Full-Time

Senior Civil Design Engineer Project Manager

EnSafe

EnSafe

501-1,000 employees

Multidisciplinary engineering, environmental, IT services

No salary listed

Dallas, TX, USA

In Person

Regional travel is required; national travel for client meetings is likely.

Bachelor's

Category
Architecture & Civil Engineering
Required Skills
CAD
AutoCAD
Marketing

Get referred to EnSafe

See people who can refer or advise you

Requirements
  • A bachelor's degree in civil engineering with Civil 3D or computer-aided design experience.
  • A minimum of 10 years of civil design experience, preferably with an engineering consulting firm.
  • A current Texas Professional Engineer license.
  • Experience with civil engineering design for municipal, commercial, and industrial clients.
  • Critical-thinking ability.
  • A strong work ethic and diligence.
  • The ability to work on multiple projects across numerous services in a challenging environment.
  • Experience with group management and mentoring.
  • Willingness to travel regionally, with likely national travel for client meetings.
Responsibilities
  • Serve as Project Manager and Lead Civil Engineer for local municipal, commercial, and industrial projects.
  • Manage civil engineering design from concept through completion, including design development, preparation of plans and specifications, coordination with local and state regulatory agencies, permitting, and development of bid documents.
  • Lead problem-solving efforts across multidisciplinary teams to deliver practical, cost-effective solutions.
  • Participate in and coordinate design, client, and construction meetings with internal teams, clients, and subcontractors.
  • Plan, schedule, and execute detailed phases of civil design work while maintaining quality, budget, and schedule.
  • Build and maintain strong client relationships and support the development of new and repeat business.
  • Provide proposal and marketing support, project and practice management, and client project involvement as appropriate.
Desired Qualifications
  • Civil design experience with an engineering consulting firm.

EnSafe provides multidisciplinary engineering, environmental, health and safety, and information technology services across the United States. The company works with urban developers and government agencies to support urban revitalization and brownfields projects, delivering comprehensive work plans and reports, and using tools and strategies designed to meet client needs. Its offerings are implemented through contracts and partnerships that include subcontracting and prime contracting, with a strong focus on supplier diversity and supporting academic communities. EnSafe differentiates itself by combining cross-disciplinary expertise with a commitment to community engagement, educational initiatives in science and engineering, and strategic relationships with small businesses to drive urban development. The company’s goal is to advance urban renewal and brownfield remediation through collaborative projects, public–private partnerships, and active community involvement.

Company Size

501-1,000

Company Stage

N/A

Total Funding

$100K

Headquarters

Memphis, Tennessee

Founded

1980

Get referred to EnSafe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • EnSafe grew to 565 employees by March 2026 and posted 143 openings.
  • June 2026 Porewater acquisition expands litigation support, forensic analysis, and environmental technology revenue.
  • May 2026 PFAS leadership hire targets the fastest-growing remediation market nationwide.

What critics are saying

  • PFAS specialization depends on regulatory spending; EPA enforcement slowdowns hit pipeline fast.
  • USACE and NAVFAC procurement concentrates revenue in few federal buyers through 2028.
  • A failed Buxton sampling phase would damage EnSafe's remediation credibility and JV follow-on work.

What makes EnSafe unique

  • 2026 acquisition of Porewater Solutions adds PFAS modeling and Visual PFAS software.
  • Dan Longbrake joined in May 2026 to lead national PFAS commercial growth.
  • EnSafe still wins defense and remediation work, including the 2026 Buxton FUDS JV.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Remote Work Options

Flexible Work Hours

Wellness Program

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

0%

2 year growth

1%
The Island Free Press
Aug 18th, 2026
Buxton FUDS sampling to begin in October following excavation work.

Buxton FUDS sampling to begin in October following excavation work. August 18, 2026 The Restoration Advisory Board (RAB) for the Buxton Naval Facility Formerly Used Defense Sites (FUDS) property held its latest quarterly public meeting on Thursday, August 13, from 5:30 to 7:30 p.m. at the Cape Hatteras Anglers Club in Buxton. Though the meeting was short, some changes have been made to future RAB projects. First, the RAB agreed to move from a fixed quarterly schedule to a bi-annual cadence, targeting January and July. This is not concrete, though, as they will guard the ability to call additional meetings if substantive new information arises (e.g., significant sampling results or any pertinent future decisions). What's more, Alyson Flynn with the North Carolina Coastal Federation is stepping down as a RAB member, nominating in her stead Dr. Lela Schlenker, who currently works at the NC Coastal Federation as a coastal advocate. Pending review from the RAB, her membership would maintain the same 13-member size. The meeting comes as the sampling phase is set to begin in October of this year. Excavation work completed by Bay West and the U.S. Army Corps of Engineers to remove petroleum-impacted soil was completed on April 11. The project included the following: * Over 17,000 cubic yards of impacted soil excavated and removed * Over 3.25 acres excavated to a minimum depth of 10 feet below ground surface * Over 315,000 gallons of impacted water removed * Over 275 feet of asbestos pipe removed * Over 5,000,000 pounds of concrete removed * Over 2,800,000 pounds of infrastructure debris removed (such as: abandoned utilities, fencing, asphalt, etc.) As the summer season winds down, the field sampling phase starts up in October and will last through November. Sampling efforts will be conducted by the joint venture of Nicklaus Engineering and EnSafe Engineering to investigate the site for any residual petroleum contamination that may have been left behind. This new phase of work includes two mobilization efforts, as presented by David Clexton, Principal for Nicklaus Engineering, in the last quarter's meeting: Complete High Resolution Site Characterization (HRSC) at the 110 location along the site map via: * Direct Push Technology (DPT) to drill for sand and groundwater sampling * Optical Image Profiler and Hydraulic Profiling Tools (OIHPT) to detect petroleum product in soil, as well as soil permeability, type, and lithology. * Membrane Interface and Hydraulic Profiling Tool (MIHPT): detects volatile and semi-volatile petroleum hydrocarbons (SVOCs) in subsurface. Collect deep groundwater samples at locations where exceedances are observed during the first mobilization. * This includes vertical groundwater delineation * Going up to 33 feet deeper, if circumstances prevail Again, the sampling is neither inherently constrained to the existing map - if the situation dictates, and evidenced contamination leads beyond the scope of the site, they are allowed to sample further. The sampling is also not restricted to petroleum, but other potentially harmful substances such as PFAS and PCB, though not across the entire grid. It must be noted that, however, the primary scope of this entire project is to mitigate petroleum and no other sources of contamination. If more exceeding contamination is found, there are a multitude of remediation options. Most importantly, if any exceedances are found and prompt a return to the field before the full report, the RAB will receive documentation in monthly/weekly updates, explaining why additional sampling is occurring. These findings will also be documented in the Corrective Action Plan to address any further work that may be required, but that would not be funded until the end of 2028's fiscal year. The parties stated that by June of next year they will have a first draft of a report highlighting all funds it's during this phase, but with the caveat that interim updates may be provided as soon as December or January, if there is sufficient - and, as USACE reiterated, validated - data available. In addition, USACE has provided physical copies of all pertinent documents related to the work done at the FUDS site for public accessibility at the Fessenden Center in Buxton. Background The Buxton Naval Facility was originally constructed and operated by the U.S. Navy during the Cold War as a submarine monitoring station, before later use by the U.S. Coast Guard and eventual transfer back to the National Park Service as part of the Cape Hatteras National Seashore. Environmental investigations conducted decades after the site's closure identified contamination tied to historic military operations, including petroleum products associated with fuel storage and power generation. Cleanup efforts are being carried out under the federal FUDS program, which is administered by USACE. The next RAB meeting will take place on January 21, 2027, unless otherwise scheduled.

EnSafe
Jun 1st, 2026
EnSafe Acquires Canada-based Firm, Porewater Solutions

EnSafe acquires Porewater Solutions, enhancing PFAS modeling, visualization, remediation, and environmental technology services for clients worldwide.

EnSafe
May 11th, 2026
EnSafe hires national Commercial Business development/pfas Market Lead.

EnSafe hires national Commercial Business development/pfas Market Lead. EnSafe, a global provider of environmental, engineering, health and safety, and technology services, is pleased to announce the addition of Dan Longbrake as Commercial Business Development Director and National PFAS Market Lead. Dan will play a key role in advancing EnSafe's commercial growth strategy and strengthening its position as a leader in PFAS solutions. Over his career, Dan has developed and executed go-to-market strategies for environmental solutions, most recently PFAS remedial technologies. He has a proven track record of driving business growth through building strategic partnerships and delivering innovative solutions. Dan has also led large-scale programs and has a strong background in managing client relationships, mentoring teams, and identifying new market opportunities. His leadership will help drive EnSafe's continued growth in the rapidly evolving PFAS landscape. Dan shared his enthusiasm about joining EnSafe, stating: "I am thrilled to join an organization like EnSafe to lead and help accelerate growth in our commercial markets and national PFAS practice. I look forward to collaborating with our outstanding professionals, our partners, and clients to bring innovative and creative solutions that enhance resiliency and mitigate risk." "We are thrilled to have Dan join our team, leading commercial business development and PFAS services nationwide. His background in cutting-edge PFAS remedial technologies and their applicability will be invaluable as the regulatory landscape unfolds," stated Ginny Davis, Vice President, Business Development at EnSafe. With Dan's addition, EnSafe is well-positioned to continue expanding its PFAS services and delivering innovative, client-focused solutions nationwide. Founded in 1980, Memphis-based EnSafe now has over 460 employees in 20 offices throughout the U.S., from New Hampshire to California. If you would like more information about this announcement, please contact Dan Longbrake at [email protected] or Ginny Davis at [email protected].

EnSafe
Apr 7th, 2026
EnSafe announces Brad Reddick, PG, as Business Lead in Bowling Green.

EnSafe announces Brad Reddick, PG, as Business Lead in Bowling Green. EnSafe is excited to announce that Brad Reddick, PG, has been named Business Lead of its Bowling Green office. Brad earned a Bachelor of Science in Geology from Rocky Mountain College in Billings, Montana. He joined EnSafe's Bowling Green office in 2015, where he manages a diverse portfolio of projects, including due diligence, environmental assessments, remediation, Navy Clean work, and compliance. During his time with EnSafe, Brad has played a key role in strengthening client partnerships and supporting successful project delivery. In his role as Business Lead, he will focus on driving growth in the Bowling Green area, mentoring staff, and ensuring continued high-quality service for its clients. Ric Federico, PG, CHMM, CMQ/OE, HEM, expressed enthusiasm about what this next chapter brings for the Bowling Green office: "Brad epitomizes what it means to be an EnSafer, always giving his best to our clients and, equally as important, our staff. He has long demonstrated his commitment to the success of his team and of the Bowling Green office, and I'm excited to see him grow in the Business Lead role." As he steps into this leadership role, Brad shared: "I'm honored to step into the Bowling Green Business Lead role and grateful to the past leaders and mentors who paved the way and set a high standard for our office. I'm committed to growing our office, broadening our client base, and promoting the EnSafe culture every day, bringing safety, integrity, and excellence to every project and relationship." EnSafe Inc is excited to see Brad step into this role and all that he'll accomplish. Please join EnSafe Inc in congratulating him on his new role as Business Lead in the Bowling Green office!

U.S. Securities and Exchange Commission
May 2nd, 2025
SEC FORM D

The Securities and Exchange Commission has not necessarily reviewed the information in this filing and has not determined if it is accurate and complete.The reader should not assume that the information is accurate and complete.