Full-Time

Area Operator

Confirmed live in the last 24 hours

Iberdrola Group

Iberdrola Group

10,001+ employees

Compensation Overview

$3.3k/bi-wk

Senior

Company Does Not Provide H1B Sponsorship

Augusta, ME, USA

The job requires compliance with immigration requirements for non-citizens.

Category
Electrical Engineering
Power Systems Engineering
Requirements
  • Able to make decisions expeditiously and safely during emergencies
  • Able to operate dispatch computer and communication equipment
  • Able to perform power system contingency analysis
  • Working knowledge of construction and operation of power handling equipment
  • Proficient verbal and written communication skills
  • At least 6 years of experience including Dispatch-related experience (i.e., substations, hydro, steam, engineering, line, etc)
  • Knowledge about dynamics of a power system, dispatcher tools, relay schemes and special protection systems
  • Knowledge of the general location and characteristics of all substations, transmission lines and selected distribution lines rated at 34.5 KV and below, within area of responsibility
  • Must have at least a two-year degree in Electrical Engineering Technology or related field or have passed the CMP ETQ exam.
Responsibilities
  • Supervises monitors, regulates and coordinates the use of all substations, transmissions facilities and selected distribution facilities at 34.5 KV and below
  • Coordinates transmission and selected distribution outages; conducts load flows; performs contingency analysis; performs voltage control and dispatch, and coordinates all switching and tagging on the 34.5 KV system and selected distribution equipment
  • Serves as central authority to direct all field work by means of dispatching orders that are in accordance with CMP Switching and Tagging Procedures
  • Isolate power system permanent faults and restore customer service as well as the power system reliability expeditiously and safely
  • Coordinate with Line and Substation Departments to reduce exposure to 'Life in Danger' situations, to ensure power system integrity is maintained and to minimize the duration of customer outages
  • Maintain sufficient reactive voltage support, and minimize losses on the 34.5 KV system, by operation of transformers LTCs and utilizations of VAR reserves
  • Performs load flow studies and contingency analysis to determine power system impact by proposed maintenance applications
  • Take advanced system operations training in voltage control, emergency procedure and other areas as needed
  • Has the authority to shed firm load as required maintaining system reliability and integrity during emergency conditions without obtaining approval from higher-level personnel
  • Manage and dispatch the Outage Management System and utilize associated support tools for outage recording and reporting
  • Other duties as assigned

Company Size

10,001+

Company Stage

IPO

Headquarters

Madrid, Spain

Founded

2008

Simplify Jobs

Simplify's Take

What believers are saying

  • Iberdrola's U.S. expansion taps into a fast-growing renewable energy market.
  • Investment in Wallbox supports smart EV infrastructure, boosting electric vehicle adoption.
  • EnergyLOOP promotes circular economy by recycling renewable facility components.

What critics are saying

  • Increased competition in U.S. market may impact Iberdrola's growth.
  • Technological challenges could delay wind turbine blade recycling efforts.
  • Reliance on startups like RTS poses risks if they face operational difficulties.

What makes Iberdrola Group unique

  • Iberdrola invests in innovative materials like cork and aerogel for wind energy.
  • The company pioneers reforestation using drones and smart seeds with CO2 Revolution.
  • Iberdrola leads wind turbine blade recycling through its EnergyLOOP initiative.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Paid Vacation

401(k) Company Match

Health Insurance

Dental Insurance

Life Insurance

Company News

ESG Today
Mar 24th, 2025
Iberdrola Issues Green Bond Linked to its Share Price - ESG Today

Global energy and electricity provider Iberdrola announced that it has raised €400 million in a new green bond offering, with the bonds linked to the company’s share price, enabling investors to benefit from the performance of its shares. The new 5-year bonds are indexed to Iberdrola’s share price through the incorporation of a call option, […]

EU-Startups
Feb 10th, 2025
Nido secures €5 million to drive the energy transition through residential heat pumps | EU-Startups

Madrid-based Nido, a platform innovating the commercialisation, design, and installation of heat pump systems in the residential sector, has successfully

Iberdrola
Dec 23rd, 2024
Iberdrola and Avangrid reach an agreement to acquire 100% of the American company

Follow the latest news of Iberdrola and its business lines in the economic, financial, operational and sustainability areas

Capital Riesgo
Nov 23rd, 2024
Iberdrola invests in RTS for innovation

Iberdrola, through its Perseo startup program, has invested in the startup Revestimientos Técnicos Sostenibles (RTS) to advance innovative solutions for marine wind energy and energy-efficient building rehabilitation. This follows a three-year collaboration on materials like cork and aerogel for offshore wind structures. RTS, based in Utrera, Spain, joins Perseo's portfolio, which has invested over €200 million in sustainable energy technologies since 2008.

Renewables Now
Oct 22nd, 2024
Iberdrola gets EUR-120m EIB loan to speed up decarbonisation

Spanish utility Iberdrola SA (BME:IBE) has sealed a EUR-120-million (USD 129.8m) debt financing deal supporting research and innovation in the energy secto