Asian share.

What makes GE Vernova unique

  • Integrated portfolio spans Power, Wind, and Electrification with $163B backlog and 2x book-to-bill ratio.
  • Prolec GE acquisition adds $5B transformer backlog, accelerating $200B target to 2027.
  • BWRX-300 small modular reactor partnership with Hitachi under $40B US-Japan nuclear plan.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at GE Vernova who can refer or advise you

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Apr 4th, 2026
GE Vernova secures $6M state funding for $96M energy research centre in Niskayuna

GE Vernova has secured an additional $6 million in state funding for its $96 million Advanced Research Center on Balltown Road in Niskayuna, New York. The grant, awarded through the FAST NY programme, will fund water supply, road and stormwater management upgrades at the campus, offsetting roughly half of the $12 million in required infrastructure improvements. The company previously received $9.6 million in state tax credits linked to plans for creating 75 new jobs at the research centre, along with low-cost hydropower allocation. The site, separate from GE Vernova's existing River Road labs, will house energy technology research including a direct air capture carbon system currently under testing. GE Vernova earned nearly $5 billion in 2025 on $38 billion in revenue, with a market value of $242 billion.

BetaKit
Mar 31st, 2026
ThinkLabs raises $28M USD Series A to help power grids handle AI data centre demand

ThinkLabs has raised $28 million USD ($39 million CAD) in a Series A round led by Energy Impact Partners to help power grids manage surging demand from AI data centres. Nvidia's venture fund NVentures and Edison International participated, alongside returning investors including GE Vernova. The Canadian-led, New York-based startup provides physics-informed AI software that creates digital twins of power grids, simulating scenarios to help operators maintain reliability and reduce outages. The platform reduces what would typically be a six-month, quarter-million-dollar study to under a day's analysis. Founded by former Toronto Hydro smart-grid department head Josh Wong, ThinkLabs spun out of GE Vernova in early 2024 with $6.8 million CAD in seed funding. The company will use the new capital to mature its product and expand features whilst focusing on the North American market.

Yahoo Finance
Mar 20th, 2026
Trump and Japan unveil up to $40B US nuclear reactor plan

President Donald Trump and Prime Minister Sanae Takaichi have unveiled a US-Japan energy investment plan potentially worth $40 billion, centring on small modular nuclear reactors. GE Vernova and Hitachi will develop BWRX-300 reactors in Tennessee and Alabama, whilst Japan will invest up to $33 billion in natural gas plants in Pennsylvania and Texas. The initiative forms part of a broader $550 billion bilateral investment fund agreed under a recent trade pact. It aims to address rising electricity demand from data centres and artificial intelligence infrastructure. However, most SMR designs await regulatory approval and none have been deployed on US grids. The agreement also covers critical minerals and industrial supply chains, with Japanese firms contributing components and participating in rare-earth projects across Indiana, Arizona and North Carolina.

Yahoo Finance
Mar 10th, 2026
GE Vernova shares rise 14.8% in 3 months on AI data centre power demand

GE Vernova shares have risen 14.8% over the past three months, outperforming its Zacks Alternate Energy – Other industry's 4.1% growth. The company is benefiting from surging electricity demand driven by AI data centre expansion, creating strong opportunities for its turbines and grid equipment. GE Vernova is improving profitability in its wind segment through cost controls and portfolio optimisation, whilst its gas power and power services businesses continue strong performance. In March 2026, the company secured a contract for a 100-megawatt wind farm in Italy, supplying 17 turbines plus maintenance support. The company is expanding its Italian manufacturing facility to boost production of transformer components and advancing its BWRX-300 small modular reactor project in Poland, strengthening its position in the nuclear power market.

Yahoo Finance
Mar 4th, 2026
BlackRock tips AI energy stocks over big tech, highlights 3 power plays for surging data centre demand

BlackRock is advising investors to focus on AI energy stocks rather than big tech companies in 2026, as AI data centres drive a surge in power demand. Deloitte anticipates a 30-fold increase in US AI data centre power consumption between 2024 and 2035. Three promising investments include Bloom Energy, which provides hydrogen fuel cell solutions for onsite electricity generation. The company reported $778 million in revenue last quarter, up 36% year over year, with analysts expecting accelerated growth. Constellation Energy, America's leading nuclear power provider, is restarting a Three Mile Island reactor to supply Microsoft's AI data centre. The company generates over two-thirds of its electricity through nuclear power. GE Vernova, General Electric's power production spinoff, reported orders up 34% to $59.3 billion, with a $150 billion backlog.