Full-Time

Cyber Systems Architect

Posted on 7/11/2025

Deadline 7/29/25
Iberdrola Group

Iberdrola Group

10,001+ employees

Global utility generating renewable energy

Compensation Overview

$144.6k - $180.8k/yr

Company Does Not Provide H1B Sponsorship

Boston, MA, USA

In Person

Employees may be required to work in Connecticut, Maine, Massachusetts, and New York.

Category
IT & Security (1)
Requirements
  • BA/BS degree in Computer Science, Engineering, Business, or related field
  • 10 years in Information Security
  • 5 years of solution architecture and project implementation experience
  • Proficient in the Cybersecurity Solution Architecture discipline, processes, concepts, and best practices
  • Familiarity with laws, regulations, policies, and ethics as they relate to cybersecurity and privacy
  • Installation, integration, and optimization of system components
  • Industry-standard and organizationally accepted analysis principles and methods
  • Cybersecurity and privacy principles and organizational requirements (relevant to confidentiality, integrity, availability, authentication, nonrepudiation)
  • Operating systems
  • Security system and software design tools, methods, and techniques
  • Systems testing and evaluation methods
  • Critical infrastructure systems with information communication technology that were designed without system security considerations
  • Multi-level security systems and cross domain solutions
  • Operational Technology (OT) architectural concepts and patterns (e.g., baseline, validated design, and target architectures)
  • Cyber threats and vulnerabilities
Responsibilities
  • Define and prioritize essential system capabilities or business functions required for partial or full system restoration after a catastrophic failure event
  • Define appropriate levels of system availability based on critical system functions and ensure that system requirements identify appropriate disaster recovery and continuity of operations requirements to include any appropriate fail-over/alternate site requirements, backup requirements, and material supportability requirements for system recover/restoration
  • Develop/integrate cybersecurity designs for systems with multilevel security requirements
  • Document and address organization's information security, cybersecurity architecture, and systems security engineering requirements throughout the acquisition life cycle
  • Ensure that acquired or developed system(s) and architecture(s) are consistent with organization's cybersecurity architecture guidelines
  • Identify and prioritize critical business functions in collaboration with organizational stakeholders
  • Provide advice on project costs, design concepts, or design changes
  • Provide input on security requirements to be included in statements of work and other appropriate procurement documents
  • Provide input to the Risk Management Framework process activities and related documentation (e.g., system life-cycle support plans, concept of operations, operational procedures, and maintenance training materials)
  • Define and document how the implementation of a new system or new interfaces between systems impacts the security posture of the current environment
  • Analyze candidate architectures, allocate security services, and select security mechanisms
  • Develop a system security context, a preliminary system security Concept of Operations (CONOPS) and define baseline system security requirements in accordance with applicable cybersecurity requirements
  • Evaluate security architectures and designs to determine the adequacy of security design and architecture proposed or provided in response to requirements contained in acquisition documents
  • Write detailed functional specifications that document the architecture development process
  • Analyze user needs and requirements to plan architecture
  • Develop operational technology architecture or system components required to meet user needs
  • Document and update as necessary all definition and architecture activities
  • Determine the protection needs (i.e., security controls) for the information system(s) and network(s) and document appropriately
  • Translate proposed capabilities into technical requirements
  • Assess and design security management functions as related to cyberspace
Desired Qualifications
  • Network security architecture concepts including topology, protocols, components, and principles (e.g., application of defense-in-depth)
  • Computer networking concepts and protocols (especially OT), and network security methodologies
  • Physical and logical network devices and infrastructure to include hubs, switches, routers, firewalls, etc.
  • Demilitarized zones
  • Organizational process improvement concepts and process maturity models (e.g., Capability Maturity Model Integration (CMMI) for Development, CMMI for Services, and CMMI for Acquisitions)
  • Network systems management principles, models, methods (e.g., end-to-end systems performance monitoring), and tools
  • Network protocols such as TCP/IP, Dynamic Host Configuration, Domain Name System (DNS), and directory services and network security (e.g., encryption, firewalls, authentication, honey pots, perimeter protection)

Iberdrola is a Spanish electric utility that develops and delivers electricity from renewable sources such as wind, solar, hydro, and hydrogen. It generates, transmits, distributes, and sells power and also offers energy services like smart grids and efficiency solutions for homes and businesses. Its products work by producing clean electricity and delivering it through its networks while providing tools to improve energy use and grid performance. The company aims to accelerate the shift to a low-carbon economy by expanding renewables, modernizing grids, and investing in sustainable technologies across Europe, the US, Brazil, Mexico, and Australia.

Company Size

10,001+

Company Stage

IPO

Headquarters

Bilbao, Spain

Founded

2008

Simplify Jobs

Simplify's Take

What believers are saying

  • Neoenergia takeover grants control over Brazil's largest 40 million customer network.
  • £14 billion UK grid investment secures regulated long-term revenues.
  • 150,000 EV chargers by 2031 capture European mobility infrastructure.

What critics are saying

  • CADE antitrust probe blocks Neoenergia acquisition in 9-15 months.
  • Ofgem fines ScottishPower for UK network delays within 12-18 months.
  • EU CBAM tariffs collapse 30% EBITDA from Brazil Mexico exports post-2026.

What makes Iberdrola Group unique

  • Iberdrola leads with €21 billion renewables investment through 2028.
  • CORE center optimizes USA renewable assets remotely 24/7.
  • Puertollano green hydrogen plant produces 3,000 tonnes yearly.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Iberdrola Group who can refer or advise you

Benefits

Paid Vacation

401(k) Company Match

Health Insurance

Dental Insurance

Life Insurance

Company News

World Energy Council
Apr 2nd, 2026
Iberdrola Signs a Loan of 150 Million Euros With the Eib for Solar and Wind Energy in Italy - World-Energy

The loan will be used to build 400 MW of a portfolio of wind and photovoltaic projects in various locations in Italy. These will be Iberdrola’s first renewable plants in ItalyThe projects will make a significant contribution to Italy’s security of ene

Diari ARA
Apr 1st, 2026
Wallbox restructures $191.5M debt with Spanish banks as Catalan government takes stake

Wallbox, the Barcelona-based electric vehicle charging systems company, has closed a debt restructuring agreement worth €169.5 million with creditors representing over 83% of its financial debt. The deal includes a capital increase that will bring the Generalitat of Catalonia in as a shareholder. The agreement, pending judicial approval and scheduled for signing on 8 April, restructures existing debt into a €57.6 million framework loan and a €69.1 million bullet instrument, both maturing in December 2030. A working capital agreement of approximately €42.8 million was also reached. The restructuring includes a €10.65 million capital increase, with strategic shareholders contributing €5.65 million and the Generalitat adding €5 million. Participating banks will provide €12.5 million in new financing. CEO Enric Asunción said the agreement strengthens Wallbox's financial position.

Iberdrola
Mar 26th, 2026
ScottishPower secures £600m National Wealth Fund green financing for strategic UK subsea power link Eastern Green Link 4

ScottishPower, through its parent company Iberdrola, has secured £600 million in financing from the National Wealth Fund to support the development of the Eastern Green Link 4 project, a strategic electricity interconnector that will strengthen the UK's energy security and self-sufficiency, while helping to meet its

Yahoo Finance
Mar 24th, 2026
Iberdrola's US arm reaches 11 GW capacity across 100 projects in 25 states

Avangrid, the US arm of Spanish utility Iberdrola, has reached over 11 gigawatts of installed generation capacity across nearly 100 projects in 25 states. The company said its expanding portfolio helps meet surging energy demand driven by data centres powering AI development, new manufacturing and electrification initiatives. Avangrid produced 25,058 gigawatt hours of electricity in 2025, making the US Iberdrola's second-largest market by net production after Spain. The generation comprised primarily onshore wind, cogeneration and solar. Avangrid's projects paid $61 million in local tax revenue in 2025. The US accounted for $15.6 billion of Iberdrola's total asset base at yearend 2025. Iberdrola reported €6.29 billion in net profit for 2025, up 12 per cent year-on-year.

Bolsamania
Mar 12th, 2026
Iberdrola files takeover bid to acquire 100% of Brazilian subsidiary Neoenergia at $5.72 per share

Iberdrola has officially registered documentation for a public takeover offer for all shares of its Brazilian subsidiary Neoenergia not currently controlled by the group. The acquisition price is set at 32.5 Brazilian reals per share, adjusted for official interest and dividends declared by Neoenergia. The documentation has been submitted to Brazil's securities regulator Comissão de Valores Mobiliários and stock exchange B3. The offer, announced on 24 November 2025, covers 16.2% of Neoenergia's share capital, which would give Iberdrola 100% ownership. Neoenergia, with 90% of its business focused on electricity networks, serves nearly 40 million Brazilians through five distribution companies across six states and 18 transmission lines, making it Brazil's largest distribution group by customer count.

INACTIVE