Full-Time

Operations Stability Engineer 3

Ercot

Ercot

501-1,000 employees

Manages Texas electric grid operations

Compensation Overview

$87k - $120k/yr

Taylor, TX, USA

Hybrid

At least two days on-site per week are expected; remote work must be performed within Texas.

Bachelor's, Master's, PhD

Category
Electrical Engineering (1)
Required Skills
Python

Get referred to Ercot

See people who can refer or advise you

Requirements
  • A bachelor's degree in Electrical Engineering or a related field is required.
  • Engineer 3 candidates must have a minimum of 3 years of progressively responsible experience as a power system engineer or in a similar role, in addition to degree requirements.
  • Knowledge of dynamic modeling of power systems, especially inverter-based resources deployed in solar, wind, and battery plants.
  • Experience performing large-scale dynamic stability analyses using power system simulation tools such as TSAT and PSSE.
  • Experience evaluating and updating power system dynamic models, especially inverter-based resource models.
  • Experience programming and developing simulation automation tools using Python.
  • Experience assisting in improvements to transmission planning processes and familiarity with NERC reliability standards.
Responsibilities
  • Provide electrical engineering analysis and technical support for planning and operations of the electric power system.
  • Implement system modeling and develop tools and procedures to monitor and control the system.
  • Perform system stability assessments and analyze simulated or actual operating results.
  • Develop solutions to current or future system stability issues and report findings and recommendations.
  • Design and perform steady-state and dynamic contingency analyses using power system simulation models such as PSSE, VSAT, or TSAT.
  • Run scenarios and input variations, analyze study accuracy, assign confidence metrics, formulate conclusions and recommendations, and prepare reports and presentations.
  • Structure stability studies to determine system operating limits.
  • Assist in preparing study reports and procedures for ERCOT management, NERC, and other entities.
  • Review stakeholder reports for appropriate technical content and accuracy.
  • Work independently on assignments and projects.
  • Serve as a technical subject matter expert for the department.
  • Make independent decisions on complex engineering issues and resolve them using effective technical solutions.
  • Coordinate presentations and participate in stakeholder meetings with ERCOT personnel, market participants, and industry regulatory agencies.
  • Guide projects and teammates through professional expertise.
  • Mentor and advise less experienced engineers and analysts.
  • Lead multifunctional teams to obtain input, address comments, and perform studies.
  • Use power system software applications, spreadsheet programs, and database programs as an expert user.
  • Maintain knowledge of emerging trends and industry best practices.
Desired Qualifications
  • Experience within the electric utility industry.
  • Experience with controls and power electronics modeling of power electronics loads such as power supplies, uninterruptible power supplies, and electrolyzers.
  • Experience with PSCAD for modeling and simulations of inverter-based resources.
  • Experience performing post-dynamic-event analysis and dynamic model validation using phasor measurement unit and/or digital fault recorder data.
  • Experience with the Energy Management System.
  • Understanding of and direct experience with IEEE 2800.

ERCOT coordinates the flow of electric power for about 27 million Texas customers as the region's independent system operator. It manages the grid with many miles of transmission lines and hundreds of generation units, schedules power, and handles wholesale market settlements and retail switching in competitive areas. It operates as a nonprofit, membership-based organization overseen by state regulators, bringing together consumers, generators, retailers, and utilities to run the market and grid. Its goal is to keep Texas’ electric grid reliable and markets functioning smoothly for customers.

Company Size

501-1,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Austin, Texas

Founded

1970

Get referred to Ercot

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • The August 2026 audit creates stricter screening and more confidence for large-load connections.
  • The March 26, 2026 UT partnership strengthens ERCOT’s grid simulation and stability toolkit.
  • Peak demand hit 75,572 MW in January 2026, validating ERCOT’s central market role.

What critics are saying

  • Abbott’s August 3, 2026 audit pauses data-center approvals for months.
  • ERCOT faces 474 gigawatts of proposed demand, overwhelming forecasts and interconnection planning.
  • If 765-kV line permits stall, ERCOT risks Permian Basin rolling blackouts next summer.

What makes Ercot unique

  • ERCOT runs Texas’s isolated grid for 27 million customers, unlike regional U.S. operators.
  • Batch Zero, launched in 2026, formalizes data-center interconnection reviews across 1,800 projects.
  • GRIT and UT Austin research inverter-based resources before reliability failures hit operations.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Remote Work Options

Flexible Work Hours

Health Insurance

Paid Vacation

PTO/vacation

Company News

KRGV-TV
Aug 14th, 2026
Texas will audit up to 300 projects, mostly data centers, after Gov. Greg Abbott's order.

Texas will audit up to 300 projects, mostly data centers, after Gov. Greg Abbott's order. By: Paul Cobler The audit and verification of data centers ordered by Gov. Greg Abbott will involve about 250 to 300 projects, most of which are data centers, state grid operator officials told the Public Utility Commission on Friday. The officials' testimony also highlighted just how data significant the buildout is: The 200 gigawatt of future demand accounted for by the projects that will be audited is more than twice the ERCOT grid's peak demand record set last month. It will take the Electric Reliability Council of Texas "several months" to audit the projects, which must be completed before any data center can be approved for connection to the state grid, according to Abbott's Aug. 3 directive to ERCOT and the PUCT. ERCOT had already planned on assessing large load projects seeking to connect to the grid as a part of a process already underway, but Abbott's audit order moves up the checks to first priority and adds some more requirements, officials said. "With the governor's letter, what we're really doing is moving that verification process now to the front of the line before we begin the interconnection study process," said Chad Seely, general counsel and senior vice president of regulatory policy for ERCOT. Friday's emergency meeting of the PUCT was the first public discussion the state regulator and state grid operator have had since Abbott ordered the pause on data center approvals amid public backlash to the accelerating buildout of the facilities statewide. The meeting clarified that the audit is limited to projects under consideration in ERCOT's "Batch Zero" study, or the process the grid operator has been undertaking since the start of the year. The study aims to organize its grid approval process as more than 1,800 individual projects - 90% of which are data centers - overwhelmed the queue in recent years. Projects were previously studied and approved on an individual basis, but the crush of requests for energization has forced ERCOT to introduce a new process of studying and approving the projects in batches. The work involved in Abbott's audit directive was already planned under the Batch Zero study - it just adds a few more standards data center projects have to meet, ERCOT officials said. Spot checks were going to be conducted on the 250 to 300 projects eligible in the first batch of projects moving through the queue, and ERCOT is now planning to simply conduct those checks now before moving ahead with the rest of the study. "The goal of the verification audit is to provide more certainty and confidence in the Batch Zero process," said Thomas Gleeson, chair of the PUCT. While Abbott's order was limited to data centers in the queue, a "handful" of the projects that will be audited are traditional large-load energy users, like a factory, ERCOT officials said. ERCOT, last week, was supposed to notify developers of projects that are being included in the first batch study, but that notification was put on hold at the request of ERCOT following Abbott's Aug. 3 letter. Seely said ERCOT is still aiming to complete its study of the first batch of projects by its original deadline of April. Both ERCOT and representatives of data center companies have stated many of the more than 1,800 projects in the queue, totaling more than 474 gw of potential demand, are unlikely to come to fruition because those projects lack elements such as financing and companies that have agreed to lease server space from the data center, if constructed. However, the size of the queue has prevented ERCOT from issuing demand forecasts for the grid, making it unclear just how many will actually be built and energized in the coming years. Experts call the Batch Zero study a first-of-its-kind effort by a U.S. grid operator to formalize an approval process better equipped to address data centers' energy demands. Since Abbott ordered the audit, at least 43 companies constructing data centers have issued public comments in support of Abbott's approach. Abbott, in his own news release, has touted each of the companies' announcements, saying his directives will address public concern around the facilities. "I established clear guardrails to ensure data centers protect our electric grid, conserve our water, respect our neighborhoods, and pay their own way," Abbott wrote in a statement accompanying the latest group of companies to sign off on the approach, issued shortly before the PUCT meeting began Friday. "They must not pass costs on to Texas families or interfere with their quality of life." Abbott's Aug. 3 letter said the audit should ensure data center developers provide information on tax breaks they will receive; power use and generation; water use and cooling operations; efforts to reduce impacts on local communities; and ownership of the facility. Any projects that fail Abbott's ordered "comprehensive verification and audit" should be denied connection to the grid, the governor said. Abbott in June also directed the PUCT to ensure data center interconnections to the grid will result in reduced electricity rates for residential customers and that data centers pay the cost of any new transmission infrastructure needed to serve them. Closely tied to the data center controversy is ERCOT's plan to build massive 765 kilovolt transmission lines across much of the state, aimed at relieving growing transmission congestion caused by growing energy demand. Residents living along the lines' proposed routes, three of which extend hundreds of miles from the eastern half of the state to the Permian Basin, have been frustrated by the PUCT's approval process for the lines, arguing it is too short for landowners to participate in the process. Following a Senate interim committee hearing in late July that featured hours of testimony by residents opposed to the transmission lines, several legislators and Lt. Gov. Dan Patrick called on the PUCT to deny any certificate of convenience and necessity application, or CCN, by transmission companies to build the 765 kv lines until the Legislature can meet to revise its approval process. A denial of the CCN would effectively kill the project, although the companies could refile their application to start the process anew. "The only remedy to this is denial of all applications of CCN, thus allowing the Legislature, the peoples' representatives, to take up this issue in the next legislative session," state Rep. Brad Buckley, R-Salado, told the commissioners Friday. Officials from ERCOT testified during the July committee hearing that without the transmission lines, the Permian Basin could face rolling blackouts by next summer. On Friday, commissioners discussed the latest developments in the transmission line buildout but made no formal decision about any individual application. More than 20 landowners living near the proposed routes attended the meeting to testify in opposition to the lines.

TheEnergyMag
Jun 16th, 2026
Cipher names former ERCOT executive as Head of Grid Strategies.

Cipher names former ERCOT executive as Head of Grid Strategies. By TheEnergyMag AI AI-generated image: synthetic visual, not an actual depiction of events, people, or locations. Key takeaways. * Bill Blevins appointed Head of Grid Strategies at Cipher Digital. * Blevins has over 30 years of experience in power systems and grid operations. * Previously served as Director of Grid Coordination at ERCOT. * Played a significant role in ERCOT's transition to the Nodal Market in 2011. * Worked at NERC and Duke Energy before ERCOT. * The Blevins Solar Project was named in his honor in 2024. * Blevins will report to Cipher's Co-President and CLO, Will Iwaschuk. * Appointment strengthens Cipher's power sourcing and data center development capabilities. Cipher Digital (NASDAQ: CIFR) has appointed former ERCOT executive Bill Blevins as head of grid strategies, adding a senior power-systems operator as the company scales its industrial data center pipeline in Texas and other US markets. Blevins will lead Cipher's grid strategy, including efforts to source and secure power and support the company's development pipeline, the New York-based company said Tuesday. He will report to Will Iwaschuk, Cipher's co-president and chief legal officer. The appointment comes as power access, interconnection timing and grid operations have become central to the data center industry's expansion. Cipher, previously known largely as a bitcoin miner, has increasingly positioned itself as a developer, owner and operator of industrial-scale data centers serving high-performance computing and AI workloads. That shift has made power strategy a core part of execution, particularly in Texas, where Cipher has built much of its operating base and development pipeline. Blevins joins Cipher from the Electric Reliability Council of Texas, where he served as director of grid coordination. During his time at ERCOT, he also held roles including manager of operations support and manager of operations planning, and was involved in grid operations as ERCOT transitioned to its nodal market in 2011. Before ERCOT, Blevins worked at the North American Electric Reliability Corporation and Duke Energy (NYSE: DUK). His background spans more than three decades across grid operations, reliability and nuclear power, according to Cipher. In 2024, the Blevins Solar Project, a campus with 270 megawatts of solar generation and 180 megawatts, or 360 megawatt-hours, of battery storage, was named in his honor. The role highlights how data center developers are increasingly competing not only on access to land, capital and customers, but also on their ability to navigate grid constraints. AI and high-performance computing campuses can require hundreds of megawatts of power at a single site, turning power procurement, transmission planning, curtailment capability and market participation into core commercial functions. Cipher's appointment of Blevins also follows a series of financing and development moves aimed at expanding its data center business. Earlier this month, the company priced an $810 million senior secured note offering through its Stingray Compute subsidiary to help finance the Stingray data center. That followed a broader push to convert Cipher's power-backed site portfolio into contracted data center capacity for hyperscale and high-performance computing customers. This article was generated with the support of our AI agent, which has been rigorously trained under the supervision of well-qualified journalists. While we strive for the highest quality in every article, if you find anything amiss, please contact us to let us know.

Uvalde Hesperian
Mar 26th, 2026
ERCOT and University of Texas partner to research next-generation energy technologies.

ERCOT and University of Texas partner to research next-generation energy technologies. (Austin, TX) - The Electric Reliability Council of Texas, Inc. (ERCOT) today announced a collaboration with The University of Texas (UT) at Austin to study how fast-growing inverter-based technologies, like those used in solar, wind, and battery storage systems, can enhance grid reliability. Today's announcement is part of ERCOT's ongoing efforts to utilize emerging technologies and innovation to meet growing electric demand. Inverter-based technologies generate electricity as Direct Current (DC) - the same type of power stored in a household battery - which must be converted to Alternating Current (AC) before it can flow into the grid. This conversion is handled automatically by an electronic device called an inverter. As these technologies become an increasingly larger part of the grid, understanding their impact is critical to maintaining reliable power for Texas homes and businesses. As part of ERCOT's Grid Research, Innovation, and Transformation (GRIT) program, UT will help ERCOT anticipate challenges related to simulation platforms, control interactions, and power quality issues that may come with very high penetrations of inverter-based resources on the Texas electric grid. "Given the complexity and rapid development of this technology, this collaboration will help us look into the future, anticipate challenges, and identify solutions while we still have some time to prepare," said Prashant Kansal, ERCOT Director of Grid Transformation. "By combining ERCOT's operational insights and UT's research expertise, Texans will benefit from a stronger, more reliable grid." Under this partnership, UT researchers will build computer simulations and models of inverter-based resources interconnected with the electric grid to test reliability in a range of potential real-world scenarios. "Inverter-based resources are emerging rapidly and are very promising. However, their controllers introduce new behavior in grids and must be carefully coordinated," said Professor Brian Johnson of UT's Department of Electrical and Computer Engineering. UT Professor Surya Santoso noted, "By studying their behavior under a wide variety of control and operating conditions, reliability, harmonics, and other power-quality-interaction risks can be better understood and managed." The findings will help determine whether these risks warrant additional monitoring and guide the implementation of mitigation strategies. Fred Huang, ERCOT Senior Director, Grid Stability Analysis, said, "The ability to identify potential issues before they arise and develop practical solutions applicable to real-world grid operations helps ERCOT create a more reliable grid to serve Texans and meet the state's evolving power needs." About Grid Research, Innovation, and Transformation (GRIT) ERCOT's Grid Research, Innovation, and Transformation (GRIT) initiative utilizes research and collaboration to identify and test emerging technologies that will better prepare the grid to meet increasing demands. Visit the GRIT webpages to learn more. ERCOT, the Electric Reliability Council of Texas, manages the flow of electric power to more than 27 million Texas customers, representing about 90 percent of the state's electric load. As the Independent System Operator for the region, ERCOT schedules power on an electric grid that connects 55,000+ miles of transmission lines and 1,460+ generation units, including Private Use Networks. ERCOT also performs financial settlement for the competitive wholesale bulk-power market and administers retail switching for more than 8 million premises in competitive choice areas. ERCOT is a membership-based 501(c)(4) nonprofit corporation, governed by a board of directors and subject to oversight by the Public Utility Commission of Texas and the Texas Legislature. Post Views: 4

Steering Committee of Cities Served by Oncor
Sep 24th, 2025
ERCOT Announces New Collaborative Initiative to Promote Emerging Technologies

ERCOT also announced that it has launched a new GRIT section on its website.

CoinsHolder
Jul 2nd, 2025
Powerledger's TraceX Integrates with ERCOT for Enhanced REC Trading

Powerledger has announced the integration of its renewable energy certificates (RECs) trading platform, TraceX, with the Electric Reliability Council of Texas (ERCOT).