Full-Time

Mechanical Design Engineer

Fuel Recycling

Oklo

Oklo

201-500 employees

Designs and deploys advanced fission reactors

Compensation Overview

$80k - $155k/yr

+ Equity

Santa Clara, CA, USA

In Person

Bachelor's, Master's

Category
Mechanical Engineering (1)
Required Skills
PTC Creo
GD&T
Quality Assurance (QA)
Materials Engineering
Robotics
Autodesk CFD
SolidWorks
FEM/FEA

Get referred to Oklo

See people who can refer or advise you

Requirements
  • A Bachelor's or higher degree in Mechanical Engineering or a related field such as Materials or Nuclear Engineering.
  • Five to ten years of experience taking mechanical systems from concept through detailed design, analysis, fabrication, and deployment.
  • Experience with custom mechanical design for equipment used in high-temperature or heavy industrial applications, such as nuclear, petrochemical, or mining industries.
  • Expert-level proficiency with computer-aided design software such as Siemens NX, CATIA, or SolidWorks, including 3D model generation and 2D fabrication drawings.
  • Broad familiarity with engineering principles and strong systems engineering intuition.
  • Working knowledge of material selection, particularly high-temperature alloys and corrosion-resistant metals, along with related manufacturing and joining techniques.
Responsibilities
  • Develop and own the mechanical design of process and system components within nuclear fuel recycling facilities.
  • Design and validate high-temperature and corrosion-resistant electrochemical process equipment suitable for high-radiation environments.
  • Incorporate design-for-automation principles to enable remote handling, inspection, and maintenance of systems and components.
  • Collaborate with other engineering teams to define design and functional requirements and ensure compliance with safety regulations and industry standards.
  • Lead and participate in formal design reviews, providing and integrating multidisciplinary technical feedback.
  • Generate and maintain 3D computer-aided design models, 2D drawings, and bills of materials in controlled product data management and product lifecycle management environments.
  • Prepare clear and traceable engineering documentation, including design rationales, functional requirements, and regulatory submissions.
  • Collaborate with fabrication partners and vendors to refine designs for manufacturability, cost effectiveness, and scalability.
  • Support equipment prototyping, testing, and commissioning at recycling development and deployment sites.
Desired Qualifications
  • Experience with electrochemical manufacturing processes such as electroplating, electrowinning, or pyroprocessing.
  • Experience designing equipment for operation above 500 degrees Celsius or in corrosive molten salt environments.
  • Experience designing for radiation tolerance or remote maintenance in nuclear or space systems.
  • Familiarity with design for automation, including integration with robotics and control systems for lights-out operations.
  • Experience designing heavy industrial equipment or pilot-scale systems with high reliability and extended maintenance intervals.
  • Experience with ANSYS or similar finite element analysis or computational fluid dynamics simulation software for structural and thermal analysis.
  • Knowledge of geometric dimensioning and tolerancing and design for manufacturability best practices.
  • Experience with balance-of-plant facility design and integration with automated process systems.
  • Experience in commercial or governmental nuclear projects.

Oklo designs and deploys advanced fission power plants, led by the Aurora reactor that can produce up to 15 MW of electricity and run for 10 years or more without refueling. The reactor uses a new fission approach that provides inherent safety and can recycle nuclear waste as fuel, including on-site waste recycling. It differs from traditional reactors by focusing on long-life, modular deployments licensed for a range of customers, such as industrial facilities, remote communities, and even space missions. Its goal is to provide clean, reliable, and affordable energy worldwide by expanding access to safe nuclear power and recycling nuclear waste as part of its energy solution.

Company Size

201-500

Company Stage

IPO

Headquarters

Sunnyvale, California

Founded

2013

Get referred to Oklo

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • July 23, 2026 DOE startup authorization cleared Groves for fuel loading and criticality.
  • Q2 2026 revenue reached $1.21 million, showing first meaningful operating income.
  • Oklo launched a $1 billion ATM program on September 11, 2026, extending runway.

What critics are saying

  • PJM removed Oklo's Ohio project on August 28, 2026; FERC delay threatens 2030 revenue.
  • Oklo still lacks commercial power sales; Aurora-INL targets late 2027 or 2028.
  • Kerrisdale's 2024 short report and 2025 securities probes spotlight disclosure and commercialization risk.

What makes Oklo unique

  • Aurora uses fast-reactor sodium cooling and EBR-II heritage, unlike light-water competitors.
  • Meta-backed Ohio campus in January 2026 targets 1.2 GW, not single-reactor pilots.
  • Groves achieved first criticality in September 2026, proving Oklo can reach milestones.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

401(k) Retirement Plan

401(k) Company Match

Flexible Paid Time Off

Flexible Work Hours

Company Equity

Health Savings Account/Flexible Spending Account

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-3%

2 year growth

-4%
TipRanks
Sep 11th, 2026
Oklo launches $1B at-the-market stock offering to fund advanced nuclear projects

Oklo has launched an at-the-market stock offering programme worth up to $1 billion. The advanced nuclear power company entered into an equity distribution agreement with a syndicate of investment banks on 11 September 2026. The shares will be issued under an existing shelf registration statement. The banks will act as sales agents and receive up to 1.5% commission on gross sales. The programme gives Oklo flexible access to capital, allowing it to raise funds incrementally as market conditions permit. This could strengthen its balance sheet to support ongoing operations and growth in its advanced nuclear projects. The arrangement introduces the possibility of dilution over time but signals Oklo's intent to finance strategic initiatives through capital markets.

Foreign Policy Journal
Aug 31st, 2026
Oklo (NYSE: OKLO) asks FERC to reinstate advanced nuclear project after PJM drops it from interconnection cycle.

Oklo (NYSE: OKLO) asks FERC to reinstate advanced nuclear project after PJM drops it from interconnection cycle. Oklo Inc. (NYSE: OKLO) has filed a complaint with the Federal Energy Regulatory Commission after grid operator PJM removed the company's advanced nuclear project from its interconnection study cycle. The dispute centers on Oklo's 750 MW mixed-technology generation project, designated "C01-1735," which combines advanced nuclear, natural gas, and fuel cell generation capacity. Oklo submitted its project data, signed agreement, and deposit information to PJM on April 27, 2026, for consideration in PJM's Cycle 01 interconnection queue. PJM subsequently identified deficiencies across six categories and directed Oklo to respond within ten business days or face removal from the study cycle. The six areas of concern identified by PJM were transformer information, generator information, project capability, point of interconnection, site control, and short circuit data. PJM's decision to withdraw the project from Cycle 01 carries significant consequences, with the company warning the move would result in a project delay of at least fourteen months. Oklo filed its complaint under FERC Docket No. EL26-101 on August 28, 2026, asking the regulator to direct PJM to reinstate the project in the current study cycle. The company also requested that FERC grant a waiver of certain tariff provisions to minimize disruption to Cycle 01 participants and preserve the project's timeline. Pre-construction work and site characterization activities are scheduled to begin in 2026, with the first phase of the project targeted to come online as early as 2030. Oklo has outlined plans to expand the facility incrementally, with the full build-out targeting a capacity of 1.2 GW by 2034, positioning it as a significant long-term power source. The project is located in Ohio, which sits within PJM's footprint, one of the largest electricity grid systems in the United States, giving the site strategic value in the national clean energy transition. The outcome of Oklo's FERC complaint could set an important precedent for how advanced nuclear developers navigate interconnection processes as demand for carbon-free baseload power accelerates.

Yahoo Finance
Aug 28th, 2026
Oklo shares rally 12% but remain down 38% YTD as pre-revenue nuclear firm faces regulatory hurdles

Oklo shares jumped over 12% on 25 August, reaching more than $44 per share. However, the small nuclear reactor company's stock is down more than 38% this year since going public through a SPAC in May 2025. The company has a market capitalisation of around $8 billion but generates no commercial energy income. Its first Small Modular Reactor, the Aurora Powerhouse, isn't expected to enter commercial operation for years. In the second quarter, Oklo reported a loss from operations of $124.2 million and a net loss of $81.6 million. The company has $1.6 billion in cash but $78.6 million in debt. Oklo's initial license application was denied by the Nuclear Regulatory Commission in 2022 due to gaps in safety baseline data.

Foreign Policy Journal
Aug 27th, 2026
Oklo Inc. (NYSE: OKLO) Aurora reactor draws on decades of proven fast reactor technology.

Oklo Inc. (NYSE: OKLO) Aurora reactor draws on decades of proven fast reactor technology. Oklo Inc.'s (NYSE: OKLO) Aurora Powerhouse reactor is built on fast reactor technology that has accumulated more than 400 reactor-years of operating experience worldwide. Fast reactors use liquid metal such as sodium to carry away heat, giving the technology a substantial real-world track record before Aurora has even come online. One of the most significant precedents for the Aurora design is the Experimental Breeder Reactor-II, known as EBR-II, which operated for approximately 30 years. EBR-II generated roughly 20 megawatts of electricity during its operational life, providing Oklo with a proven technical foundation on which to develop its commercial reactor concept. The EBR-II is particularly significant because it demonstrated how fast reactors can protect themselves during serious operational failures without human intervention. In safety tests conducted on EBR-II, operators intentionally shut off coolant pumps and disabled normal shutdown systems, yet the reactor naturally reduced its own power output and stabilized. Aurora uses similar self-protecting principles, meaning that if electricity or pumps fail, hot sodium continues moving naturally to remove heat without any external action required. As the Aurora reactor heats up, its metal fuel expands automatically, which slows the nuclear reaction and prevents dangerous overheating from occurring. Oklo is also applying direct lessons from EBR-II to its fuel strategy, with the company planning to use recycled EBR-II fuel in its first Aurora-INL reactor. Equipment for Oklo's fuel-fabrication facility is already being manufactured, and Aurora-INL has received a Department of Energy safety approval that allows final design and construction to proceed. Oklo currently targets the Aurora-INL reactor to begin operations sometime between late 2027 and early 2028, a timeline that hinges on continued regulatory and construction progress. Despite the technical momentum, Oklo shares have lost more than 38% so far this year, significantly underperforming the industry's marginal growth over the same period. The stock currently carries a Zacks Rank of 4, designated as Sell, reflecting cautious sentiment from the investment research firm's quantitative model. Oklo holds an average brokerage recommendation of 1.96 on a scale of 1 to 5, based on actual recommendations made by 23 brokerage firms covering the stock. In the small modular reactor space, NuScale Power (NYSE: SMR) remains the only developer with Nuclear Regulatory Commission design certification, with critical-path component design substantially complete and supplier agreements covering more than half its network. NuScale is also advancing potential deployments with TVA through its ENTRA1 program and a six-module RoPower project located in Romania. NextEra Energy (NYSE: NEE), meanwhile, is pursuing a different path entirely through its planned merger with Dominion Energy, which would give the combined company the second-largest nuclear fleet in the United States. NextEra Energy and Dominion expect that merger to close in the second half of 2027, subject to regulatory and shareholder approvals from both companies. For Oklo, the central investment case rests on whether its technically grounded Aurora design can translate decades of experimental reactor heritage into a commercially viable and timely product. The gap between proven nuclear science and delivered commercial power remains the critical variable that investors and industry observers are watching most closely.

Foreign Policy Journal
Aug 21st, 2026
Texas Capital cuts price targets on Oklo (NYSE: OKLO), nuscale (NYSE: SMR) and nano nuclear (NASDAQ: NNE) but names its top pick.

Texas Capital cuts price targets on Oklo (NYSE: OKLO), nuscale (NYSE: SMR) and nano nuclear (NASDAQ: NNE) but names its top pick. Texas Capital analyst Nate Pendleton revised price targets lower across three nuclear power stocks following their second-quarter earnings results, while maintaining Buy ratings on all three. Pendleton lowered his price target on Oklo Inc. (NYSE: OKLO) to $89 from $93, a level that still implies upside of more than 113% from the stock's last closing price. NuScale Power Corp. (NYSE: SMR) saw its price target cut more aggressively, dropping to $12 from $15, which implies approximately 32% upside from where shares last traded. Nano Nuclear Energy Inc. (NASDAQ: NNE) received a revised target of $39, down from $43, representing implied upside of nearly 114%, with Texas Capital retaining its Buy rating on the stock. Despite the broad-based reductions, Texas Capital named Oklo as its top pick within the nuclear power group, distinguishing it from the other two companies under coverage. The firm said all three companies have built strong balance sheets "to help de-risk execution, enhance vertical integration, and ultimately shift discussion from runway to capital allocation." Wall Street's broader consensus on OKLO reflects cautious optimism, with a 12-month average price target of $79.88 across 25 analysts, implying more than 91% upside from recent levels. Of those 25 analysts, 15 carry a Buy or higher rating on OKLO, nine rate it a Hold, and just one analyst has assigned a Strong Sell rating to the shares. SMR's consensus 12-month price target stands at $12.63, implying around 39% upside, with six of 18 analysts holding Buy or higher ratings and ten recommending a Hold. NNE carries the highest implied upside among the three based on consensus data, with an average 12-month target of $40.83 across seven analysts, five of whom rate the stock a Buy. On the earnings front, Oklo posted a Q2 loss per share of $0.28, wider than consensus expectations, though quarterly revenue of $1.21 million beat estimates as accelerated project execution drove performance. NuScale reported a Q2 loss per share of $0.13, in line with analyst estimates, but revenue collapsed to $75,000, down roughly 99.1% year over year from $8.05 million, reflecting a gap between project phases. Nano Nuclear posted a quarterly loss of $0.19 per share, narrower than consensus estimates, while revenue came in at approximately $210,000, falling short of Wall Street expectations. Retail sentiment on Stocktwits skewed bearish across all three stocks, with one user commenting "$OKLO $2 is fair value" and another writing "$SMR I can't think in what scenario this doesn't go down more." All three stocks have suffered significant year-to-date losses in 2026, with OKLO down more than 46%, SMR down more than 44%, and NNE shares lower by more than 33%.